Office with commercial, 7-19 stories
825 EAST 141ST STREET
BRONX · Mott Haven-Port Morris · BIN 2097203
💬 Discuss this project
1916Year Built
7Stories
O6Building Class
M3-1Zoning
275,000 sfGross Floor Area
2Units
LL97 Covered0 Active ViolationsFISP: SAFE
Office with commercial, 7-19 stories · Owner of record: MK 141 Street Owner · 39,100 sf lot · 7.03 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofYyy 62nd Street LLC20p · 1 filing · 20 docs
Floor 7Yyy 62nd Street LLC25p · 3 filings · 20 docs
Floor 6Yyy 62nd Street LLC25p · 3 filings · 20 docs
Floor 5Yyy 62nd Street LLC25p · 2 filings · 20 docs
Floor 4Yyy 62nd Street LLC26p · 2 filings · 20 docs
Floor 3Yyy 62nd Street LLC26p · 2 filings · 20 docs
Floor 2Yyy 62nd Street LLC26p · 3 filings · 20 docs
Floor 1Yyy 62nd Street LLC28p · 4 filings · 20 docs
CellarYyy 62nd Street LLC8p · 1 filing · 20 docs
BasementYyy 62nd Street LLC7p · 3 filings · 20 docs
Sub-BasementYyy 62nd Street LLC27p · 3 filings · 20 docs
Site & exteriorPipe scaffold installation7p · 2 filings · 8 docs
Filed — no permit issued825 East 141st Street Owner LLC1p · 2 filings · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
825 E 141st St Properties Owner3903/21/2026
YYY 62nd Street2707/08/2026
National Equipment903/21/2026
825 East 141st Street Owner403/21/2026
MK 141 Street Owner103/22/2026
Madison Realty Capital103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Aufgang Architects502/18/2025
Ettinger Engineering Associates602/12/2025
Brooker Engineering112/09/2024
TSF Engineering112/24/2020
Regenesis Partners103/05/2019
Joel Phagoo P.E107/23/2018
Baileys Engineering102/15/2018
Inm Architects211/29/2017
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM Zoning2403/21/2026
Inm Architects403/21/2026
Milrose Consultants203/21/2026
Advanced Builders Services103/21/2026
Spring Scaffolding203/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Spring ScaffoldingScaffold1007/08/2026
Gdi ConstructionGeneral Contractor407/08/2026
Accurate MechanicalFire Protection107/08/2026
HF Group Plumbing & SpnklerFire Protection107/08/2026
Smart Plumbing & HeatingPlumbing107/08/2026
Accurate MechanicalPlumbing107/08/2026
Star Electrical ContractorsElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Vibranalysis Inc., Dba VT6864702/12/2025
HRF Services5616112/24/2020
Building Lifecycle
All (156)Filed (18)Permit Issued (11)Signed Off (7)Facade (FISP) (16)Violation (60)Inspection (6)Objection (12)Special Inspection (26)
02/21/2025
Signed off — Alteration
Mechanical application filed in conjunction with a Temporary Use Permit (TUP) for asylum seeker respite center pursuant to emergency executive order #230.
X00975931-I1
02/20/2025
Signed off — Alteration
Mechanical application filed in conjunction with a Temporary Use Permit (TUP) for asylum seeker respite center pursuant to emergency executive order #230.
X00975931-S2
02/20/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/20/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/18/2025
Signed off — Alteration
Mechanical application filed in conjunction with a Temporary Use Permit (TUP) for asylum seeker respite center pursuant to emergency executive order #230.
X00975931-S3
02/18/2025
Filed — Alteration
Mechanical application filed in conjunction with a Temporary Use Permit (TUP) for asylum seeker respite center pursuant to emergency executive order #230.
X00975931-P5
02/18/2025
Signed off — Alteration
Mechanical application filed in conjunction with a Temporary Use Permit (TUP) for asylum seeker respite center pursuant to emergency executive order #230.
X00975931-S1
02/18/2025
Special inspection requirement — Interior lighting power
JUAN GOMEZ
02/18/2025
Special inspection requirement — Lighting in dwelling units
JUAN GOMEZ
02/18/2025
Special inspection requirement — Lighting controls
JUAN GOMEZ
02/18/2025
Special inspection requirement — Final
JUAN GOMEZ
02/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
02/14/2025
Special inspection requirement — Mechanical Systems
JUAN GOMEZ
02/14/2025
Special inspection requirement — Final
JUAN GOMEZ
02/14/2025
Special inspection requirement — Sprinkler Systems
JUAN GOMEZ
02/12/2025
Filed — Alteration
Mechanical application filed in conjunction with a Temporary Use Permit (TUP) for asylum seeker respite center pursuant to emergency executive order #230.
X00975931-P4
02/12/2025
Filed — Alteration
Mechanical application filed in conjunction with a Temporary Use Permit (TUP) for asylum seeker respite center pursuant to emergency executive order #230.
X00975931-P3
02/12/2025
Special inspection requirement — Sprinkler Systems
JUAN GOMEZ
02/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
02/10/2025
Permit issued — Mechanical Systems
X00975931-S3-MS
02/10/2025
Special inspection requirement — Mechanical Systems
JUAN GOMEZ
02/10/2025
Special inspection requirement — Final
JUAN GOMEZ
02/07/2025
Filed — Alteration
Mechanical application filed in conjunction with a Temporary Use Permit (TUP) for asylum seeker respite center pursuant to emergency executive order #230.
X00975931-P2
02/07/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/05/2025
Special inspection requirement — Final
JUAN GOMEZ
02/05/2025
Special inspection requirement — Lighting in dwelling units
JUAN GOMEZ
02/05/2025
Special inspection requirement — Interior lighting power
JUAN GOMEZ
02/05/2025
Special inspection requirement — Lighting controls
JUAN GOMEZ
02/03/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/31/2025
Filed — Alteration
Mechanical application filed in conjunction with a Temporary Use Permit (TUP) for asylum seeker respite center pursuant to emergency executive order #230.
X00975931-P1
01/31/2025
Objection raised — Structural
01/31/2025
Objection resolved — Addressed
01/31/2025
Objection raised — Structural
01/31/2025
Objection resolved — Addressed
01/30/2025
Special inspection requirement — Sprinkler Systems
JUAN GOMEZ
01/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
01/22/2025
Signed off — Alteration
ST application filed for slab infill.
X01152147-I1
01/16/2025
Filed — No Work
X01161829-I1
01/16/2025
Filed — No Work
X01160652-I1
01/16/2025
Permit issued — General Construction
X00975931-I1-GC
01/08/2025
Permit issued — Sprinklers
X00975931-S2-EW-SP
01/03/2025
Permit issued — Structural
X01152147-I1-ST
12/31/2024
Objection resolved — Addressed
12/31/2024
Objection resolved — Addressed
12/27/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/20/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/16/2024
Permit issued — Plumbing
X00975931-S1-PL
12/16/2024
Objection raised — Fire_Protection
12/16/2024
Objection raised — Admin
12/09/2024
Filed — Alteration
Mechanical application filed in conjunction with a Temporary Use Permit (TUP) for asylum seeker respite center pursuant to emergency executive order #230.
X00975931-I1
12/09/2024
Filed — Alteration
Mechanical application filed in conjunction with a Temporary Use Permit (TUP) for asylum seeker respite center pursuant to emergency executive order #230.
X00975931-S2
12/09/2024
Filed — Alteration
Mechanical application filed in conjunction with a Temporary Use Permit (TUP) for asylum seeker respite center pursuant to emergency executive order #230.
X00975931-S3
12/09/2024
Filed — Alteration
Mechanical application filed in conjunction with a Temporary Use Permit (TUP) for asylum seeker respite center pursuant to emergency executive order #230.
X00975931-S1
12/09/2024
Filed — Alteration
ST application filed for slab infill.
X01152147-I1
12/04/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JUAN GOMEZ
12/04/2024
Special inspection requirement — Energy Code Compliance Inspections
JUAN GOMEZ
11/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
09/06/2023
Cycle 9 facade report submitted
08/31/2023
Cycle 9 facade report signed — SAFE
08/22/2023
Cycle 9 facade inspection completed
Latest 60 of 156 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offGdi Construction02/10/2025
DOB NOWGeneral ConstructionSigned-offGdi Construction01/16/2025
DOB NOWSprinklersSigned-offHF Group Plumbing & Spnkler01/08/2025
DOB NOWStructuralSigned-offGdi Construction01/03/2025
DOB NOWPlumbingSigned-offSmart Plumbing & Heating12/16/2024
DOB NOWPlumbingSigned-offAnthony Disabato01/08/2021
DOB NOWSprinklersPermit IssuedAccurate Mechanical01/08/2021
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding12/26/2018
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding07/23/2018
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding02/27/2018
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding02/15/2018
BISOTISSUEDJaab Holdings01/26/2021
BISPLISSUEDMagic Mechanical11/19/2019
BISSDISSUEDAshlar Mechanical04/12/2019
BISOTISSUEDLawrence Exterior Restoration02/26/2019
BISEQISSUEDSpring Scaffolding11/14/2018
BISBLISSUEDLiberty Plumbing11/13/2018
BISFSISSUEDNeal M. Rudikoff11/08/2018
BISMHISSUEDCross Management11/02/2018
BISPLISSUEDMagic Mechanical10/29/2018
BISSDISSUEDAshlar Mechanical10/24/2018
BISOTISSUEDCross Management08/13/2018
BIS—ISSUEDCross Management08/13/2018
BISSDISSUEDHeads Up Fire Sprinkler08/03/2018
BISMHISSUEDCeltic Services NYC05/16/2018
BISOTISSUEDCeltic Services NYC05/16/2018
BISOTISSUEDCross Management05/07/2018
BISSDISSUEDAshlar Mechanical04/04/2018
BISOTISSUEDLawrence Exterior Restoration02/02/2018
BISEQISSUEDSpring Scaffolding01/22/2018
BISEQISSUEDSpring Scaffolding01/18/2018
BISOTISSUEDLawrence Exterior Restoration01/17/2018
BISPLISSUEDMagic Mechanical10/30/2017
BIS—ISSUEDCross Management10/18/2017
BISSDISSUEDHeads Up Fire Sprinkler07/05/2017
BISEQISSUEDCeltic Services NYC05/17/2017
BISMHISSUEDCeltic Services NYC05/05/2017
BISOTISSUEDCeltic Services NYC05/05/2017
BISOTISSUEDLawrence Exterior Restoration04/04/2017
BISOTISSUEDCeltic Services NYC03/30/2017
+ 10 more permits on file
1 project · most recent 12/24/2020
FiledStatusContractorScope
12/24/2020Permit IssuedAccurate Mechanical70 heads
1 project · most recent 12/24/2020
Water/Sanitary
FiledStatusContractorScope
12/24/2020Signed-offAccurate MechanicalWater/Sanitary
3 projects · most recent 12/31/2024
General Wiring
FiledStatusContractorScope
12/31/2024CompleteLimongelli ElectricGeneral Wiring
12/11/2024CompleteLimongelli ElectricGeneral Wiring
10/16/2019CompleteTeam ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
02/20/2025Fail-Final General Construction Non-Directive 14FailView ↗
02/20/2025Pass-Final General Construction Non-Directive 14PassView ↗
02/07/2025Fail-Final General Construction Non-Directive 14FailView ↗
02/03/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/27/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/20/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
02/18/2025Interior lighting powerJUAN GOMEZenergy_progress
02/18/2025Lighting in dwelling unitsJUAN GOMEZenergy_progress
02/18/2025Lighting controlsJUAN GOMEZenergy_progress
02/18/2025FinalJUAN GOMEZprogress
02/14/2025Fire-Resistant Penetrations and JointsJUAN GOMEZspecial
02/14/2025Mechanical SystemsJUAN GOMEZspecial
02/14/2025FinalJUAN GOMEZprogress
02/14/2025Sprinkler SystemsJUAN GOMEZspecial
02/12/2025Sprinkler SystemsJUAN GOMEZspecial
02/12/2025Fire-Resistant Penetrations and JointsJUAN GOMEZspecial
02/10/2025Mechanical SystemsJUAN GOMEZspecial
02/10/2025FinalJUAN GOMEZprogress
02/05/2025FinalJUAN GOMEZprogress
02/05/2025Lighting in dwelling unitsJUAN GOMEZenergy_progress
02/05/2025Interior lighting powerJUAN GOMEZenergy_progress
02/05/2025Lighting controlsJUAN GOMEZenergy_progress
01/30/2025Sprinkler SystemsJUAN GOMEZspecial
01/30/2025Fire-Resistant Penetrations and JointsJUAN GOMEZspecial
12/04/2024HVAC-R and service water piping design and insulationJUAN GOMEZenergy_progress
12/04/2024Energy Code Compliance InspectionsJUAN GOMEZprogress
11/21/2024Fire-Resistant Penetrations and JointsJUAN GOMEZspecial
12/23/2020Fire-Resistance Rated ConstructionFAHAD FATEHprogress
12/16/2020Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
12/16/2020Sprinkler SystemsFAHAD FATEHspecial
07/18/2018FinalJOEL PHAGOOprogress
Latest 25 of 26.
▾Documents — 465 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch13
08/26/2026X00001283-I1Request digital key ↗
08/26/2026X00018974-I1Request digital key ↗
08/26/2026X00062777-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly3
08/20/2026X01161829-I1Request digital key ↗
08/20/2026X01160652-I1Request digital key ↗
08/15/2026X00118614-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
08/25/2026X00441564-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/25/2026X00441564-I1Request digital key ↗
▸Applications & Permits82
▸BISPLAN / WORK APPROVAL APPLICATION42
05/02/2025220602015Open ↗
01/13/2021220582590Open ↗
01/11/2021220582590Open ↗
Showing 3 of 42 on file for this type
▸BISWORK PERMIT APPLICATION37
01/26/2021240276722Open ↗
08/16/2019220582590Open ↗
08/16/2019220671299Open ↗
Showing 3 of 37 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
12/18/2018220582590Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
03/28/2018220616331Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
03/10/2020220575526Open ↗
▸Seals & Professional Certifications131
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION57
03/17/2020220582590Open ↗
03/12/2020220671299Open ↗
03/03/2020220582590Open ↗
Showing 3 of 57 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/26/2026X00001283-I1Open ↗
08/26/2026X00018974-I1Open ↗
08/26/2026X00118614-I1Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST13
11/02/2018220676221Open ↗
10/22/2018220674009Open ↗
04/09/2018220629229Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
10/06/2026X00975931-P3Open ↗
10/06/2026X00975931-S1Open ↗
10/03/2026X00975931-P4Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
10/06/2026X00975931-P3Open ↗
10/06/2026X00975931-S1Open ↗
10/06/2026X00975931-S1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT10
11/02/2018220676221Open ↗
10/22/2018220674009Open ↗
04/09/2018220629229Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
10/09/2020240276722Open ↗
Showing 1 of 3 on file for this type
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/14/2020240276722Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment24
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE14
09/20/2019220582590Open ↗
09/18/2019220582590Open ↗
01/17/2019220625991Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWFDNY: Letter of No Objection3
08/20/2026X00975931-P4Open ↗
08/20/2026X00975931-S2Open ↗
08/15/2026X00975931-P1Open ↗
▸BISEQUIPMENT USE PERMITS2
12/21/2021220582590Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
11/02/2018220676221Open ↗
10/10/2018220671299Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
11/30/2020220637924Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTenant Protection Plan and Notes1
04/09/2018220629229Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos32
▸BISASBESTOS: CERTIFICATION (DEP ACP5)14
09/14/2020240276722Open ↗
11/02/2018220676221Open ↗
10/22/2018220674009Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/26/2026X00018974-I1Open ↗
08/20/2026X00975931-P5Open ↗
08/20/2026X00975931-P4Open ↗
Showing 3 of 13 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance28
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS18
03/12/2020220671299Open ↗
03/02/2020220676221Open ↗
02/14/2020220575526Open ↗
Showing 3 of 18 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
03/12/2020220671299Open ↗
03/02/2020220676221Open ↗
02/14/2020220575526Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
12/23/2020240276722Open ↗
09/14/2020240276722Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/09/2020240276722Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/20/2026X00975931-S3Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY3
12/23/2020240276722Open ↗
09/14/2020240276722Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
01/15/2020220582590Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
01/15/2020220582590Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT: PHOTOLUMINESCENCE1
03/03/2020220582590Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
08/21/2019220576570Open ↗
▸Approvals, Objections & Sign-offs47
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST29
02/01/2021220582590Open ↗
12/04/2020220582590Open ↗
09/09/2020220582590Open ↗
Showing 3 of 29 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
11/15/2018220576570Open ↗
11/15/2018220576570Open ↗
Showing 2 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
01/13/2021220582590Open ↗
01/11/2021220582590Open ↗
03/12/2019220582590Open ↗
Showing 3 of 4 on file for this type
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFINAL1
06/18/2020220597432Open ↗
▸Cost, Insurance & Ownership28
▸BISCOST AFFIDAVIT28
09/14/2020240276722Open ↗
03/12/2020220671299Open ↗
03/02/2020220674009Open ↗
Showing 3 of 28 on file for this type
▸Filing & Intake Forms61
▸BISBOROUGH INTAKE FORM21
03/12/2020220671299Open ↗
03/10/2020220575526Open ↗
03/03/2020220582590Open ↗
Showing 3 of 21 on file for this type
▸BISEFILING COVER SHEET19
11/02/2018220676221Open ↗
10/22/2018220674009Open ↗
10/10/2018220671299Open ↗
Showing 3 of 19 on file for this type
▸BISADDITIONAL INFORMATION19
01/26/2021220582590Open ↗
01/20/2021220582590Open ↗
01/20/2021220582590Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSRO INTAKE FORM(SRO1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
01/20/2021220582590Open ↗