← Back
Primarily 2 family with 1 store or office
8218 5 AVENUE
BROOKLYN · Bay Ridge · BIN 3152125
💬 Discuss this project
1921Year Built
3Stories
S2Building Class
R6BZoning
4,176 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · 1,612 sf lot · 2.59 FAR built · Flood zone X
Locations of Work
Architecture
Cellar1p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EUNJOO1007/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHON ENGINEERING307/25/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AVON PLBG & HTG INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHON ENGINEERING PC2454307/25/2022
Building Lifecycle
All (19)Filed (3)Permit Issued (2)Signed Off (2)Violation (4)Inspection (5)Special Inspection (3)
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/06/2022
Signed off — Alteration
install two hot water heater and two residential boilers
B00740230-I1
09/01/2022
Signed off — Alteration
install two residential boilers in existing boiler room for apartment on second and third floor
B00740135-I1
09/01/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/31/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/29/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/16/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/26/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steve Chon
07/25/2022
Filed — Alteration
install two residential boilers in existing boiler room for apartment on second and third floor
B00740135-P1
07/25/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/27/2022
Permit issued — Boiler Equipment
B00740135-I1-BE
06/27/2022
Permit issued — Plumbing
B00740230-I1-PL
05/31/2022
Filed — Alteration
install two residential boilers in existing boiler room for apartment on second and third floor
B00740135-I1
05/24/2022
Filed — Alteration
install two hot water heater and two residential boilers
B00740230-I1
05/17/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steve Chon
05/17/2022
Special inspection requirement — Energy Code Compliance Inspections
Steve Chon
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/17/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offAVON PLBG & HTG INC06/27/2022
DOB NOWPlumbingSigned-offAVON PLBG & HTG INC06/27/2022
BISPLISSUEDPLUMBING & HTG DOCTOR INC08/12/1996
BISMHISSUEDLUIS FERMIN06/25/1996
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/01/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/31/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/29/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/16/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/25/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
07/26/2022Fire-Resistant Penetrations and JointsSteve Chonspecial
05/17/2022Fire-Resistant Penetrations and JointsSteve Chonspecial
05/17/2022Energy Code Compliance InspectionsSteve Chonprogress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/29/2026B00740230-I1Request digital key ↗
08/29/2026B00740135-I1Request digital key ↗
08/29/2026B00740135-P1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/29/2026B00740230-I1Open ↗
08/29/2026B00740135-P1Open ↗
08/29/2026B00740135-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B00740230-I1Open ↗
08/23/2026B00740135-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026B00740230-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/29/2026B00740230-I1Open ↗
08/29/2026B00740135-I1Open ↗
08/29/2026B00740135-P1Open ↗