← Back
BRONX
827 DEAN AVENUE
BRONX · BIN 2127303
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
ArchitectureStructuralMechanical
Roof2p · 1 filing · 19 docs
Floor 21p · 1 filing · 19 docs
Floor 11p · 1 filing · 19 docs
Cellar2p · 1 filing · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CLARENCE REALTY1009/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GINO O. LONGO, ARCHITECT605/14/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CIBOR CONSTRUCTION INCGeneral Contractor204/09/2026
FALCON CONSTRUCTION & DEVELOPGeneral Contractor107/08/2026
Building Lifecycle
All (59)Filed (6)Permit Issued (3)Objection (20)Special Inspection (30)
06/03/2026
Permit issued — Construction Fence
X01278970-I1-FN
06/01/2026
Objection raised — Other
06/01/2026
Objection raised — Other
05/14/2026
Filed — New Building
X01236733-S2
05/13/2026
Filed — New Building
X01236733-S3
05/05/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
05/04/2026
Special inspection requirement — Metering
05/04/2026
Special inspection requirement — Maintenance information
05/04/2026
Special inspection requirement — HVAC-R and service water heating equipment
05/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
05/04/2026
Special inspection requirement — HVAC-R and service water heating system controls
05/04/2026
Special inspection requirement — Energy Code Compliance Inspections
05/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/04/2026
Special inspection requirement — Permanent certificate
04/17/2026
Special inspection requirement — Metering
04/17/2026
Special inspection requirement — Interior lighting power
04/17/2026
Special inspection requirement — Maintenance information
04/17/2026
Special inspection requirement — Electric vehicle service equipment requirements
03/30/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
02/25/2026
Special inspection requirement — Fenestration air leakage
02/25/2026
Special inspection requirement — Air barrier — testing
02/25/2026
Special inspection requirement — HVAC-R and service water heating system controls
02/25/2026
Special inspection requirement — Air barrier - visual inspection
02/25/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
02/25/2026
Special inspection requirement — Insulation placement and R values
02/25/2026
Special inspection requirement — Ventilation and air distribution system
02/25/2026
Special inspection requirement — Fenestration areas
02/25/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
02/25/2026
Special inspection requirement — HVAC-R and service water heating equipment
02/25/2026
Special inspection requirement — Permanent certificate
10/23/2025
Permit issued — Construction Fence
X01278970-I1-FN
09/23/2025
Filed — New Building
X01236733-I1
09/03/2025
Permit issued — Construction Fence
X01278970-I1-FN
08/28/2025
Filed — Alteration
APPLICATION HEREWTIH FILED FOR A TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH X01236733-I1. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
X01278970-I1
08/06/2025
Special inspection requirement — Masonry
08/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/06/2025
Special inspection requirement — Concrete - Cast-In-Place
08/06/2025
Special inspection requirement — Structural Steel - Details
08/06/2025
Special inspection requirement — Structural Wood Frame
11/22/2024
Objection resolved — Addressed
11/22/2024
Objection resolved — Addressed
09/18/2024
Objection raised — Other
09/17/2024
Objection resolved — Addressed
09/17/2024
Objection resolved — Addressed
09/17/2024
Objection resolved — Addressed
09/17/2024
Objection resolved — Addressed
08/20/2024
Objection resolved — Addressed
08/20/2024
Objection resolved — Addressed
08/20/2024
Objection resolved — Addressed
08/13/2024
Objection raised — Other
08/09/2024
Objection raised — Cost
08/09/2024
Objection raised — Scope
08/09/2024
Objection raised — Inspections
08/08/2024
Objection raised — Zoning
08/08/2024
Objection raised — Zoning
08/08/2024
Objection raised — Zoning
08/08/2024
Objection raised — Zoning
08/02/2024
Filed — Alteration CO
APPLICATION HEREWITH FILED FOR NOW 10'-0" WIDE CURBN CIUT IN CONJUNCTION WITH APPLICATION X01058559-I1. NO CHANGE IN OCCUPANCY, USE, EGRESS OR BULK.
X01058559-I1
08/02/2024
Filed — Alteration CO
APPLICATION HEREWITH FILED FOR NOW 10'-0" WIDE CURBN CIUT IN CONJUNCTION WITH APPLICATION X01058559-I1. NO CHANGE IN OCCUPANCY, USE, EGRESS OR BULK.
X01058559-S1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedFALCON CONSTRUCTION & DEVELOP06/03/2026
DOB NOWConstruction FencePermit IssuedCIBOR CONSTRUCTION INC10/23/2025
DOB NOWConstruction FencePermit IssuedCIBOR CONSTRUCTION INC09/03/2025
1 project · most recent 08/28/2025
Fence
FiledStatusContractorScope
08/28/2025Permit IssuedFALCON CONSTRUCTION & DEVFence
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
05/05/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities—special
05/04/2026Metering—energy_progress
05/04/2026Maintenance information—energy_progress
05/04/2026HVAC-R and service water heating equipment—energy_progress
05/04/2026HVAC-R and service water piping design and insulation—energy_progress
05/04/2026HVAC-R and service water heating system controls—energy_progress
05/04/2026Energy Code Compliance Inspections—progress
05/04/2026Fire-Resistant Penetrations and Joints—special
05/04/2026Permanent certificate—energy_progress
04/17/2026Metering—energy_progress
04/17/2026Interior lighting power—energy_progress
04/17/2026Maintenance information—energy_progress
04/17/2026Electric vehicle service equipment requirements—energy_progress
03/30/2026Subsurface Investigations (Borings/Test Pits)—special
02/25/2026Fenestration air leakage—energy_progress
02/25/2026Air barrier — testing —energy_progress
02/25/2026HVAC-R and service water heating system controls—energy_progress
02/25/2026Air barrier - visual inspection—energy_progress
02/25/2026HVAC-R and service water piping design and insulation—energy_progress
02/25/2026Insulation placement and R values—energy_progress
02/25/2026Ventilation and air distribution system—energy_progress
02/25/2026Fenestration areas—energy_progress
02/25/2026Fenestration and door U-factor and product ratings—energy_progress
02/25/2026HVAC-R and service water heating equipment—energy_progress
02/25/2026Permanent certificate—energy_progress
Latest 25 of 37.
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/18/2026X01278970-I1Request digital key ↗
08/16/2026X01236733-I1Request digital key ↗
08/16/2026X01236733-S1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026X01058559-I1Open ↗
08/13/2026X01236733-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026X01236733-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026X01236733-I1Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/21/2026X01058559-S1Open ↗
08/21/2026X01058559-I1Open ↗
08/16/2026X01236733-S2Open ↗
Showing 3 of 7 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026X01236733-I1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Trees Site Plan2
08/13/2026X01236733-I1Open ↗
08/13/2026X01058559-I1Open ↗
▸DOB NOWStreet Tree Checklist2
08/16/2026X01236733-I1Open ↗
08/14/2026X01058559-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X01236733-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT1
08/16/2026X01236733-I1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026X01236733-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/16/2026X01236733-I1Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification2
08/16/2026X01236733-I1Open ↗
08/14/2026X01058559-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026X01236733-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026X01236733-I1Open ↗