Two family frame
821 CARLTON BOULEVARD
STATEN ISLAND · BIN 5174973
💬 Discuss this project
2022Year Built
2Stories
B2Building Class
R3AZoning
2,941 sfGross Floor Area
2Units
Two family frame · 5,661 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Roof1p · 1 filing · 6 docs
Floor 233p · 1 filing · 20 docs
Floor 127p · 1 filing · 20 docs
Basement28p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREEN RIVER ENVIRONMENTAL ENGINEERI103/30/2026
ROGERS CALVANICO GROUP PLLC701/10/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
D.C.F. CONTRACTING INCGeneral Contractor707/08/2026
ALISON PLBG & HTG INCPlumbing207/08/2026
NYSS LLCGeneral Contractor104/09/2026
JFR CONSTRUCTION CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREEN RIVER ENVIRONMENTAL7841103/30/2026
A TECH ENGINEERING NYC, P6738204/21/2022
Building Lifecycle
All (62)Filed (8)Permit Issued (8)Signed Off (3)Inspection (11)Objection (2)Special Inspection (30)
04/15/2026
Signed off — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS
S01380001-I1
04/02/2026
Permit issued — Solar
S01380001-I1-SL
03/30/2026
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS
S01380001-I1
03/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT MASONE
03/30/2026
Special inspection requirement — Energy Code Compliance Inspections
ROBERT MASONE
03/30/2026
Special inspection requirement — Final
ROBERT MASONE
03/30/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT MASONE
03/30/2026
Special inspection requirement — Air barrier - visual inspection
ROBERT MASONE
02/01/2023
Signed off — New Building
10' TOTAL CURB CUT
S00515396-S1
01/10/2023
Filed — New Building
10' TOTAL CURB CUT
S00515396-P4
12/29/2022
Signed off — New Building
10' TOTAL CURB CUT
S00515396-S2
12/28/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/28/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/18/2022
Permit issued — Curb Cut
S00515396-S2-CC
11/16/2022
Filed — New Building
10' TOTAL CURB CUT
S00515396-S2
07/01/2022
Permit issued — Plumbing
S00515396-S1-PL
06/27/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/09/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/09/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/01/2022
Filed — New Building
10' TOTAL CURB CUT
S00515396-P3
05/23/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
05/23/2022
Special inspection requirement — Subgrade Inspections
anthony santoro
05/23/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
05/23/2022
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
05/23/2022
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
05/23/2022
Special inspection requirement — Footing and Foundation
anthony santoro
05/23/2022
Special inspection requirement — Structural Wood Frame
anthony santoro
05/23/2022
Special inspection requirement — Fenestration air leakage
anthony santoro
05/23/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
05/23/2022
Special inspection requirement — Structural Steel - Details
anthony santoro
05/23/2022
Special inspection requirement — Maintenance information
anthony santoro
05/23/2022
Special inspection requirement — Air barrier — testing
anthony santoro
05/23/2022
Special inspection requirement — Final
anthony santoro
05/23/2022
Special inspection requirement — Protection of exposed foundation insulation
anthony santoro
05/23/2022
Special inspection requirement — Insulation placement and R values
anthony santoro
05/23/2022
Special inspection requirement — Metering
anthony santoro
05/23/2022
Special inspection requirement — Permanent certificate
anthony santoro
05/23/2022
Special inspection requirement — Air barrier - visual inspection
anthony santoro
05/23/2022
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
05/23/2022
Special inspection requirement — Duct leakage testing, insulation and design
anthony santoro
05/23/2022
Special inspection requirement — Interior lighting power
anthony santoro
05/23/2022
Special inspection requirement — Ventilation and air distribution system
anthony santoro
05/23/2022
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
05/23/2022
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
05/23/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
05/20/2022
Objection resolved — Addressed
05/05/2022
Objection raised — Scope
04/25/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/22/2022
Permit issued — General Construction
S00515396-I1-GC-CX
04/21/2022
Filed — New Building
10' TOTAL CURB CUT
S00515396-P1
04/21/2022
Filed — New Building
10' TOTAL CURB CUT
S00515396-P2
04/13/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/13/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/23/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/23/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/15/2021
Permit issued — Plumbing
S45452960-S1-PL
10/04/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/21/2021
Permit issued — Structural
S00515396-I1-GC-CX
09/21/2021
Permit issued — Plumbing
S00515396-S1-PL
08/30/2021
Permit issued — General Construction
S00515396-I1-GC-CX
Latest 60 of 62 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offNYSS LLC04/02/2026
DOB NOWCurb CutSigned-offD.C.F. CONTRACTING INC11/18/2022
DOB NOWPlumbingSigned-offALISON PLBG & HTG INC07/01/2022
DOB NOWGeneral ConstructionPermit IssuedD.C.F. CONTRACTING INC04/22/2022
DOB NOWPlumbingSigned-offJFR CONSTRUCTION CORP10/15/2021
DOB NOWStructuralPermit IssuedD.C.F. CONTRACTING INC09/21/2021
DOB NOWPlumbingSigned-offALISON PLBG & HTG INC09/21/2021
DOB NOWGeneral ConstructionPermit IssuedD.C.F. CONTRACTING INC08/30/2021
1 project · most recent 01/10/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
01/10/2023Signed-offALISON PLBG & HTG INCGas, Storm, Water/Sanitary
2 projects · most recent 03/30/2026
General Wiring
FiledStatusContractorScope
03/30/2026CompleteNY SOLAR ELECTRICAL LLC—
02/28/2022CompleteJ.V.C. ELEC SERVICE CORPGeneral Wiring
1 project · most recent 01/10/2023
Wood
FiledStatusContractorScope
01/10/2023Signed-offD.C.F. CONTRACTING INCWood
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
12/28/2022Pass-Final CND-Occupancy InspectionPassView ↗
12/28/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
06/27/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/09/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/09/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/25/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/13/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/13/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/23/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/04/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 67
DateRequirementInspectorRole
03/30/2026Structural Stability – Alterations of existing buildingsROBERT MASONEspecial
03/30/2026Fire-Resistant Penetrations and JointsROBERT MASONEspecial
03/30/2026Energy Code Compliance InspectionsROBERT MASONEprogress
03/30/2026FinalROBERT MASONEprogress
03/30/2026Air barrier - visual inspectionROBERT MASONEenergy_progress
05/23/2022Subgrade Inspectionsanthony santorospecial
05/23/2022Subsurface Investigations (Borings/Test Pits)anthony santorospecial
05/23/2022Wood – Prefabricated I-Joistsanthony santorospecial
05/23/2022Finalanthony santoroprogress
05/23/2022Energy Code Compliance Inspectionsanthony santoroprogress
05/23/2022Fire-Resistance Rated Constructionanthony santoroprogress
05/23/2022Footing and Foundationanthony santoroprogress
05/23/2022Structural Wood Frameanthony santoroprogress
05/23/2022Fenestration air leakageanthony santoroenergy_progress
05/23/2022Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
05/23/2022Fireplacesanthony santoroenergy_progress
05/23/2022Mechanical Systemsanthony santorospecial
05/23/2022Air barrier — testing anthony santoroenergy_progress
05/23/2022Maintenance informationanthony santoroenergy_progress
05/23/2022Protection of exposed foundation insulationanthony santoroenergy_progress
05/23/2022Insulation placement and R valuesanthony santoroenergy_progress
05/23/2022Meteringanthony santoroenergy_progress
05/23/2022Permanent certificateanthony santoroenergy_progress
05/23/2022Air barrier - visual inspectionanthony santoroenergy_progress
05/23/2022HVAC-R and service water heating system controlsanthony santoroenergy_progress
Latest 25 of 67.
▾Documents — 72 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/24/2026S00515396-P2Request digital key ↗
08/24/2026S00515396-S1Request digital key ↗
08/24/2026S00515396-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
05/11/2021540199836Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
08/23/2021540199836Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S00515396-P1Open ↗
08/13/2026S00515396-I1Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
08/23/2021540199836Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
05/11/2021540199836Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00515396-I1Open ↗
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature12
09/02/2026S00515396-P1Open ↗
09/02/2026S00515396-P1Open ↗
09/02/2026S00515396-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/24/2026S00515396-P2Open ↗
08/24/2026S00515396-P1Open ↗
08/24/2026S00515396-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026S00515396-P1Open ↗
09/02/2026S00515396-P1Open ↗
09/02/2026S00515396-P1Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/11/2021540199836Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/11/2021540199836Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026S00515396-P1Open ↗
08/13/2026S00515396-I1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026S00515396-I1—
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/13/2026S00515396-P1Open ↗
08/13/2026S00515396-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00515396-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00515396-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00515396-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00515396-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT2
08/13/2026S00515396-I1Open ↗
08/13/2026S00515396-P1Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
05/11/2021540199836Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
05/11/2021540199836Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00515396-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00515396-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
08/23/2021540199836Open ↗
08/23/2021540199836Open ↗
▸BISNYS DEC FRESHWATER WETLANDS APPROVAL1
08/23/2021540199836Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01380001-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
05/11/2021540199836Open ↗
▸Other Documents8
▸BISBPP - SUPPORTING DOCUMENTATION2
08/23/2021540199836Open ↗
05/11/2021540199836Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S00515396-I1Open ↗
08/13/2026S00515396-P1Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
08/23/2021540199836Open ↗
▸BISNYS DEC FRESHWATER WETLANDS MAP1
05/11/2021540199836Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
08/23/2021540199836Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00515396-I1Open ↗