← Back
Church, synagogue, chapel
824 WEST END AVENUE
MANHATTAN · BIN 1056474
💬 Discuss this project
1928Year Built
6Stories
M1Building Class
R8Zoning
28,454 sfGross Floor Area
41Units
LL97 Covered0 Open ViolationsFISP: SAFE
Church, synagogue, chapel · Owner of record: CONGREGATION ANSCHE CHESED · 13,013 sf lot · 2.19 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Floor 61p · 1 filing · 6 docs
Floor 51p · 1 filing · 3 docs
Floor 4
Floor 3
Floor 21p · 1 filing · 5 docs
Floor 1
Cellar8p · 3 filings · 20 docs
Basement4p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CONGREGATION ANSCHE CHESED3107/08/2026
OWNERS REP407/08/2026
INTERSYSTEMS303/21/2026
251 WEST 100 STREET203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ENGINEERING SOLUTIONS201/08/2025
STUDIO ST ARCHITECTS508/21/2024
GOLDMAN COPELAND ASSOCIATES904/03/2023
PAUL PERDEK, PROF. ENG. PLLC206/10/2021
SILMAN108/13/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J. CALLAHAN CONSULTING, INC.1503/21/2026
CONVERSANO ASSOCIATES, INC.403/21/2026
AE DESIGN SOLUTION403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.W. & S. CONSTRUCTION COGeneral Contractor607/08/2026
WILLIAM C. GERAKARIS P&HPlumbing207/08/2026
AGGRESSIVE FIRE PROT LLCFire Protection207/08/2026
ZITO, ROCCOElectrical103/21/2026
LEONARD KRITZElectrical103/21/2026
SYED-NAQVI ALTAFElectrical103/21/2026
CLOVER AIR DESIGN LLCGeneral Contractor107/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor107/08/2026
SYED-NAQVI, ALTAFElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENGINEERING SOLUTIONS, PL6492201/08/2025
GOLDMAN COPELAND ASSOCIAT2826209/22/2020
CHEN ENGINEERING SERVICES1826108/13/2020
Building Lifecycle
All (127)Filed (19)Permit Issued (12)Signed Off (7)Facade (FISP) (13)Violation (22)Inspection (3)Objection (40)Special Inspection (11)
02/14/2025
Signed off — Alteration
Filing herewith for the replacement of existing HVAC serving cellar existing low rise commercial building place of religious worship)
M01014311-I1
01/08/2025
Filed — Alteration
Filing herewith for the replacement of existing HVAC serving cellar existing low rise commercial building place of religious worship)
M01014311-P1
11/07/2024
Permit issued — Mechanical Systems
M01014311-I1-MS
08/29/2024
Special inspection requirement — Public Assembly Emergency Lighting
Esther Sperber
08/21/2024
Filed — No Work
M00930648-P4
08/21/2024
Special inspection requirement — Public Assembly Emergency Lighting
Esther Sperber
03/26/2024
Filed — Alteration
Filing herewith for the replacement of existing HVAC serving cellar existing low rise commercial building place of religious worship)
M01014311-I1
02/07/2024
Cycle 9 facade report submitted
02/07/2024
Cycle 9 facade report signed — SAFE
01/16/2024
Cycle 9 facade inspection completed
10/11/2023
Objection resolved — Addressed
10/10/2023
Objection raised — Admin
10/03/2023
Objection resolved — Addressed
10/03/2023
Objection resolved — Addressed
09/19/2023
Objection raised — Admin
09/19/2023
Objection raised — Structural
09/13/2023
Filed — No Work
M00930648-I1
06/07/2023
Signed off — Alteration
In conjunction with renovation of existing church. mechanical work only.
M00374952-I1
05/09/2023
Signed off — Alteration
In conjunction with Renovation of existing church. plumbing work to be done in the cellar, ground floor (1st Floor) and 4th and 5th Floor only.
M00375120-I1
05/09/2023
Signed off — Alteration
modification of existing sprinklers system, from the basement to the 6th floor.
M00375126-I1
04/03/2023
Filed — Alteration
In conjunction with Renovation of existing church. plumbing work to be done in the cellar, ground floor (1st Floor) and 4th and 5th Floor only.
M00375120-P6
02/21/2023
Filed — Alteration
In conjunction with Renovation of existing church. plumbing work to be done in the cellar, ground floor (1st Floor) and 4th and 5th Floor only.
M00375120-P5
11/22/2022
Signed off — Alteration
in conjunction with renovation of existing synagogue Structural work for 1st floor renovation and structural work for new A.D.A elevator that being installed on the 1st to the second floor. No change of use, occupancy or egress
M00375006-I1
11/16/2022
Permit issued — Sprinklers
M00375126-I1-EW-SP
11/09/2022
Signed off — Alteration
(Phase 1) interior demo and minor temporary construction of existing synagogue/ and office area . work in the cellar and ground floor level only.
M00466226-I1
09/30/2022
Permit issued — Plumbing
M00375120-I1-PL
09/02/2022
Objection resolved — Addressed
08/18/2022
Objection raised — Scope
08/10/2022
Filed — Alteration
In conjunction with Renovation of existing church. plumbing work to be done in the cellar, ground floor (1st Floor) and 4th and 5th Floor only.
M00375120-P4
08/10/2022
Filed — No Work
M00766612-I1
06/21/2022
Permit issued — Structural
M00375006-I1-ST
06/21/2022
Permit issued — Mechanical Systems
M00374952-I1-MS
06/15/2022
Permit issued — General Construction
M00466226-I1-GC
06/01/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/12/2021
Filed — Alteration
In conjunction with Renovation of existing church. plumbing work to be done in the cellar, ground floor (1st Floor) and 4th and 5th Floor only.
M00375120-P3
10/06/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/29/2021
Filed — Alteration
In conjunction with Renovation of existing church. plumbing work to be done in the cellar, ground floor (1st Floor) and 4th and 5th Floor only.
M00375120-P2
09/17/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/27/2021
Violation issued (ECB, closed)
Plumbing
08/09/2021
Filed — Alteration
In conjunction with Renovation of existing church. plumbing work to be done in the cellar, ground floor (1st Floor) and 4th and 5th Floor only.
M00375120-P1
07/30/2021
Signed off — Alteration
M00512657-I1
07/29/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/17/2021
Permit issued — Structural
M00375006-I1-ST
06/15/2021
Permit issued — Mechanical Systems
M00374952-I1-MS
06/10/2021
Filed — Alteration
M00512657-P1
05/25/2021
Permit issued — Sprinklers
M00375126-I1-EW-SP
05/11/2021
Permit issued — Plumbing
M00375120-I1-PL
05/04/2021
Permit issued — Supported Scaffold
M00512657-I1-SF
05/03/2021
Filed — Alteration
M00512657-I1
02/19/2021
Permit issued — General Construction
M00466226-I1-GC
02/16/2021
Special inspection requirement — Final
Esther Sperber
02/12/2021
Filed — Alteration
(Phase 1) interior demo and minor temporary construction of existing synagogue/ and office area . work in the cellar and ground floor level only.
M00466226-P1
02/12/2021
Special inspection requirement — Final
02/10/2021
Filed — Alteration
(Phase 1) interior demo and minor temporary construction of existing synagogue/ and office area . work in the cellar and ground floor level only.
M00466226-I1
10/27/2020
Objection raised — Other
10/27/2020
Objection resolved — Addressed
10/27/2020
Objection raised — Other
10/27/2020
Objection resolved — Addressed
10/23/2020
Objection raised — Other
10/23/2020
Objection resolved — Addressed
Latest 60 of 127 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offCLOVER AIR DESIGN LLC11/07/2024
DOB NOWSprinklersSigned-offAGGRESSIVE FIRE PROT LLC11/16/2022
DOB NOWPlumbingSigned-offWILLIAM C. GERAKARIS P&H09/30/2022
DOB NOWStructuralSigned-offA.W. & S. CONSTRUCTION CO06/21/2022
DOB NOWMechanical SystemsSigned-offA.W. & S. CONSTRUCTION CO06/21/2022
DOB NOWGeneral ConstructionSigned-offA.W. & S. CONSTRUCTION CO06/15/2022
DOB NOWStructuralSigned-offA.W. & S. CONSTRUCTION CO06/17/2021
DOB NOWMechanical SystemsSigned-offA.W. & S. CONSTRUCTION CO06/15/2021
DOB NOWSprinklersSigned-offAGGRESSIVE FIRE PROT LLC05/25/2021
DOB NOWPlumbingSigned-offWILLIAM C. GERAKARIS P&H05/11/2021
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC05/04/2021
DOB NOWGeneral ConstructionSigned-offA.W. & S. CONSTRUCTION CO02/19/2021
BIS—ISSUEDA.W. & S CONSTRCUTION CO INC03/23/2022
BISOTISSUEDA.W. & S. CONSTRUCTION CO04/22/2021
BISMHISSUEDCLOVER MECHANICAL INC09/15/2018
BISPLISSUEDBEDROCK PLBG. & HTG., INC07/29/2016
BISOTISSUEDQUEST BUILDERS GROUP INC07/28/2016
BISOTISSUEDAMSTERDAM RESTORATION COR03/25/2011
BISOTISSUEDAMSTERDAM RESTORATION COR03/25/2011
BISOTISSUEDAMSTERDAM RESTORATION COR11/05/2010
BISEQISSUEDAMSTERDAM RESTORATION COR10/12/2010
BISEQISSUEDINTERSYSTEMS CORP.08/05/2008
BISOTISSUEDAMSTERDAM RESTORATION GROUP.04/08/2008
BISOTISSUEDAMSTERDAM RESTORATION GROUP.01/03/2008
BISOTISSUEDNEW AMSTERDAM RESTORATION GROUP.12/20/2007
BISOTISSUEDNEW AMSTERDAM RESTORATION GROUP.07/16/2007
BISEQISSUEDROCKLEDGE SCAFFOLD CORP03/13/2007
BISMHISSUEDCLOVER MECHANICAL INC10/19/2005
BISFPISSUEDFIRE COMMAND CO.,INC06/01/2005
BISEQISSUEDWEST NEW YORK RESTORATION OF CT06/13/2003
BISEQISSUEDWEST NEW YORK RESTORATION OF CT06/13/2003
BISEQISSUEDWEST NEW YORK RESTORATION OF CT01/21/2003
BISEQISSUEDWEST NEW YORK RESTORATION OF CT10/02/2002
BISEQISSUEDWEST NEW YORK RESTORATION OF CT08/16/2002
BIS—ISSUEDTRIESTE CONSTRUCTION CORP07/08/1998
BISEQISSUEDSPRING INTERPRISES INC.07/16/1996
BISMHISSUEDWONDER WORKS CONSTRUCTION CORP06/15/1994
BISFSISSUEDCONTROLLED COMBUSTION09/09/1992
BISFPISSUEDFIRE COMMAND CO. INC07/23/1992
BISFPISSUEDCITY FIRE CONTROL ,INC.05/15/1991
2 projects · most recent 02/15/2022
General Wiring
FiledStatusContractorScope
02/15/2022CompleteRESPONSE ELECTRIC INC.General Wiring
05/06/2021CompleteLIPPOLIS ELECTRIC, INC.General Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/06/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/17/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/29/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
08/29/2024Public Assembly Emergency LightingEsther Sperberprogress
08/21/2024Public Assembly Emergency LightingEsther Sperberprogress
02/16/2021FinalEsther Sperberprogress
02/12/2021Final—progress
10/16/2020Fire-Resistant Penetrations and JointsDANIEL COLOMBINIspecial
09/21/2020HVAC and service water heating system controls DANIEL COLOMBINIenergy_progress
09/21/2020HVAC and service water heating equipment DANIEL COLOMBINIenergy_progress
07/30/2020Fire-Resistant Penetrations and JointsDANIEL COLOMBINIspecial
07/23/2020Sprinkler SystemsDANIEL COLOMBINIspecial
07/23/2020FinalDANIEL COLOMBINIprogress
07/23/2020Mechanical SystemsDANIEL COLOMBINIspecial
▾Documents — 288 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch - Plumbing7
09/03/2026M00375120-I1Request digital key ↗
09/03/2026M00375120-P5Request digital key ↗
08/15/2026M00375120-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch4
09/03/2026M00512657-I1Request digital key ↗
09/03/2026M00512657-P1Request digital key ↗
08/27/2026M01014311-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly3
09/02/2026M00766612-I1Request digital key ↗
08/26/2026M00930648-P4Request digital key ↗
08/15/2026M00930648-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction2
09/04/2026M00466226-P1Request digital key ↗
09/04/2026M00466226-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
08/14/2026M00375126-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/14/2026M00374952-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/15/2026M00375006-I1Request digital key ↗
▸Applications & Permits68
▸BISPLAN / WORK APPROVAL APPLICATION40
05/22/2025123908352Open ↗
04/28/2025123908352Open ↗
07/25/2024101323097Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWLPC Approval/Permit13
09/04/2026M00466226-P1Open ↗
09/04/2026M00466226-I1Open ↗
09/03/2026M00375120-I1Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION12
03/23/2022123908352Open ↗
03/17/2022123908352Open ↗
05/26/2021140938555Open ↗
Showing 3 of 12 on file for this type
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
04/20/2021123829063Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
03/30/2022123908352Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
04/15/2024100472935Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
03/06/2024123908352Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/12/2024123908352Open ↗
▸Seals & Professional Certifications50
▸DOB NOWDPL-1: Design Professional Seal & Signature19
09/04/2026M00374952-I1Open ↗
09/04/2026M00466226-P1Open ↗
09/04/2026M00466226-I1Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
03/18/2020123829063Open ↗
12/16/2016122719200Open ↗
07/29/2016122719200Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026M00466226-I1Open ↗
08/31/2026M00930648-P4Open ↗
08/31/2026M00930648-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/25/2026M00375126-I1Open ↗
08/25/2026M00375126-I1Open ↗
08/22/2026M00374952-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
10/21/2010120494429Open ↗
08/05/2008110091061Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/20/2020140938555Open ↗
09/10/2018140801194Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
10/21/2010120494429Open ↗
08/05/2008110091061Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/10/2018140801194Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/10/2018140801194Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
08/20/2020140938555Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
05/04/2016122719200Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
06/17/2021123908352Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
05/08/2020123829063Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/04/2026M00466226-P1Open ↗
09/04/2026M00466226-I1Open ↗
08/27/2026M01014311-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/14/2026M00374952-I1Open ↗
08/13/2026M00375126-I1Open ↗
08/13/2026M00375120-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
10/21/2010120494429Open ↗
08/05/2008110091061Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
09/10/2018140801194Open ↗
05/04/2016122719200Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/22/2010120501386Open ↗
▸BISASBESTOS: VARIANCE (DEP FORM V5)1
04/20/2021123829063Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
05/12/2021140938555Open ↗
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU0489MN211
03/08/2023123829063Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
03/18/2020123829063Open ↗
12/16/2016122719200Open ↗
07/29/2016122719200Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
04/22/2021123829063Open ↗
04/20/2021123829063Open ↗
09/10/2018140801194Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
08/20/2020140938555Open ↗
09/10/2018140801194Open ↗
▸BISNYCECC EXEMPTION1
07/23/2021123908352Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/08/2022140938555Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/16/2016122719200Open ↗
▸Inspections & Test Reports28
▸BISTECHNICAL REPORT: RESPONSIBILITY20
05/22/2023110091061Open ↗
05/22/2023110091061Open ↗
05/10/2023110091061Open ↗
Showing 3 of 20 on file for this type
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS2
01/20/2023123829063Open ↗
11/08/2022140938555Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
11/08/2022140938555Open ↗
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY1
11/08/2022140938555Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
05/26/2021140938555Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
11/08/2022140938555Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/06/2023123829063Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
02/08/2023123829063Open ↗
▸Approvals, Objections & Sign-offs54
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter19
09/04/2026M00466226-P1Open ↗
09/04/2026M00466226-I1Open ↗
09/03/2026M00512657-I1Open ↗
Showing 3 of 19 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE10
05/22/2025123908352Open ↗
04/28/2025123908352Open ↗
07/17/2024123908352Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
06/28/2024104110640Open ↗
11/28/2023120494429Open ↗
05/25/2023110091061Open ↗
Showing 3 of 9 on file for this type
▸BISLANDMARKS APPROVAL5
07/23/2021123908352Open ↗
08/20/2020140938555Open ↗
06/29/2020123829063Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
07/23/2021123908352Open ↗
05/08/2020123829063Open ↗
10/21/2010120494429Open ↗
Showing 3 of 4 on file for this type
▸BISFINAL3
05/10/2023110091061Open ↗
01/20/2023123829063Open ↗
11/08/2022140938555Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
10/28/2020140938555Open ↗
06/29/2020123829063Open ↗
▸BISLANDMARKS SIGNOFF2
03/08/2024123908352Open ↗
01/23/2023123829063Open ↗
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT12
08/25/2025123908352Open ↗
06/27/2024104110640Open ↗
06/27/2024104110640Open ↗
Showing 3 of 12 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
08/25/2025123908352Open ↗
01/20/2023123829063Open ↗
11/08/2022140938555Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
06/09/2021123908352Open ↗
▸Filing & Intake Forms13
▸BISEFILING COVER SHEET7
06/09/2021123908352Open ↗
03/18/2020123829063Open ↗
05/04/2016122719200Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION3
07/30/2024123908352Open ↗
08/16/2023123908352Open ↗
04/19/2021123829063Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
08/19/2020140938555Open ↗
09/10/2018140801194Open ↗
▸BISBOROUGH INTAKE FORM1
06/09/2021123908352Open ↗
▸Other Documents7
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
03/18/2020123829063Open ↗
05/04/2016122719200Open ↗
▸DOB NOWAlternate Plan 12
08/26/2026M00930648-P4Open ↗
08/15/2026M00930648-I1Open ↗
▸DOB NOWAlternate Plan 22
08/26/2026M00930648-P4Open ↗
08/15/2026M00930648-I1Open ↗
▸BISPLOT DIAGRAM1
07/23/2021123908352Open ↗