← Back
Elevator cooperative
82 IRVING PLACE
MANHATTAN · BIN 1017915
💬 Discuss this project
1950Year Built
6Stories
D4Building Class
R8BZoning
28,500 sfGross Floor Area
42Units
LL97 CoveredRent Stabilized1 Open Violation ▸
Elevator cooperative · Owner of record: IRVING EQUITIES INC · 5,716 sf lot · 4.99 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 21p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Basement6p · 2 filings · 20 docs
6 jobs · most recent 06/23/2025
General Wiring
FiledStatusContractorScope
06/23/2025Permit IssuedK.N.C ELECTRIC INCGeneral Wiring
09/24/2024CompleteARMA ELECTRIC INCGeneral Wiring
02/01/2022CompleteELPO ELECTRICAL CONTG INCGeneral Wiring
12/02/2021CompleteELPO ELECTRICAL CONTG INCGeneral Wiring
09/29/2021Permit IssuedRICHARD NEU—
06/30/2020CompleteGOTHAM WIRING LICENSED—
1 job · most recent 09/30/2021
Sidewalk Shed
FiledStatusContractorScope
09/30/2021Permit IssuedRELIABLE ENTERPRISES INCSidewalk Shed
Building Lifecycle
All (117)Filed (21)Permit Issued (17)Signed Off (13)Violation (16)Inspection (6)Objection (14)Special Inspection (30)
04/29/2026
Violation issued (HPD, open)
A
04/16/2026
Signed off — Alteration
APPLICATION HEREWITH FILED FOR INTERIOR RENOVATION TO THE KITCHEN AND BATHROOM OF AN EXISTING CLASS A APARTMENT # 6A ON THE 5TH FLOOR OF AN EXISTING MULTI-FAMILY DWELLING BUILDING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01227480-I1
01/12/2026
Signed off — Alteration
REPLACEMENT BOILER AND GAS BURNER.
M01198563-S1
12/16/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/17/2025
Signed off — Alteration
REPLACEMENT BOILER AND GAS BURNER.
M01198563-I1
10/17/2025
Signed off — Alteration
REPLACEMENT BOILER AND GAS BURNER.
M01198563-S2
09/10/2025
Filed — Alteration
REPLACEMENT BOILER AND GAS BURNER.
M01198563-P1
09/10/2025
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
09/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
08/28/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/27/2025
Permit issued — General Construction
M01227480-I1-GC
08/04/2025
Objection raised — Cost
08/04/2025
Objection resolved — Addressed
07/30/2025
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
07/17/2025
Objection resolved — Addressed
07/17/2025
Objection resolved — Addressed
07/17/2025
Objection resolved — Addressed
07/16/2025
Signed off — Alteration
REPLACEMENT BOILER AND GAS BURNER.
M01198563-S3
07/16/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/11/2025
Objection raised — Structural
07/11/2025
Objection raised — Structural
07/11/2025
Objection raised — Structural
06/30/2025
Objection resolved — Addressed
06/27/2025
Objection raised — Admin
06/16/2025
Filed — Alteration
APPLICATION HEREWITH FILED FOR INTERIOR RENOVATION TO THE KITCHEN AND BATHROOM OF AN EXISTING CLASS A APARTMENT # 6A ON THE 5TH FLOOR OF AN EXISTING MULTI-FAMILY DWELLING BUILDING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01227480-I1
05/09/2025
Permit issued — Boiler Equipment
M01198563-S2-BE
05/09/2025
Permit issued — Plumbing
M01198563-S1-PL
05/08/2025
Permit issued — Boiler Equipment
M01198563-I1-BE
05/06/2025
Permit issued — General Construction
M01198563-S3-GC
04/25/2025
Filed — Alteration
REPLACEMENT BOILER AND GAS BURNER.
M01198563-S2
04/24/2025
Filed — Alteration
REPLACEMENT BOILER AND GAS BURNER.
M01198563-S1
04/24/2025
Filed — Alteration
REPLACEMENT BOILER AND GAS BURNER.
M01198563-I1
04/24/2025
Filed — Alteration
REPLACEMENT BOILER AND GAS BURNER.
M01198563-S3
04/23/2025
Special inspection requirement — Maintenance information
LOUIS ARENA
04/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
04/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
04/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
04/02/2025
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
04/01/2025
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
04/01/2025
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
03/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
03/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
03/21/2025
Special inspection requirement — Final
LOUIS ARENA
03/21/2025
Special inspection requirement — Maintenance information
LOUIS ARENA
03/21/2025
Special inspection requirement — Chimneys and vents
LOUIS ARENA
03/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
03/20/2025
Special inspection requirement — Heating Systems
LOUIS ARENA
04/01/2024
Violation issued (HPD, closed)
A
01/26/2024
Signed off — Alteration
Replace 1 defective steel lintel over a 5th floor window on the south facade.
M08040639-I1
01/20/2023
Permit issued — General Construction
M08040639-I1-GC
12/27/2022
Filed — Alteration
Replace 1 defective steel lintel over a 5th floor window on the south facade.
M08040639-I1
12/26/2022
Special inspection requirement — Tenant Protection Plan Compliance
JAMES MOORE
11/21/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES MOORE
11/15/2022
Special inspection requirement — Final
JAMES MOORE
08/10/2022
Signed off — Alteration
Plumbing work including kitchen, laundry room and bathrooms in duplex Apartment ( #1D, #2D, #2E) on the 1st and Basement. Replace BBQ in the rear yard (OSP). No change to use, egress,or occupancy.
M00338047-I1
06/28/2022
Signed off — Alteration
HEREWITH FILE TO RENOVATE EXIST. UNIT #1C. WORK INCLUDES NEW REPLACE/RELOCATE PLUMBING FIXTURES WITH ASSOCIATED PIPING WORK INVOLVED, AND FIRE-STOPPING PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
M00619046-S1
06/27/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/11/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/09/2022
Signed off — Alteration
HEREWITH FILE TO RENOVATE EXIST. UNIT #1C. WORK INCLUDES NEW REPLACE/RELOCATE PLUMBING FIXTURES WITH ASSOCIATED PIPING WORK INVOLVED, AND FIRE-STOPPING PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
M00619046-I1
05/26/2022
Filed — Alteration
Plumbing work including kitchen, laundry room and bathrooms in duplex Apartment ( #1D, #2D, #2E) on the 1st and Basement. Replace BBQ in the rear yard (OSP). No change to use, egress,or occupancy.
M00338047-P4
Latest 60 of 117 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RELIABLE ENTERPRISES807/08/2026
IRVING EQUITIES5003/22/2026
IRVING EQUITIES INC ATT/S203/22/2026
KENCON103/22/2026
IRVING EQUITIES INC C O ARGO803/21/2026
ARGO REAL ESTATE MANAGEMENT203/21/2026
ARGO MANAGEMENT103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J CALLAHAN CONSULTING1603/21/2026
M-DIS DESIGN GROUP203/21/2026
NEW YORK ENGINEERING503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EXPRESS RENOVATIONS INCGeneral Contractor1007/08/2026
RELIABLE ENTERPRISES INCGeneral Contractor407/08/2026
SCARPONI&SON PLBG&HTG CORPlumbing307/08/2026
6TH AVENUE CONSTRUCTION &General Contractor307/08/2026
AP PLUMBING & HVAC LLCPlumbing307/08/2026
MMI MECHANICAL INCGeneral Contractor203/21/2026
TISHEH CONSTRUCTION CORPGeneral Contractor203/21/2026
K.N.C ELECTRIC INCElectrical103/22/2026
BABA CONSTRUCTION CORPGeneral Contractor104/09/2026
ARMA ELECTRIC INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851404/25/2025
MOORE ENG. OF NY, DPC9134112/27/2022
SEAD ENGINEERING PC2665211/17/2021
DOMANI INSPECTION SERVICE843309/30/2021
MOORE ASSOCIATES, LLC3408104/16/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offBABA CONSTRUCTION CORP08/27/2025
DOB NOWBoiler EquipmentSigned-offCROSSFIELD PLBG.&HTG05/09/2025
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG05/09/2025
DOB NOWBoiler EquipmentSigned-offCROSSFIELD PLBG.&HTG05/08/2025
DOB NOWGeneral ConstructionSigned-offMMI MECHANICAL INC05/06/2025
DOB NOWGeneral ConstructionSigned-off6TH AVENUE CONSTRUCTION &01/20/2023
DOB NOWPlumbingSigned-offSCARPONI&SON PLBG&HTG COR04/05/2022
DOB NOWGeneral ConstructionSigned-off6TH AVENUE CONSTRUCTION &04/01/2022
DOB NOWPlumbingSigned-offSCARPONI&SON PLBG&HTG COR02/08/2022
DOB NOWGeneral ConstructionSigned-offEXPRESS RENOVATIONS INC01/21/2022
DOB NOWGeneral ConstructionSigned-offEXPRESS RENOVATIONS INC10/08/2021
DOB NOWSidewalk ShedPermit IssuedRELIABLE ENTERPRISES INC10/01/2021
DOB NOWSupported ScaffoldPermit IssuedRELIABLE ENTERPRISES INC10/01/2021
DOB NOWMechanical SystemsSigned-offEXPRESS RENOVATIONS INC07/25/2021
DOB NOWGeneral ConstructionSigned-offEXPRESS RENOVATIONS INC07/22/2021
DOB NOWGeneral ConstructionSigned-offTISHEH CONSTRUCTION CORP06/30/2021
DOB NOWPlumbingSigned-offSCARPONI&SON PLBG&HTG COR01/07/2021
BISOTISSUEDEXPRESS RENOVATIONS INC10/08/2021
BISOTISSUEDEXPRESS RENOVATIONS INC10/08/2021
BISPLISSUEDDEMAR PLUMBING CORP09/15/2021
BISOTISSUEDEXPRESS RENOVATIONS INC03/11/2021
BISOTISSUEDEXPRESS RENOVATIONS INC10/05/2020
BISOTISSUEDEXPRESS RENOVATIONS INC08/31/2020
BISOTISSUEDB & H RESTORATION INC10/06/2016
BISPLISSUEDSAFETY PLMBG & HTG LLC06/10/2016
BISOTISSUEDERBI CONTRACTOR INC06/07/2016
BISPLISSUEDDAVID JABLON12/19/2013
BISOTISSUEDKENCON INC12/03/2013
BISMHISSUEDKENCON INC12/03/2013
BISPLISSUEDPLUMB-IT MECHANICAL INC06/20/2012
BISMHISSUEDCHRISTINE SMITH ASSOCIATE06/07/2012
BISOTISSUEDVEMA CONTRACTING CORP03/21/2011
BISPLISSUEDDEMAR PLUMBING CORP03/16/2009
BISOTISSUEDNIKMAR PAINT & RENO INC02/03/2009
BISMHISSUEDNIKMAR PAINT & RENO INC02/03/2009
BISOTISSUEDNIKMAR PAINT & RENO INC02/03/2009
BISOTISSUEDBERNINI CONSTRUCTION CORP.10/06/2008
BISOTISSUEDTRADE-WINDS ENVIROMENTAL03/07/2008
BISPLISSUEDHENRY MYERS PLG & HTG09/20/2007
BISOTISSUEDJOHN LEONG CONSTRUCTION INC12/19/2006
+ 17 more permits on file
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/16/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/28/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/30/2025No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
07/16/2025Pass-Final Boiler Equipment InspectionPassView ↗
06/27/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/11/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
09/10/2025Energy Code Compliance InspectionsLOUIS ARENAprogress
09/10/2025Tenant Protection Plan ComplianceLOUIS ARENAspecial
04/23/2025Maintenance informationLOUIS ARENAenergy_progress
04/07/2025HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
04/07/2025HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
04/07/2025HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
04/02/2025Tenant Protection Plan ComplianceLOUIS ARENAspecial
04/01/2025Tenant Protection Plan ComplianceLOUIS ARENAspecial
04/01/2025Tenant Protection Plan ComplianceLOUIS ARENAspecial
03/21/2025HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
03/21/2025HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
03/21/2025FinalLOUIS ARENAprogress
03/21/2025Maintenance informationLOUIS ARENAenergy_progress
03/21/2025Chimneys and ventsLOUIS ARENAspecial
03/21/2025HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
03/20/2025Heating SystemsLOUIS ARENAspecial
12/26/2022Tenant Protection Plan ComplianceJAMES MOOREspecial
11/21/2022Structural Stability – Alterations of existing buildingsJAMES MOOREspecial
11/15/2022FinalJAMES MOOREprogress
11/17/2021Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
10/05/2021FinalJOHN MCMONAGLEprogress
10/05/2021Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
10/05/2021MasonryJOHN MCMONAGLEspecial
10/05/2021Concrete - Cast-In-PlaceJOHN MCMONAGLEspecial
10/05/2021Subgrade InspectionsJOHN MCMONAGLEspecial
Latest 25 of 33.
▾Documents — 358 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch15
09/03/2026M00504653-I1Request digital key ↗
09/03/2026M00485036-I1Request digital key ↗
09/03/2026M00541719-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/02/2026M00338047-P4Request digital key ↗
09/02/2026M00338047-I1Request digital key ↗
08/15/2026M00338047-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00343059-I1Request digital key ↗
▸Applications & Permits68
▸BISWORK PERMIT APPLICATION28
09/16/2021110418860Open ↗
09/13/2021110418860Open ↗
03/12/2021140972455Open ↗
Showing 3 of 28 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION23
08/16/2021110418860Open ↗
08/10/2021110418860Open ↗
11/05/2020140972455Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWLPC Approval/Permit15
09/03/2026M00485036-I1Open ↗
08/13/2026M01227480-I1Open ↗
08/13/2026M00338047-P4Open ↗
Showing 3 of 15 on file for this type
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
08/19/2020140927843Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
08/19/2020140927843Open ↗
▸Seals & Professional Certifications89
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION23
03/12/2020123829036Open ↗
03/12/2020123829036Open ↗
05/02/2017122888278Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
09/03/2026M00504653-I1Open ↗
09/03/2026M00485036-I1Open ↗
09/03/2026M00541719-P1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/30/2026M01198563-S1Open ↗
08/31/2026M01198563-I1Open ↗
08/30/2026M01198563-S3Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/30/2026M01198563-S1Open ↗
09/23/2026M01198563-S2Open ↗
08/31/2026M01198563-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
03/31/2017123052196Open ↗
10/07/2016122888278Open ↗
06/03/2016122749286Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
03/21/2011120635287Open ↗
Showing 1 of 3 on file for this type
▸BISProfessional and Owner Certification (POC3)3
10/07/2016122888278Open ↗
11/13/2013121823394Open ↗
11/13/2013121823394Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
11/05/2020140972455Open ↗
08/03/2020140927843Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
03/31/2017123052196Open ↗
06/03/2016122749286Open ↗
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/05/2020140972455Open ↗
▸Trade Schedules & Equipment17
▸BISSCHEDULE B - PLUMBING6
07/15/2014121823394Open ↗
11/13/2013121823394Open ↗
09/05/2012121101887Open ↗
Showing 3 of 6 on file for this type
▸BISSELF-CERT PLUMBING NOTICE5
09/11/2014121823394Open ↗
03/26/2014121823394Open ↗
11/19/2012121101887Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
07/26/2016122749286Open ↗
07/25/2016122749286Open ↗
06/03/2016122749286Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
02/18/2022110418860Open ↗
▸BISEQUIPMENT USE PERMITS1
02/18/2022110418860Open ↗
▸Safety & Tenant Protection12
▸BISTenant Protection Plan and Notes6
03/12/2020123829036Open ↗
03/31/2017123052196Open ↗
10/07/2016122888278Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWTenant Protection Plan6
08/13/2026M00338047-P4Open ↗
08/13/2026M00338047-P1Open ↗
08/13/2026M00338047-P2Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos32
▸DOB NOWDEP ACP-5: Asbestos Assessment Report18
09/03/2026M00485036-I1Open ↗
09/03/2026M00541719-I1Open ↗
09/03/2026M00541719-P1Open ↗
Showing 3 of 18 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
11/05/2020140972455Open ↗
08/03/2020140927843Open ↗
05/06/2020123829036Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
03/21/2011120635287Open ↗
06/07/2012121101887Open ↗
03/22/2011120635287Open ↗
Showing 3 of 5 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
11/13/2013121823394Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
09/03/2026M00504653-I1Open ↗
▸Energy Compliance23
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
03/12/2020123829036Open ↗
03/12/2020123829036Open ↗
05/02/2017122888278Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
12/06/2021140972455Open ↗
12/06/2021140927843Open ↗
05/02/2017122888278Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
12/06/2021140927843Open ↗
11/05/2020140972455Open ↗
08/19/2020140927843Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections3
11/13/2013121823394Open ↗
11/13/2013121823394Open ↗
06/07/2012121101887Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00504653-I1Open ↗
08/13/2026M00619046-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/05/2020140972455Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
08/19/2020140927843Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY10
02/22/2022110418860Open ↗
12/07/2021140972455Open ↗
12/07/2021140927843Open ↗
Showing 3 of 10 on file for this type
▸BISSOIL REPORT1
11/05/2020140972455Open ↗
▸Approvals, Objections & Sign-offs27
▸BISLANDMARKS APPROVAL10
11/05/2020140972455Open ↗
08/03/2020140927843Open ↗
03/12/2020123829036Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
02/23/2022110418860Open ↗
12/07/2021140972455Open ↗
12/07/2021140927843Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
06/07/2012121101887Open ↗
03/21/2011120635287Open ↗
Showing 2 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
01/21/2021140972455Open ↗
10/05/2020140927843Open ↗
12/06/2012121101887Open ↗
▸BISLANDMARKS SIGNOFF2
12/07/2021140972455Open ↗
12/07/2021140927843Open ↗
▸Cost, Insurance & Ownership25
▸BISCOST AFFIDAVIT21
12/06/2021140972455Open ↗
12/06/2021140927843Open ↗
11/05/2020140972455Open ↗
Showing 3 of 21 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT3
12/06/2013121823394Open ↗
03/22/2011120635287Open ↗
Showing 2 of 3 on file for this type
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
11/05/2020140972455Open ↗
▸Filing & Intake Forms28
▸BISEFILING COVER SHEET14
03/12/2020123829036Open ↗
03/12/2020123829036Open ↗
03/31/2017123052196Open ↗
Showing 3 of 14 on file for this type
▸BISBOROUGH INTAKE FORM8
09/16/2021110418860Open ↗
09/13/2021110418860Open ↗
03/12/2021140972455Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION4
12/07/2020140972455Open ↗
07/25/2016122749286Open ↗
07/15/2014121823394Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
11/05/2020140972455Open ↗
08/03/2020140927843Open ↗
▸Other Documents5
▸DOB NOWDHCR Document5
08/13/2026M00338047-P4Open ↗
08/13/2026M00504653-I1Open ↗
08/13/2026M00619046-S1Open ↗
Showing 3 of 5 on file for this type