💬 Discuss this project
1987Year Built
49Stories
O4Building Class
C6-4Zoning
1,596,521 sfGross Floor Area
23Units
LL97 Covered0 Active ViolationsFISP: SAFE
Office, 20+ stories, with or without commercial · Owner of record: WWP Office · 58,241 sf lot · 27.41 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofWwp Office LLC8p · 2 filings · 10 docs
Floor 58Pipe scaffold installation2p · 1 filing · 4 docs
Floor 57Pipe scaffold installation2p · 1 filing · 4 docs
Floor 56Pipe scaffold installation2p · 1 filing · 4 docs
Floor 55Pipe scaffold installation3p · 2 filings · 8 docs
Floor 54Pipe scaffold installation2p · 1 filing · 4 docs
Floor 53Pipe scaffold installation3p · 2 filings · 8 docs
Floor 52
Floor 51
Floor 50
Floor 49
Floor 48
Floor 47
Floor 463p · 2 filings · 4 docs
Floor 45
Floor 44
Floor 43
Floor 42
Floor 41Rxr Property Management LLC11p · 1 filing · 20 docs
Floor 40
Floor 39
Floor 38
Floor 37Health + Hospitals Carter Hospital, RXR Realty10p · 9 filings · 20 docs
Floor 36
Floor 35
Floor 34
Floor 33
Floor 32
Floor 31
Floor 30Rxr Property Management LLC12p · 1 filing · 20 docs
Floor 29Optimum16p · 5 filings · 20 docs
Floor 28Nomura Holdings America27p · 3 filings · 20 docs
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18Rxr Property Management LLC23p · 6 filings · 20 docs
Floor 17RXR Realty31p · 7 filings · 20 docs
Floor 16Nomura Holdings America20p · 4 filings · 20 docs
Floor 15Nomura Holdings America23p · 1 filing · 7 docs
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10Nomura Holdings America108p · 15 filings · 20 docs
Floor 9Nomura Holdings AmericaUnder Construction95p · 10 filings · 20 docs
Floor 8Nomura Holdings AmericaUnder Construction77p · 6 filings · 20 docs
Floor 7Nomura Holdings AmericaUnder Construction78p · 6 filings · 20 docs
Floor 6Nomura Holdings America19p · 3 filings · 20 docs
Floor 5Nomura Holdings America63p · 4 filings · 20 docs
Floor 4Nomura Holdings America40p · 8 filings · 20 docs
Floor 3
Floor 2WebMD1 filing · 6 docs
Floor 1RXR - WWP 9th Ave. Retail FP Upgrad5p · 1 filing · 6 docs
Mezzanine2p · 1 filing · 4 docs
CellarWwp Office LLC1p · 1 filing · 6 docs
Sub-CellarRXR - WWP 9th Ave. Retail FP Upgrad6p · 1 filing · 6 docs
Site & exteriorTypical sidewalk bridge installation3p · 2 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
George Comfort & Sons70003/21/2026
RXR Realty21607/08/2026
WWP Manager JV LLC RXR Properties4803/21/2026
Eop- Worldwide Plaza3203/21/2026
Equity Off2803/21/2026
WWP Office1007/08/2026
1301 Property Owners903/21/2026
Bre/Worldwide503/21/2026
Astor Place Holding Co. C/O C&W409/01/2026
SL Green Realty407/08/2026
Nomura Securities International403/22/2026
ZCWK Associates403/21/2026
Zeckendorf Realty403/21/2026
WZ Garden203/21/2026
Starbucks103/21/2026
Equities Office Properties103/21/2026
Center Associates103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Jaros Baum & Bolles908/07/2026
Gensler1208/04/2026
AMA Consulting Engineers110/02/2025
Loffredo Brooks Architects408/21/2025
Goldman Copeland Associates106/24/2025
Syska Hennessy Group1410/17/2024
Smith Engineering103/27/2023
AKF Engineers1112/20/2022
AK Engineering104/11/2022
Cosentini Associates808/14/2020
MG Engineering307/28/2020
Thornton Tomasetti103/12/2020
Tohfaz Uddin PE101/03/2020
S Associates212/02/2019
William Graham Rice104/05/2019
Salient Architects105/23/2018
Safway Atlantic205/14/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rizzo Group1303/21/2026
Codegreen1603/21/2026
Milrose Consultants3203/21/2026
Spring Scaffolding203/21/2026
EA Design Group203/21/2026
A1 Expediting Service403/21/2026
Construction Permit Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RXR Construction ServiceGeneral Contractor2407/08/2026
Structure ToneGeneral Contractor2008/26/2026
Safway AtlanticScaffold1007/08/2026
Preferred Sprinkler and MechanicalFire Protection607/08/2026
Abco-Peerless SprinklerFire Protection608/11/2026
MJH Energy ConsultingFire Protection507/08/2026
Pace PlumbingFire Protection507/08/2026
Spring ScaffoldingScaffold407/08/2026
Maccarone PlumbingPlumbing407/08/2026
Sterling ElectricElectrical303/21/2026
Samson ElectricElectrical303/21/2026
Phase 3 InteriorsGeneral Contractor204/09/2026
Lab Plumbing & Heating CoPlumbing207/08/2026
Timbil Mechanicalspecialty_contractor203/21/2026
Nead ElectricElectrical203/21/2026
Allan/Brite-Way Electrical CoElectrical103/22/2026
A&H Express Plumbing & HeatingPlumbing103/22/2026
Allstate SprinklerFire Protection107/08/2026
Pace PlumbingPlumbing107/08/2026
Preferred MechanicalPlumbing107/08/2026
Mih Systems GroupGeneral Contractor104/09/2026
Jam ElectricalElectrical103/21/2026
Star Electrical ContractorsElectrical103/21/2026
Fred Geller ElectricalElectrical103/21/2026
Inner City Electrical ContractorsElectrical103/21/2026
Stemco Electric LLC DbaElectrical103/21/2026
Stanco System Electrical ContElectrical103/21/2026
Matros Automated ElectricalElectrical103/22/2026
Star-Delta ElectricElectrical103/22/2026
V Electric NYElectrical103/22/2026
J.A. Lee Electricspecialty_contractor107/08/2026
JRM Construction ManagementGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Milrose Consultants20032408/07/2026
Hudson Peaks Consulting8381110/02/2025
Goldman Copeland Associates2826106/24/2025
Consulting and Testing SE61521303/27/2023
Skyline Engineering267712/20/2022
Special Inspection Services1200710/04/2022
Salient Associates585105/23/2018
Building Lifecycle
All (300)Filed (66)Permit Issued (66)Signed Off (41)Facade (FISP) (3)Violation (31)Inspection (25)Objection (38)Special Inspection (30)
09/08/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/08/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
08/20/2026
Signed off — Alteration
Filing herewith for sprinkler relocation as per plans filed herewith
M01384746-I1
08/10/2026
Permit issued — Mechanical Systems
M01430931-I1-MS
08/10/2026
Permit issued — Sprinklers
M01437327-I1-EW-SD
08/10/2026
Permit issued — Sprinklers
M01437327-I1-EW-SP
08/07/2026
Filed — Alteration
MECHANICAL MODIFICATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY,
M01430931-I1
08/07/2026
Filed — Alteration
SPRINKLER HEAD AND ASSOCIATED PIPING REMOVAL AND RELOCATION AS PER PLANS. RELOCATION OF FIRE HOSE CABINET AND ASSOCIATED PIPING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01437327-I1
08/05/2026
Permit issued — General Construction
M01430092-I1-GC
08/04/2026
Filed — Alteration
INSTALLATION OF NON-LOAD BEARING PARTITIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01430092-I1
07/30/2026
Signed off — Alteration
Removal and installation of non load bearing partitions as per plans filed herewith.
M01384739-I1
07/28/2026
Signed off — Alteration
Modification to existing HVAC system as per plans filed herewith; No change in use egess or occupancy.
M01384743-I1
07/28/2026
Special inspection requirement — Sprinkler Systems
Benjamin Plotnick
07/28/2026
Special inspection requirement — Post-installed Anchors
Benjamin Plotnick
07/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Benjamin Plotnick
07/28/2026
Special inspection requirement — Standpipe Systems
Benjamin Plotnick
07/14/2026
Special inspection requirement — Mechanical Systems
Benjamin Plotnick
07/14/2026
Special inspection requirement — Ventilation and air distribution system
Benjamin Plotnick
07/14/2026
Special inspection requirement — Duct leakage testing, insulation and design
Benjamin Plotnick
07/14/2026
Special inspection requirement — HVAC-R and service water heating system controls
Benjamin Plotnick
07/14/2026
Special inspection requirement — Final
Benjamin Plotnick
07/13/2026
Special inspection requirement — Final
Sandra Joslyn
07/13/2026
Special inspection requirement — Sprayed fire-resistant materials
Benjamin Plotnick
06/12/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/08/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/08/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/08/2026
Permit issued — Sprinklers
M01384746-I1-EW-SP
05/07/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/30/2026
Permit issued — General Construction
M01384739-I1-GC
04/30/2026
Permit issued — Mechanical Systems
M01384743-I1-MS
04/22/2026
Filed — Alteration
Filing herewith for sprinkler relocation as per plans filed herewith
M01384746-I1
04/22/2026
Filed — Alteration
Modification to existing HVAC system as per plans filed herewith; No change in use egess or occupancy.
M01384743-I1
04/17/2026
Filed — Alteration
Removal and installation of non load bearing partitions as per plans filed herewith.
M01384739-I1
04/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Drutjons
04/08/2026
Special inspection requirement — Final
Christopher Drutjons
04/08/2026
Special inspection requirement — Ventilation and air distribution system
Christopher Drutjons
04/08/2026
Special inspection requirement — Energy Code Compliance Inspections
Christopher Drutjons
04/08/2026
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
04/08/2026
Special inspection requirement — Final
Sandra Joslyn
04/08/2026
Special inspection requirement — Duct leakage testing, insulation and design
Christopher Drutjons
04/08/2026
Special inspection requirement — Mechanical Systems
Christopher Drutjons
04/08/2026
Special inspection requirement — Sprayed fire-resistant materials
Christopher Drutjons
04/08/2026
Special inspection requirement — Sprinkler Systems
Christopher Drutjons
10/03/2025
Permit issued — Mechanical Systems
M01291291-I1-MS
10/02/2025
Filed — Alteration
M01291291-I1
09/18/2025
Permit issued — General Construction
M01271114-I1-GC
08/21/2025
Filed — Alteration
M01271114-I1
06/24/2025
Filed — Alteration
Mechanical modifications taking place on 17th, 30th, 41st floors as per plans filed herewith. No change in use, egress or occupancy.
M01233177-I1
06/24/2025
Permit issued — Mechanical Systems
M01233177-I1-MS
05/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
DANIEL COLOMBINI
05/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
DANIEL COLOMBINI
05/29/2025
Special inspection requirement — HVAC-R and service water heating system controls
DANIEL COLOMBINI
05/29/2025
Special inspection requirement — Maintenance information
DANIEL COLOMBINI
05/29/2025
Special inspection requirement — Mechanical Systems
DANIEL COLOMBINI
05/29/2025
Special inspection requirement — Energy Code Compliance Inspections
DANIEL COLOMBINI
05/29/2025
Special inspection requirement — Final
DANIEL COLOMBINI
05/06/2025
Signed off — Alteration
INSTALLATION OF NON LOAD BEARING PARTITIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01185817-I1
03/26/2025
Permit issued — General Construction
M01185817-I1-GC
03/20/2025
Filed — Alteration
INSTALLATION OF NON LOAD BEARING PARTITIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01185817-I1
02/24/2025
Special inspection requirement — Final
Sandra Joslyn
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offStructure Tone08/10/2026
DOB NOWStandpipePermit IssuedAbco-Peerless Sprinkler08/10/2026
DOB NOWSprinklersPermit IssuedAbco-Peerless Sprinkler08/10/2026
DOB NOWGeneral ConstructionPermit IssuedStructure Tone08/05/2026
DOB NOWSprinklersSigned-offPreferred Sprinkler and Mechanical05/08/2026
DOB NOWGeneral ConstructionSigned-offStructure Tone04/30/2026
DOB NOWMechanical SystemsSigned-offStructure Tone04/30/2026
DOB NOWMechanical SystemsSigned-offPhase 3 Interiors10/03/2025
DOB NOWGeneral ConstructionPermit IssuedPhase 3 Interiors09/18/2025
DOB NOWMechanical SystemsPermit IssuedMih Systems Group06/24/2025
DOB NOWGeneral ConstructionSigned-offStructure Tone03/26/2025
DOB NOWSprinklersSigned-offPreferred Sprinkler and Mechanical07/23/2024
DOB NOWGeneral ConstructionSigned-offStructure Tone06/25/2024
DOB NOWGeneral ConstructionSigned-offStructure Tone06/21/2024
DOB NOWStandpipePermit IssuedManengeering Bureau01/09/2024
DOB NOWSprinklersPermit IssuedManengeering Bureau01/09/2024
DOB NOWPlumbingSigned-offPreferred Mechanical11/21/2023
DOB NOWSprinklersSigned-offPreferred Sprinkler and Mechanical11/21/2023
DOB NOWMechanical SystemsSigned-offTimbil Mechanical11/15/2023
DOB NOWMechanical SystemsSigned-offStructure Tone10/18/2023
DOB NOWGeneral ConstructionSigned-offStructure Tone10/18/2023
DOB NOWSprinklersSigned-offMJH Energy Consulting02/01/2023
DOB NOWPlumbingSigned-offMaccarone Plumbing01/17/2023
DOB NOWStandpipePermit IssuedManengeering Bureau01/11/2023
DOB NOWSprinklersPermit IssuedManengeering Bureau01/11/2023
DOB NOWGeneral ConstructionPermit IssuedRXR Construction Service12/22/2022
DOB NOWGeneral ConstructionPermit IssuedRXR Construction Service11/29/2022
DOB NOWMechanical SystemsPermit IssuedRXR Construction Service11/29/2022
DOB NOWSprinklersSigned-offManengeering Bureau08/30/2022
DOB NOWPlumbingSigned-offPace Plumbing08/23/2022
DOB NOWSprinklersSigned-offPreferred Sprinkler and Mechanical08/03/2022
DOB NOWGeneral ConstructionSigned-offStructure Tone06/15/2022
DOB NOWMechanical SystemsSigned-offRXR Construction Service05/25/2022
DOB NOWGeneral ConstructionSigned-offRXR Construction Service05/24/2022
DOB NOWGeneral ConstructionSigned-offJRM Construction Management04/14/2022
DOB NOWSprinklersSigned-offPreferred Sprinkler and Mechanical03/14/2022
DOB NOWPlumbingSigned-offLab Plumbing & Heating Co03/14/2022
DOB NOWGeneral ConstructionSigned-offStructure Tone02/22/2022
DOB NOWMechanical SystemsSigned-offStructure Tone02/18/2022
DOB NOWGeneral ConstructionSigned-offStructure Tone08/12/2021
+ 60 more permits on file
1 project · most recent 06/24/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/24/2025Permit IssuedMih Systems GroupAir Conditioning Systems
Cooling
Climatemaster SB-120 122,100 BTU · Wshp ×30
6 projects · most recent 08/07/2026
FiledStatusContractorScope
08/07/2026Permit IssuedAbco-Peerless Sprinkler—
04/22/2026Signed-offPreferred Sprinkler and Mechanical3 heads
11/22/2022Permit IssuedManengeering Bureau1 outlets
11/22/2022Permit IssuedManengeering Bureau—
06/29/2021Permit IssuedAllstate Sprinkler—
06/25/2020Permit IssuedMJH Energy Consulting304 heads
2 projects · most recent 08/07/2026
Water/Sanitary
FiledStatusContractorScope
08/07/2026———
11/22/2022——Water/Sanitary
23 projects · most recent 06/04/2026
General Wiring Lighting
FiledStatusContractorScope
06/04/2026Permit IssuedAllan Briteway ElectricalGeneral Wiring
01/08/2026Permit IssuedJam Electrical—
08/29/2025Permit IssuedJam Electrical—
07/07/2025CompleteAllan/Brite-Way Electrical CoGeneral Wiring
07/07/2025CompleteAllan/Brite-Way Electrical CoGeneral Wiring
06/02/2025Permit IssuedAllstate ElectricGeneral Wiring
05/27/2025CompleteAllan Briteway ElectricalGeneral Wiring
05/27/2025CompleteAllan/Brite-Way Electrical CoGeneral Wiring
07/18/2024CompleteUsis Electric—
05/23/2024CompleteE-J Electric Installation CoGeneral Wiring
05/20/2024Permit IssuedPenguin Maintenance & Service1 meters
12/05/2023CompleteAllan/Brite-Way Electrical CoGeneral Wiring
12/01/2022Permit IssuedTransform Electl Contractors I—
10/05/2022Permit IssuedSafetech Electrical ContngGeneral Wiring
06/06/2022Permit IssuedTransform Electl Contractors IGeneral Wiring
1 project · most recent 05/14/2018
Scaffold
FiledStatusContractorScope
05/14/2018Permit IssuedSafway AtlanticScaffold
▾Field Inspections (DOB CAP) — 25
DateTypeResultReport
09/08/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/08/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
06/12/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/08/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/08/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/07/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
11/08/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/01/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/11/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/05/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/05/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/06/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/27/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/19/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/11/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/11/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/23/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/18/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/28/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/21/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/19/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/21/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/20/2021Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
08/18/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/18/2021Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 96
DateRequirementInspectorRole
07/28/2026Fire-Resistant Penetrations and JointsBenjamin Plotnickspecial
07/28/2026Standpipe SystemsBenjamin Plotnickspecial
07/28/2026Sprinkler SystemsBenjamin Plotnickspecial
07/28/2026Post-installed AnchorsBenjamin Plotnickspecial
07/14/2026Duct leakage testing, insulation and designBenjamin Plotnickenergy_progress
07/14/2026FinalBenjamin Plotnickprogress
07/14/2026Mechanical SystemsBenjamin Plotnickspecial
07/14/2026Ventilation and air distribution systemBenjamin Plotnickenergy_progress
07/14/2026HVAC-R and service water heating system controlsBenjamin Plotnickenergy_progress
07/13/2026Sprayed fire-resistant materialsBenjamin Plotnickspecial
07/13/2026FinalSandra Joslynprogress
04/08/2026Ventilation and air distribution systemChristopher Drutjonsenergy_progress
04/08/2026Sprayed fire-resistant materialsChristopher Drutjonsspecial
04/08/2026FinalSandra Joslynprogress
04/08/2026Mechanical SystemsChristopher Drutjonsspecial
04/08/2026FinalChristopher Drutjonsprogress
04/08/2026Post-installed AnchorsChristopher Drutjonsspecial
04/08/2026Sprinkler SystemsChristopher Drutjonsspecial
04/08/2026Duct leakage testing, insulation and designChristopher Drutjonsenergy_progress
04/08/2026HVAC-R and service water heating system controlsChristopher Drutjonsenergy_progress
04/08/2026Energy Code Compliance InspectionsChristopher Drutjonsprogress
05/29/2025Energy Code Compliance InspectionsDANIEL COLOMBINIprogress
05/29/2025Maintenance informationDANIEL COLOMBINIenergy_progress
05/29/2025HVAC-R and service water heating system controlsDANIEL COLOMBINIenergy_progress
05/29/2025HVAC-R and service water piping design and insulationDANIEL COLOMBINIenergy_progress
Latest 25 of 96.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Nomura Holdings AmericaOfficeFloors 4–10, 15, 16, 28
Project M01430931 Alteration · Permit Entire · 08/07/2026
Project M01437327 Alteration · Permit Entire · 08/07/2026
Project M01430092 Alteration · Permit Entire · 08/04/2026
Project M01384743 Alteration · LOC Issued · 04/22/2026
Project M01384746 Alteration · LOC Issued · 04/22/2026
Project M01384739 Alteration · LOC Issued · 04/17/2026
Project M01185817 Alteration · LOC Issued · 03/20/2025
Project M01061020 Alteration · LOC Issued · 06/18/2024
Project M01065338 Alteration · LOC Issued · 06/18/2024
Project M01060871 Alteration · LOC Issued · 06/17/2024
Project M00932850 Alteration · LOC Issued · 10/13/2023
Project M00932876 Alteration · LOC Issued · 10/12/2023
RXR RealtyOfficeFloor 37
Project M08045864 Alteration · Approved · 12/20/2022
Project M08045891 Alteration · Approved · 12/20/2022
Project M08045899 Alteration · Approved · 12/20/2022
Project M08045851 Alteration · Permit Entire · 12/19/2022
Health + Hospitals Carter HospitalMedical / HealthcareFloor 37
Project M08037363 Alteration · Permit Entire · 11/22/2022
Project M08037368 Alteration · Permit Entire · 11/22/2022
Project M08037375 Alteration · Approved · 11/22/2022
Project M08037386 Alteration · Permit Entire · 11/22/2022
Project M08037400 Alteration · Permit Entire · 11/22/2022
WebMDMedical / HealthcareFloor 2
Project M00710940 Alteration · LOC Issued · 04/11/2022
OptimumRetailFloor 29
Project M00361545 Alteration · LOC Issued · 07/08/2020
Project M00361555 Alteration · LOC Issued · 07/08/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 5,297 on file (BIS + DOB NOW)
▸Plans & Drawings74
▸DOB NOWPlans/Sketch57
09/06/2026M00038833-I1Request digital key ↗
09/06/2026M00042715-I1Request digital key ↗
09/03/2026M00511543-I1Request digital key ↗
Showing 3 of 57 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems5
09/05/2026M00264475-I1Request digital key ↗
09/04/2026M00378687-I1Request digital key ↗
Showing 2 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler5
09/05/2026M00264491-I1Request digital key ↗
09/04/2026M00292291-I1Request digital key ↗
09/04/2026M00361555-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/04/2026M00291818-I1Request digital key ↗
09/04/2026M00378689-I1Request digital key ↗
Showing 2 of 3 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly2
09/05/2026M00148275-I1Request digital key ↗
09/05/2026M00243352-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00263434-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00241771-I1Request digital key ↗
▸Applications & Permits995
▸BISPLAN / WORK APPROVAL APPLICATION582
11/06/2025120835436Open ↗
11/14/2022123450960Open ↗
02/25/2020123789828Open ↗
Showing 3 of 582 on file for this type
▸BISWORK PERMIT APPLICATION387
03/16/2020123670982Open ↗
02/26/2020123789828Open ↗
01/27/2020123789784Open ↗
Showing 3 of 387 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit10
09/03/2026M00568935-I1Open ↗
09/02/2026M00679193-I1Open ↗
Showing 2 of 10 on file for this type
▸BISPLACE OF ASSEMBLY9
02/13/2020103096169Open ↗
02/03/2020103096169Open ↗
Showing 2 of 9 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Seals & Professional Certifications1,370
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION818
03/10/2020123527905Open ↗
03/10/2020123527905Open ↗
03/10/2020123527905Open ↗
Showing 3 of 818 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST156
02/25/2020123789828Open ↗
01/27/2020123789784Open ↗
01/13/2020123789819Open ↗
Showing 3 of 156 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM104
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 104 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT104
02/25/2020123789828Open ↗
01/27/2020123789784Open ↗
01/13/2020123789819Open ↗
Showing 3 of 104 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature74
09/06/2026M00038833-I1Open ↗
09/05/2026M00148275-I1Open ↗
09/05/2026M00264491-I1Open ↗
Showing 3 of 74 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature46
10/18/2026M01430931-I1Open ↗
09/30/2026M00511574-I1Open ↗
09/30/2026M00511574-I1Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWProgress Inspector Seal & Signature46
10/18/2026M01430931-I1Open ↗
10/18/2026M01430931-I1Open ↗
09/30/2026M00511574-I1Open ↗
Showing 3 of 46 on file for this type
▸BISPC FULL REPORT9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISProfessional and Owner Certification (POC3)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Trade Schedules & Equipment579
▸BISSELF-CERT PLUMBING NOTICE212
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 212 on file for this type
▸BISSCHEDULE B - PLUMBING158
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 158 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA66
06/15/2021123383944Open ↗
02/18/2020123155780Open ↗
Showing 2 of 66 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE62
04/26/2019123430457Open ↗
Showing 1 of 62 on file for this type
▸BISEQUIPMENT USE PERMITS28
02/14/2020123872942Open ↗
Showing 1 of 28 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8523
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT18
02/14/2020123872942Open ↗
Showing 1 of 18 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSIGN HANGER CERTIFICATE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSTANDPIPE INSP REPORT : FP-843
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Safety & Tenant Protection231
▸BISANTI-HARASSMENT CHECKLIST: CLINTON116
02/25/2020123789828Open ↗
01/27/2020123789784Open ↗
01/15/2020123789819Open ↗
Showing 3 of 116 on file for this type
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist72
09/06/2026M00038833-I1Open ↗
09/03/2026M00568935-I1Open ↗
09/02/2026M00679882-I1Open ↗
Showing 3 of 72 on file for this type
▸BISHPD-2 - Clinton Special district Anti-Harassment Checklist24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸DOB NOWCertificate of No Harassment15
09/03/2026M00568935-I1Open ↗
09/02/2026M00679193-I1Open ↗
Showing 2 of 15 on file for this type
▸BISSTREET TREE CHECKLIST4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Environmental & Asbestos373
▸BISASBESTOS: CERTIFICATION (DEP ACP5)150
02/25/2020123789828Open ↗
01/27/2020123789784Open ↗
01/16/2020123789819Open ↗
Showing 3 of 150 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'125
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 125 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report70
09/05/2026M00264491-I1Open ↗
09/04/2026M00291784-I1Open ↗
09/04/2026M00378689-I1Open ↗
Showing 3 of 70 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Energy Compliance187
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS120
02/25/2020123789828Open ↗
02/20/2020123872942Open ↗
02/20/2020123872942Open ↗
Showing 3 of 120 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS36
05/19/2021123149342Open ↗
06/24/2020123845410Open ↗
02/20/2020123872942Open ↗
Showing 3 of 36 on file for this type
▸BISTR8: Energy Code Progress Inspections17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISTECHNICAL REPORT: ENERGY12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸DOB NOWEN2: As Built Energy Analysis2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports26
▸BISHYDRAULIC FLOW CALCULATIONS15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY6
05/19/2021123149342Open ↗
06/24/2020123845410Open ↗
Showing 2 of 6 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)3
12/20/2023123789828Open ↗
09/28/2022123450960Open ↗
09/28/2022123450960Open ↗
▸BISMECHANICAL SYSTEMS2
09/28/2022123450960Open ↗
09/28/2022123450960Open ↗
▸Approvals, Objections & Sign-offs410
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST180
11/16/2022123450960Open ↗
05/19/2021123149342Open ↗
06/24/2020123845410Open ↗
Showing 3 of 180 on file for this type
▸BISADMINISTRATIVE OBJECTIONS152
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 152 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE41
12/26/2019122687137Open ↗
10/01/2019122687137Open ↗
10/01/2019122687137Open ↗
Showing 3 of 41 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION29
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 29 on file for this type
▸BISSUPERSEDING LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISCCD1-Construction Code Determination3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Cost, Insurance & Ownership484
▸BISCOST AFFIDAVIT484
05/19/2021123149342Open ↗
06/24/2020123845410Open ↗
03/10/2020123527905Open ↗
Showing 3 of 484 on file for this type
▸Filing & Intake Forms494
▸BISEFILING COVER SHEET310
02/25/2020123789828Open ↗
01/27/2020123789784Open ↗
01/13/2020123789819Open ↗
Showing 3 of 310 on file for this type
▸BISADDITIONAL INFORMATION115
04/11/2019123544012Open ↗
04/11/2019123544012Open ↗
Showing 2 of 115 on file for this type
▸BISBOROUGH INTAKE FORM52
03/10/2020123527905Open ↗
02/28/2020123155780Open ↗
02/20/2020123872942Open ↗
Showing 3 of 52 on file for this type
▸BISeFiling Job Application Cover Sheet17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸Other Documents41
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISOP-129 INTERNAL (SECONDARY) BACKFLOW PREVENTION DEVICE TEST REPORT12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸DOB NOWMultiple Dwelling Special District Notice to Community Board3
09/06/2026M00038833-I1Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWMultiple Dwelling Special District Feasibility of Government Funded Rehabilitation3
09/06/2026M00038833-I1Open ↗
Showing 1 of 3 on file for this type