← Back
BuildNYC
Elevator cooperative
825 5TH AVENUE
MANHATTAN · BIN 1041056
💬 Discuss this project
1926Year Built
23Stories
D4Building Class
R10Zoning
130,923 sfGross Floor Area
102Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SWARMP
Elevator cooperative · Owner of record: 825 Fifth Ave · 8,450 sf lot · 15.49 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofDouglas Elliman Property Management8p · 5 filings · 20 docs
Floor 22Ceiling and floor slab repair29p · 4 filings · 20 docs
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17Unit 17C, Unit 17DUnder Construction7p · 5 filings · 20 docs
Floor 16
Floor 15
Floor 14Unit 14B, Unit 14C, Unit 14D +1Under Construction63p · 3 filings · 20 docs
Floor 13Unit 13B19p · 3 filings · 18 docs
Floor 12
Floor 11Mechanical work in residential apartmentUnder Construction18p · 3 filings · 20 docs
Floor 10Unit 10C12p · 3 filings · 19 docs
Floor 9Unit 9BC6p · 2 filings · 9 docs
Floor 8Unit 8C, Unit 8EUnder Construction24p · 3 filings · 20 docs
Floor 7Unit 7AB6p · 2 filings · 13 docs
Floor 6Unit 6C, Unit 6AB4p · 4 filings · 20 docs
Floor 51p · 1 filing · 15 docs
Floor 4Unit 4A, Unit 4B7p · 4 filings · 20 docs
Floor 3
Floor 2Unit 2BUnder Construction3p · 2 filings · 17 docs
Floor 1Douglas Elliman Property Management5p · 2 filings · 10 docs
CellarDouglas Elliman Property Management26p · 5 filings · 20 docs
Site & exteriorDouglas Elliman Property Management7p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
825 Fifth Avenue9603/22/2026
825 5th Ave2503/21/2026
The Dakota1607/08/2026
825 5th Owners703/21/2026
Brown, Harris, Stevens603/21/2026
150 E 55 St Condo503/21/2026
825 5th Avenue Commissary Kitche103/21/2026
825 5th Ave Corp Brown Harris St103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J.A.M. Associates1803/21/2026
J Callahan Consulting3203/21/2026
Milrose Consultants1403/21/2026
AE Design Solution203/21/2026
Azar Associates203/21/2026
Municipal Building Consultants203/21/2026
Maryclare Nepogoda503/21/2026
Agouti Construction Consulting803/21/2026
DI Dio Architecture203/21/2026
Rigid Structural Design203/21/2026
A K Expediting1003/21/2026
Vincent J. Liotta P.E103/21/2026
Vincent J. Liotta P. E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Highline Construction GRGeneral Contractor1309/29/2026
GDC ContractingGeneral Contractor907/08/2026
N-Marseni ContractingGeneral Contractor807/08/2026
Maxco ContractingGeneral Contractor707/08/2026
Donato PlumbingPlumbing607/08/2026
D.H.E. CompanyGeneral Contractor507/08/2026
Nordic Custom BuildersGeneral Contractor507/08/2026
S. DonadicGeneral Contractor407/04/2026
Forte Express P & HPlumbing407/08/2026
Metrotech MechanicalPlumbing307/08/2026
LTB Mechanicalspecialty_contractor307/08/2026
Ceprine ConstructionScaffold303/21/2026
BK Plumbing & Heating CoPlumbing307/08/2026
Zale ContractingGeneral Contractor307/08/2026
Walter J.grande P & HPlumbing207/08/2026
DN ElectricElectrical203/21/2026
Hanjo ContractorsGeneral Contractor204/09/2026
V. Disalvo Contracting CoGeneral Contractor203/21/2026
Aranda Plumbing & HeatingPlumbing207/08/2026
Hydrokinetic Plumbing & Heating IPlumbing208/04/2026
Polyphase ElectricElectrical203/21/2026
Modern Voltage NYCElectrical103/22/2026
Melville Heating & Air CondGeneral Contractor107/08/2026
MLS ElectricElectrical103/22/2026
WCK ElectricElectrical103/21/2026
Lidmar Electric ServicesElectrical103/21/2026
Millennium Maintenance & ElectricalElectrical103/21/2026
Decora Electric CoElectrical103/21/2026
Midland Electrical CoElectrical103/21/2026
All Pro Plumbing & HeatingFire Protection107/08/2026
NY City PlumberPlumbing107/08/2026
Arcon Plumbing SolutionsPlumbing107/08/2026
Big Shot ElectricElectrical103/21/2026
Einstein ElectricalElectrical103/22/2026
Dynamic Blue Water MechanicalPlumbing107/08/2026
DN ElectricElectrical103/22/2026
FDL Contracting GroupGeneral Contractor107/08/2026
Dumas ConstructionGeneral Contractor107/08/2026
P.S.I. MechanicalPlumbing107/08/2026
Compact HVACspecialty_contractor107/08/2026
Defalco Associates, LLC/Electrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Michael Patino Architectu8170506/26/2026
Milrose Consultants2003107/09/2025
Integrity Consulting Service666206/10/2025
MEP Inspections11021105/15/2025
Metric Consulting and Ins1803103/25/2025
Chang Park Arch663409/18/2024
Jack Green Associates422904/30/2024
Piro Studio7503112/19/2022
John B. Murray Architect3355208/02/2022
Skyline Engineering267306/10/2021
Christian L. Martos Engineering5965107/16/2020
Vincent J. Liotta P. E1974112/03/2019
Building Lifecycle
All (300)Filed (66)Permit Issued (78)Signed Off (22)Facade (FISP) (8)Violation (31)Inspection (35)Objection (30)Special Inspection (30)
09/29/2026
Signed off — Alteration
M01195510-I1
09/28/2026
Permit issued — General Construction
M01086224-I1-GC
08/28/2026
Signed off — Alteration
Installation of (3) PTAC units for an existing apartment. No change to use, occupancy or egress.
M01195451-I1
08/19/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/13/2026
Signed off — Alteration
Plumbing work proposed for an existing apartment. No change to use, occupancy or egress.
M01195480-I1
08/03/2026
Permit issued — Plumbing
M01365438-S1-PL
07/24/2026
Signed off — Alteration
New plumbing piping installation, new water piping insulation, and new plumbing fixtures installed as per plans filed
M01243091-I1
07/01/2026
Special inspection requirement — Final
Albert Betesh
07/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Patino
06/26/2026
Filed — Alteration
Plumbing work file in conjunction with apartment # 8E renovation.
M01395915-P1
06/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Patino
06/16/2026
Special inspection requirement — Final
Albert Betesh
06/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Patino
06/10/2026
Special inspection requirement — Final
Albert Betesh
06/05/2026
Permit issued — General Construction
M01395915-I1-GC
06/05/2026
Permit issued — Plumbing
M01395915-S1-PL
06/01/2026
Filed — Alteration
Renovation of an existing apartment#14BC on the 14th floor. Work include non-structural demolition and general construction as per plan file herewith. No change to use, egress or occupancy.
M01365438-P1
05/28/2026
Permit issued — Mechanical Systems
M01365438-S2-MS
05/27/2026
Permit issued — Mechanical Systems
M01018796-I1-MS
05/27/2026
Permit issued — General Construction
M01365438-I1-GC
05/27/2026
Special inspection requirement — Final
Albert Betesh
05/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Patino
05/19/2026
Objection resolved — Addressed
05/19/2026
Objection resolved — Addressed
05/18/2026
Objection raised — Scope
05/18/2026
Objection raised — Scope
05/15/2026
Filed — Alteration
Plumbing work file in conjunction with apartment # 8E renovation.
M01395915-I1
05/15/2026
Filed — Alteration
Plumbing work file in conjunction with apartment # 8E renovation.
M01395915-S1
04/15/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/24/2026
Filed — Alteration
Renovation of an existing apartment#14BC on the 14th floor. Work include non-structural demolition and general construction as per plan file herewith. No change to use, egress or occupancy.
M01365438-S2
03/24/2026
Filed — Alteration
Renovation of an existing apartment#14BC on the 14th floor. Work include non-structural demolition and general construction as per plan file herewith. No change to use, egress or occupancy.
M01365438-I1
03/24/2026
Filed — Alteration
Renovation of an existing apartment#14BC on the 14th floor. Work include non-structural demolition and general construction as per plan file herewith. No change to use, egress or occupancy.
M01365438-S1
03/10/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/27/2026
Special inspection requirement — Mechanical Systems
Michael Patino
02/27/2026
Special inspection requirement — Final
Michael Patino
02/12/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/15/2026
Filed — Alteration
New plumbing piping installation, new water piping insulation, and new plumbing fixtures installed as per plans filed
M01243091-P1
01/14/2026
Permit issued — General Construction
M01018777-I1-GC
12/10/2025
Permit issued — Plumbing
M01081679-I1-PL
12/03/2025
Permit issued — General Construction
M01228295-I1-GC
09/30/2025
Permit issued — General Construction
M01086224-I1-GC
09/02/2025
Permit issued — General Construction
M01243091-I1-GC
08/25/2025
Signed off — Alteration
Herewith file plumbing plans for Apt. 6C. GC filed under M00907668
M00907672-I1
08/25/2025
Signed off — Alteration
INTERIOR RENOVATION TO EXISTING APARTMENT. GENERAL CONSTRUCTIONTO INCLUDE MINOR PARTITION LAYOUT CHANGES AND NEW FINISHES.PLUMBING TO BE FILED UNDER SEPARATE APPLICATION.
M00907668-I1
08/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/18/2025
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01230905-I1
08/08/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/05/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/01/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/31/2025
Permit issued — Plumbing
M01243091-S1-PL
07/31/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/15/2025
Permit issued — General Construction
M01243091-I1-GC
07/09/2025
Filed — Alteration
New plumbing piping installation, new water piping insulation, and new plumbing fixtures installed as per plans filed
M01243091-I1
07/09/2025
Filed — Alteration
New plumbing piping installation, new water piping insulation, and new plumbing fixtures installed as per plans filed
M01243091-S1
07/08/2025
Permit issued — Plumbing
M01228295-S1-PL
07/08/2025
Permit issued — General Construction
M01228295-I1-GC
07/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
07/02/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/01/2025
Permit issued — General Construction
M01195510-I1-GC
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedHighline Construction GR09/28/2026
DOB NOWPlumbingPermit IssuedHydrokinetic Plumbing & Heating I08/03/2026
DOB NOWGeneral ConstructionPermit IssuedZale Contracting06/05/2026
DOB NOWPlumbingPermit IssuedHydrokinetic Plumbing & Heating I06/05/2026
DOB NOWMechanical SystemsPermit IssuedZale Contracting05/28/2026
DOB NOWMechanical SystemsPermit IssuedHighline Construction GR05/27/2026
DOB NOWGeneral ConstructionPermit IssuedZale Contracting05/27/2026
DOB NOWGeneral ConstructionPermit IssuedHighline Construction GR01/14/2026
DOB NOWPlumbingSigned-offMetrotech Mechanical12/10/2025
DOB NOWGeneral ConstructionPermit IssuedHanjo Contractors12/03/2025
DOB NOWGeneral ConstructionPermit IssuedHighline Construction GR09/30/2025
DOB NOWGeneral ConstructionSigned-offNordic Custom Builders09/02/2025
DOB NOWPlumbingSigned-offDonato Plumbing07/31/2025
DOB NOWGeneral ConstructionSigned-offNordic Custom Builders07/15/2025
DOB NOWPlumbingSigned-offArcon Plumbing Solutions07/08/2025
DOB NOWGeneral ConstructionPermit IssuedHanjo Contractors07/08/2025
DOB NOWGeneral ConstructionSigned-offSapol Construction07/01/2025
DOB NOWMechanical SystemsSigned-offSapol Construction07/01/2025
DOB NOWGeneral ConstructionPermit IssuedNordic Custom Builders06/18/2025
DOB NOWSidewalk ShedSigned-offCeprine Construction06/16/2025
DOB NOWGeneral ConstructionSigned-offSapol Construction06/03/2025
DOB NOWPlumbingSigned-offForte Express P & H05/28/2025
DOB NOWMechanical SystemsPermit IssuedHighline Construction GR05/27/2025
DOB NOWPlumbingSigned-offDonato Plumbing05/22/2025
DOB NOWMechanical SystemsSigned-offSapol Construction05/22/2025
DOB NOWGeneral ConstructionPermit IssuedHighline Construction GR02/03/2025
DOB NOWGeneral ConstructionPermit IssuedGDC Contracting12/10/2024
DOB NOWPlumbingSigned-offMetrotech Mechanical11/04/2024
DOB NOWGeneral ConstructionSigned-offD.H.E. Company10/29/2024
DOB NOWGeneral ConstructionPermit IssuedHighline Construction GR10/04/2024
DOB NOWPlumbingSigned-offDonato Plumbing09/06/2024
DOB NOWPlumbingSigned-offMetrotech Mechanical09/03/2024
DOB NOWSuspended ScaffoldPermit IssuedDemari Services08/16/2024
DOB NOWStructuralPermit IssuedGDC Contracting06/20/2024
DOB NOWMechanical SystemsPermit IssuedLTB Mechanical06/20/2024
DOB NOWPlumbingSigned-offForte Express P & H05/28/2024
DOB NOWMechanical SystemsPermit IssuedHighline Construction GR05/28/2024
DOB NOWGeneral ConstructionPermit IssuedHighline Construction GR05/28/2024
DOB NOWSprinklersPermit IssuedAll Pro Plumbing & Heating04/04/2024
DOB NOWPlumbingSigned-offSuper Plumbers01/18/2024
+ 60 more permits on file
5 projects · most recent 06/01/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/01/2026Permit IssuedZale ContractingAir Conditioning Systems
Cooling
Ice Air 8RS1618 15,900 BTU · Ptac ×4
05/15/2025Permit IssuedHighline Construction GRAir Conditioning Systems
Cooling
Task 25UCX-0-HK 800 CFM · Fan Coil Indoor ×2
TGC021TWEC-19K 19,500 BTU · Condensing Unit ×2
TGC021TWEC-25K 25,400 BTU · Condensing Unit ×2
19HXX-0-C 600 CFM · Fan Coil Indoor ×1
19UCX-0-HK 600 CFM · Fan Coil Indoor ×1
05/08/2025——Air Conditioning Systems
Cooling
Ephoca APK10N4H2 15,000 BTU · Heat Pump Outdoor ×3
Above Air VCU-C-018-1-X 18,500 BTU · Condensing Unit ×1
VCU-H-024-1-X 24,100 BTU · Condensing Unit ×1
03/25/2025Signed-offS. DonadicAir Conditioning Systems
Cooling
Islandaire EZPD16K2HBN37AA 340 CFM · Ptac ×3
07/28/2023Permit IssuedGDC ContractingAir Conditioning Systems
Cooling
Mitsubishi Electric MXA-SM48NAMHZ 48,000 BTU · Vrf Outdoor ×3
MXZ-SM60NAM 60,000 BTU · Heat Pump Outdoor ×1
1 project · most recent 10/13/2023
FiledStatusContractorScope
10/13/2023Permit IssuedAll Pro Plumbing & Heating32 heads
9 projects · most recent 06/26/2026
Water/Sanitary Gas
FiledStatusContractorScope
06/26/2026Permit IssuedHydrokinetic Plumbing & Heating IWater/Sanitary
06/01/2026Permit IssuedHydrokinetic Plumbing & Heating IWater/Sanitary
01/15/2026Signed-offDonato PlumbingWater/Sanitary
06/10/2025Signed-offArcon Plumbing SolutionsWater/Sanitary
05/15/2025Signed-offForte Express P & HWater/Sanitary
03/25/2025Signed-offDonato PlumbingWater/Sanitary
09/20/2024Signed-offDynamic Blue Water MechanicalWater/Sanitary
09/01/2023Signed-offMetrotech MechanicalGas, Water/Sanitary
02/02/2023Signed-offForte Express P & HGas, Water/Sanitary
25 projects · most recent 06/28/2026
General Wiring Lighting
FiledStatusContractorScope
06/28/2026Permit IssuedKris Electrical SolutionsGeneral Wiring
05/22/2026CompleteWMS Electrical ContngGeneral Wiring
07/09/2025CompleteMarks ElectricGeneral Wiring
06/30/2025CompleteHigh Quality Electric of NYC—
05/19/2025CompleteEinstein ElectricalGeneral Wiring
05/19/2025CompleteEinstein Electrical—
03/13/2025Permit IssuedEco Electrical Servcs—
10/24/2024Permit IssuedEco Electrical ServcsGeneral Wiring, Lighting
07/20/2024CompletePower Surge ElectricGeneral Wiring
07/10/2024CompleteEco Electrical ServcsGeneral Wiring, Lighting
06/13/2024CompleteKris Electrical SolutionsGeneral Wiring
05/28/2024CompleteEco Electrical Servcs—
05/24/2024CompleteDN ElectricGeneral Wiring
11/13/2023Permit IssuedArgon ElectricalGeneral Wiring
09/25/2023Permit IssuedJoseph Weinstein ElectricGeneral Wiring
1 project · most recent 10/10/2023
Concrete
FiledStatusContractorScope
10/10/2023Permit IssuedGDC ContractingConcrete
1 project · most recent 08/08/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
08/08/2024Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 35
DateTypeResultReport
08/19/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/15/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/10/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/12/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/01/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/31/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/02/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/01/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/01/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/20/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/02/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/15/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/09/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/08/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/30/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/27/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/27/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/29/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/21/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
Latest 25 of 35.
▾Special Inspection Requirements (DOB NOW) — 72
DateRequirementInspectorRole
07/01/2026FinalAlbert Beteshprogress
07/01/2026Fire-Resistant Penetrations and JointsMichael Patinospecial
06/16/2026FinalAlbert Beteshprogress
06/16/2026Fire-Resistant Penetrations and JointsMichael Patinospecial
06/10/2026FinalAlbert Beteshprogress
06/10/2026Fire-Resistant Penetrations and JointsMichael Patinospecial
05/27/2026FinalAlbert Beteshprogress
05/27/2026Fire-Resistant Penetrations and JointsMichael Patinospecial
02/27/2026Mechanical SystemsMichael Patinospecial
02/27/2026FinalMichael Patinoprogress
07/03/2025Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
05/29/2025FinalJohn Murrayprogress
05/29/2025Fire-Resistant Penetrations and JointsNicolas Crosettospecial
05/19/2025FinalALEKSANDR LEVINprogress
05/19/2025Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
04/30/2025FinalJohn Murrayprogress
04/30/2025Fire-Resistant Penetrations and JointsNicolas Crosettospecial
04/30/2025Mechanical SystemsNicolas Crosettospecial
04/30/2025FinalNicolas Crosettoprogress
04/30/2025Fire-Resistant Penetrations and JointsNicolas Crosettospecial
04/10/2025Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
03/14/2025Fire-Resistant Penetrations and JointsNicolas Crosettospecial
03/14/2025FinalNicolas Crosettoprogress
03/14/2025Tenant Protection Plan ComplianceNicolas Crosettospecial
09/27/2024Tenant Protection Plan ComplianceJACK GREENspecial
Latest 25 of 72.
▾Documents — 1,436 on file (BIS + DOB NOW)
▸Plans & Drawings66
▸DOB NOWPlans/Sketch62
09/03/2026M00514597-I1Request digital key ↗
09/03/2026M00580169-I1Request digital key ↗
09/03/2026M00580169-P2Request digital key ↗
Showing 3 of 62 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00268123-I1Request digital key ↗
09/04/2026M00370411-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00344301-P1Request digital key ↗
09/04/2026M00344301-I1Request digital key ↗
▸Applications & Permits316
▸BISWORK PERMIT APPLICATION138
09/06/2022123124519Open ↗
03/02/2022123486183Open ↗
07/27/2020123889836Open ↗
Showing 3 of 138 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION116
10/31/2025101845648Open ↗
02/24/2023123069669Open ↗
02/15/2023104198538Open ↗
Showing 3 of 116 on file for this type
▸DOB NOWLPC Approval/Permit62
09/04/2026M00344301-P1Open ↗
09/04/2026M00344301-I1Open ↗
09/03/2026M00580169-I1Open ↗
Showing 3 of 62 on file for this type
▸Seals & Professional Certifications330
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION142
12/12/2019123782335Open ↗
12/12/2019123782335Open ↗
09/11/2019122084485Open ↗
Showing 3 of 142 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature65
09/05/2026M00268123-I1Open ↗
09/04/2026M00370411-I1Open ↗
09/04/2026M00344301-I1Open ↗
Showing 3 of 65 on file for this type
▸DOB NOWProgress Inspector Seal & Signature36
10/09/2026M00660637-I1Open ↗
09/05/2026M01018777-P1Open ↗
09/02/2026M00789084-I1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature29
10/09/2026M00660637-I1Open ↗
09/07/2026M00660603-I1Open ↗
09/05/2026M01018777-P1Open ↗
Showing 3 of 29 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST25
08/18/2022123486183Open ↗
06/03/2019123782335Open ↗
Showing 2 of 25 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT14
06/03/2019123782335Open ↗
Showing 1 of 14 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment91
▸BISSELF-CERT PLUMBING NOTICE29
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 29 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE27
07/23/2019123782335Open ↗
07/19/2019123124519Open ↗
06/28/2019123486183Open ↗
Showing 3 of 27 on file for this type
▸BISSCHEDULE B - PLUMBING22
04/04/2022123486183Open ↗
03/31/2022123486183Open ↗
03/29/2022123486183Open ↗
Showing 3 of 22 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT7
07/21/2021123782193Open ↗
07/15/2021123782193Open ↗
Showing 2 of 7 on file for this type
▸BISEQUIPMENT USE PERMITS6
10/04/2022123486183Open ↗
07/21/2021123782193Open ↗
07/15/2021123782193Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection21
▸BISTenant Protection Plan and Notes14
06/04/2019123782193Open ↗
06/03/2019123782335Open ↗
Showing 2 of 14 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE3
07/20/2020123833370Open ↗
07/20/2020123833370Open ↗
07/20/2020123833370Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
05/27/2020123833370Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWTenant Protection Plan2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos108
▸DOB NOWDEP ACP-5: Asbestos Assessment Report45
09/05/2026M00268123-I1Open ↗
09/04/2026M00370411-I1Open ↗
09/04/2026M00344301-P1Open ↗
Showing 3 of 45 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)30
07/10/2020123833370Open ↗
06/07/2019123782335Open ↗
06/04/2019123782193Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form16
09/03/2026M00514597-I1Open ↗
08/29/2026M00916884-I1Open ↗
08/29/2026M00916894-I1Open ↗
Showing 3 of 16 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
06/20/2019123889836Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance70
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS34
09/11/2019122084485Open ↗
09/11/2019122084485Open ↗
06/18/2019123889836Open ↗
Showing 3 of 34 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS16
07/14/2021123782193Open ↗
02/23/2021123889836Open ↗
09/11/2019122084485Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: ENERGY6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWEN2: As Built Energy Analysis3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
07/14/2021123782193Open ↗
02/23/2021123889836Open ↗
▸BISLIGHTING IN DWELLING UNITS1
03/03/2023123069669Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/03/2023123069669Open ↗
▸Inspections & Test Reports22
▸BISTECHNICAL REPORT: RESPONSIBILITY16
10/31/2025101845648Open ↗
10/31/2025101845648Open ↗
05/18/2023123833370Open ↗
Showing 3 of 16 on file for this type
▸BISFIRE-RESISTIVE RATED CONSTRUCTION2
03/03/2023123069669Open ↗
10/04/2022123486183Open ↗
▸BISPOST-INSTALLED ANCHORS1
10/04/2022123486183Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
10/04/2022123486183Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
05/18/2023123833370Open ↗
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
10/25/2021101913431Open ↗
▸Approvals, Objections & Sign-offs141
▸BISLANDMARKS APPROVAL49
06/19/2020123833370Open ↗
12/12/2019123782335Open ↗
09/11/2019122084485Open ↗
Showing 3 of 49 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST47
10/31/2025101845648Open ↗
05/19/2023123833370Open ↗
03/06/2023123069669Open ↗
Showing 3 of 47 on file for this type
▸BISADMINISTRATIVE OBJECTIONS17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION15
03/02/2022123486183Open ↗
10/25/2021101913431Open ↗
Showing 2 of 15 on file for this type
▸BISLANDMARKS SIGNOFF5
05/19/2023123833370Open ↗
03/06/2023123069669Open ↗
07/11/2022123486183Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER3
07/27/2020123889836Open ↗
06/29/2020123889836Open ↗
Showing 2 of 3 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFINAL2
03/03/2023123069669Open ↗
10/04/2022123486183Open ↗
▸Cost, Insurance & Ownership104
▸BISCOST AFFIDAVIT95
10/31/2025101845648Open ↗
10/31/2025101845648Open ↗
02/23/2021123889836Open ↗
Showing 3 of 95 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT5
07/10/2020123833370Open ↗
Showing 1 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
05/18/2023123833370Open ↗
03/03/2023123069669Open ↗
10/04/2022123486183Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms124
▸BISEFILING COVER SHEET51
05/27/2020123833370Open ↗
06/03/2019123782335Open ↗
Showing 2 of 51 on file for this type
▸BISADDITIONAL INFORMATION49
08/25/2022123486183Open ↗
03/30/2022123124519Open ↗
03/23/2022123486183Open ↗
Showing 3 of 49 on file for this type
▸BISBOROUGH INTAKE FORM21
09/07/2022123124519Open ↗
03/02/2022123486183Open ↗
07/27/2020123889836Open ↗
Showing 3 of 21 on file for this type
▸BISeFiling Job Application Cover Sheet3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Other Documents36
▸DOB NOWProof of Historic Building23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
05/27/2020123833370Open ↗
06/20/2019123889836Open ↗
Showing 2 of 6 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISREVISED LPC TO MATCH WITH THE PLANS1
12/08/2021123833370Open ↗
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type