← Back
BuildNYC
Over six families without stores
82 MILFORD STREET
BROOKLYN · BIN 3088470
💬 Discuss this project
2021Year Built
3Stories
C1Building Class
R5BZoning
6,720 sfGross Floor Area
7Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Over six families without stores · Owner of record: 82 Milford St · 5,000 sf lot · 1.34 FAR built · Flood zone X
Locations of Work
StructuralPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofResidential sprinkler installation1p · 1 filing · 3 docs
Floor 3Plumbing fixture installation16p · 3 filings · 15 docs
Floor 2Plumbing fixture installation15p · 3 filings · 15 docs
Floor 1Plumbing fixture installation16p · 4 filings · 19 docs
CellarPlumbing fixture installation16p · 4 filings · 19 docs
Site & exteriorHeavy duty sidewalk shed installation3p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Fazs Builder2107/08/2026
Fianzhin Builders703/21/2026
NYC Department of Housing Preservation and Development303/21/2026
82 Milford St103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/28/2022$2.3M—FIANZHIN BUILDERS INC. → 82 MILFORD ST LLC$342/sf building
07/30/2020$280K—524 NEW JERSEY AVE PLAZA CORP. → FIANZHIN BUILDERS INC— not available
03/11/2019$250K—82 MILFORD LLC → 524 NEW JERSEY AVE PLAZA CORP.— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Enthink Engineers107/17/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Design Studio Associates803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY Dynamic ConstructionGeneral Contractor607/08/2026
Zone Plumbing & HeatingPlumbing507/08/2026
A Russo WreckingGeneral Contractor203/21/2026
Metro Contracting NYScaffold203/21/2026
NY Dynamic ConstructionScaffold107/08/2026
Prime Piping & HeatingFire Protection107/08/2026
Paul LombardiElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616506/10/2022
Building Lifecycle
11/08/2024
§ 27-2142 ADM code apts have been vacated by this department and cannot be reoccupied until so ordered after proof of compliance for apts at apt…
HPD violation · closed
10/29/2024
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR…
HPD violation · closed
10/29/2024
§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF FIRE DAMAGE IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1st STORY, 1st APARTMENT…
HPD violation · closed
06/29/2022
Signed off — Alteration
SUBSEQUENT FILLING FOR structural WORK for NB JOB # 340764104
B00464591-I1
06/29/2022
Signed off — Alteration
INSTALLATION OF RESIDENTIAL PLUMBING FIXTURES AND RELATED PIPING AS PER PLANS FILED HEREWITH FILED IN CONJUNCTION WITH NB 340764104
B00426986-I1
71 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offZone Plumbing & Heating03/18/2022
DOB NOWStructuralSigned-offNY Dynamic Construction02/16/2022
DOB NOWCurb CutSigned-offNY Dynamic Construction02/16/2022
DOB NOWSprinklersSigned-offAmb Mechanical12/15/2021
DOB NOWSidewalk ShedSigned-offMetro Contracting NY07/19/2021
DOB NOWPlumbingSigned-offZone Plumbing & Heating06/28/2021
DOB NOWConstruction FenceSigned-offNY Dynamic Construction01/20/2021
BIS—ISSUEDNY Dynamic Construction07/28/2021
BIS—ISSUEDNY Dynamic Construction04/21/2021
BISEQISSUEDA Russo Wrecking01/29/2009
BIS—ISSUEDA Russo Wrecking01/29/2009
2 projects · most recent 07/17/2021
General Wiring Lighting
FiledStatusContractorScope
07/17/2021CompleteRichard Neu—
06/02/2021CompleteSafeway ConstructionGeneral Wiring, Lighting
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
06/10/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
05/06/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/03/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/14/2022Fail-Final Curb Cut Non-Directive 14FailView ↗
10/21/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/21/2021Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/21/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/02/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/02/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
06/09/2022Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesFAHAD FATEHspecial
06/09/2022Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/09/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
06/09/2022Soil Percolation Test - Individual On-Site Private Sewage Disposal SystemsFAHAD FATEHspecial
05/17/2022Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesFAHAD FATEHspecial
05/17/2022Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/17/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
05/17/2022Soil Percolation Test - Individual On-Site Private Sewage Disposal SystemsFAHAD FATEHspecial
07/16/2021FinalSunil Saigalprogress
02/03/2021MasonryFAHAD FATEHspecial
02/03/2021Structural Cold-Formed SteelFAHAD FATEHspecial
02/03/2021FinalFAHAD FATEHprogress
11/11/2020Sprinkler SystemsFAHAD FATEHspecial
11/11/2020Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
10/28/2020FinalFAHAD FATEHprogress
50 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account