← Back
Elevator apt, fireproof without stores
827 STERLING PLACE
BROOKLYN · BIN 3427446
💬 Discuss this project
2024Year Built
7Stories
D3Building Class
R6AZoning
61,433 sfGross Floor Area
76Units
LL97 CoveredRent Stabilized0 Open ViolationsFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: 827 STERLING OWNER LLC · 17,891 sf lot · 3.43 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof3p · 2 filings · 19 docs
Floor 61p · 1 filing · 3 docs
Floor 51p · 1 filing · 3 docs
Floor 41p · 1 filing · 3 docs
Floor 3154p · 1 filing · 20 docs
Floor 2156p · 2 filings · 20 docs
Floor 1156p · 3 filings · 20 docs
Cellar154p · 2 filings · 20 docs
1 job · most recent 12/23/2025
Air Conditioning Systems Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/23/2025Signed-offPRESS BUILDERS INCAir Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems
Cooling
Samsung AC018BXSCCC/AA Vrf Indoor ×2
Heat / Cool
Amana HEH153H50 13,800 BTU · Heat Pump Outdoor ×77
HEH073H50 6,800 BTU · Electric Heater ×64
HEH123H50 11,600 BTU · Electric Heater ×18
Samsung AM012BN4PCH/AA 13,500 BTU · Vrf Indoor ×15
AM048TXMDCH/AA 54,000 BTU · Vrf Outdoor ×6
AM036TXMDCH/AA 42,000 BTU · Vrf Outdoor ×3
AM048ANHDCH/AA 54,000 BTU · Vrf Indoor ×3
AC018BNADCH/AA 614 CFM · Vrf Indoor ×2
AM006BN4PCH/AA 7,100 BTU · Vrf Indoor ×1
AM036ANHDCH/AA 40,000 BTU · Vrf Indoor ×1
Ventilation
Greenheck G-095-VG 470 CFM · Exhaust Fan ×13
G-099-VG 720 CFM · Exhaust Fan ×5
G-097-VG 180 CFM · Exhaust Fan ×2
QEID-22-65 8,700 CFM · Exhaust Fan ×1
SQ-70-VG 100 CFM · Exhaust Fan ×1
SQ-80-VG 210 CFM · Exhaust Fan ×1
Renewaire HE07-JINH 300 CFM · Erv ×1
HE10-JRTH 640 CFM · Erv ×1
1 job · most recent 12/23/2025
Storm Water/Sanitary
FiledStatusContractorScope
12/23/2025Signed-offHEADQUARTERS MECH INCStorm, Water/Sanitary
3 jobs · most recent 04/10/2025
General Wiring
FiledStatusContractorScope
04/10/2025CompleteNET POWER ELECTRIC CORPGeneral Wiring
12/02/2024CompleteNET POWER ELECTRIC CORP—
03/18/2024CompleteTUXEDO ELEC'L CONTR'G INC—
Building Lifecycle
All (174)Filed (43)Permit Issued (42)Signed Off (25)Violation (9)Inspection (17)Objection (8)Special Inspection (30)
02/13/2026
Signed off — New Building
Plumbing work as per plans filed herewith. Filed in conjunction with NB: B00702705-I1
B00702705-I1
02/05/2026
Special inspection requirement — Fenestration areas
JOHN MCMONAGLE
02/05/2026
Special inspection requirement — Fenestration air leakage
JOHN MCMONAGLE
02/05/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JOHN MCMONAGLE
02/05/2026
Special inspection requirement — Masonry
JOHN MCMONAGLE
02/05/2026
Special inspection requirement — Electrical motors and elevators
JOHN MCMONAGLE
02/05/2026
Special inspection requirement — Vestibules
JOHN MCMONAGLE
02/05/2026
Special inspection requirement — Lighting controls
JOHN MCMONAGLE
02/05/2026
Special inspection requirement — Lighting in dwelling units
JOHN MCMONAGLE
02/05/2026
Special inspection requirement — Exterior lighting power
JOHN MCMONAGLE
02/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
02/05/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
JOHN MCMONAGLE
02/05/2026
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
02/05/2026
Special inspection requirement — Air barrier continuity plan testing
JOHN MCMONAGLE
02/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
JOHN MCMONAGLE
02/05/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
JOHN MCMONAGLE
02/05/2026
Special inspection requirement — Metering
JOHN MCMONAGLE
02/05/2026
Special inspection requirement — Air barrier - visual inspection
JOHN MCMONAGLE
02/05/2026
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
02/05/2026
Special inspection requirement — Insulation placement and R values
JOHN MCMONAGLE
02/05/2026
Special inspection requirement — Interior lighting power
JOHN MCMONAGLE
12/23/2025
Filed — New Building
Plumbing work as per plans filed herewith. Filed in conjunction with NB: B00702705-I1
B00702705-B5
12/17/2025
Special inspection requirement — Fire-Resistance Rated Construction
JOHN MCMONAGLE
12/17/2025
Special inspection requirement — Vestibules
JOHN MCMONAGLE
12/17/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
JOHN MCMONAGLE
12/17/2025
Special inspection requirement — Masonry
JOHN MCMONAGLE
12/17/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
JOHN MCMONAGLE
12/17/2025
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
12/17/2025
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
12/17/2025
Special inspection requirement — Exterior lighting power
JOHN MCMONAGLE
12/17/2025
Special inspection requirement — Fenestration areas
JOHN MCMONAGLE
12/17/2025
Special inspection requirement — Electrical motors and elevators
JOHN MCMONAGLE
11/24/2025
Signed off — New Building
Plumbing work as per plans filed herewith. Filed in conjunction with NB: B00702705-I1
B00702705-S3
11/19/2025
Signed off — Alteration
Install temporary dry standpipe system during construction as per plans filed. Filed in conjunction with NB #B00702705-I1
B00717433-I1
11/14/2025
Violation issued (HPD, closed)
C
11/14/2025
Violation issued (HPD, closed)
C
11/06/2025
Signed off — New Building
Plumbing work as per plans filed herewith. Filed in conjunction with NB: B00702705-I1
B00702705-S4
09/18/2025
Signed off — New Building
Plumbing work as per plans filed herewith. Filed in conjunction with NB: B00702705-I1
B00702705-S6
09/15/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
07/10/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
07/02/2025
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00974326-I1
06/18/2025
Filed — New Building
Plumbing work as per plans filed herewith. Filed in conjunction with NB: B00702705-I1
B00702705-B2
05/22/2025
Signed off — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
B01149478-I1
05/21/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01031597-I1
05/09/2025
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00974326-S1
05/09/2025
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00974326-S4
04/23/2025
Signed off — New Building
Plumbing work as per plans filed herewith. Filed in conjunction with NB: B00702705-I1
B00702705-S2
03/19/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/17/2025
Signed off — Alteration
TEMPORARY SUSPENDED SCAFFOLD AS PER DRAWINGS DURING NB CONST, FILED SEP. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01068816-I1
03/12/2025
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
03/12/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/11/2025
Signed off — Alteration
TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS DURING NB CONST, FILED SEP. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01068806-I1
03/11/2025
Signed off — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01068797-I1
03/07/2025
Filed — New Building
Plumbing work as per plans filed herewith. Filed in conjunction with NB: B00702705-I1
B00702705-A9
03/07/2025
Filed — New Building
Plumbing work as per plans filed herewith. Filed in conjunction with NB: B00702705-I1
B00702705-A3
02/27/2025
Permit issued — Curb Cut
B00702705-S6-CC
02/25/2025
Permit issued — Solar
B01149478-I1-SL
02/21/2025
Permit issued — Protection and Mechanical Methods
B00974326-S4-PMM
02/19/2025
Permit issued — Sidewalk Shed
B00974326-S1-SH
02/14/2025
Filed — New Building
Plumbing work as per plans filed herewith. Filed in conjunction with NB: B00702705-I1
B00702705-A6
Latest 60 of 174 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KRISS CAPITAL7007/08/2026
HAUSSMANN DEVELOPMENT7107/08/2026
827 STERLING OWNER LLC403/22/2026
PRESS BUILDERS503/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.1803/21/2026
A1 EXPEDITING SERVICE CORP.503/21/2026
SYNERGY BUILDING CONSULTANTS403/21/2026
ARC DESIGN AND CONSULTING LLC203/21/2026
AE DESIGN SOLUTION403/21/2026
A1 EXPEDITING SERVICE2403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRESS BUILDERS INCGeneral Contractor2207/08/2026
ROCKLEDGE SCAFFOLD CORPGeneral Contractor1107/08/2026
MC SUPERSTRUCTURE INCGeneral Contractor707/08/2026
AMS CONSTRUCTION CORPGeneral Contractor603/21/2026
WNW & SONS PLUMBING & HTGFire Protection407/08/2026
HEADQUARTERS MECH INCPlumbing307/08/2026
PARK CONSTRUCTION CORPGeneral Contractor307/08/2026
S&E BRIDGE & SCAFFOLD LLC.General Contractor307/08/2026
ALBA SERVICES INCGeneral Contractor203/21/2026
SNG BRICK AND STONE INCGeneral Contractor203/21/2026
TUXEDO ELEC'L CONTR'G INCElectrical103/22/2026
ISSAC STERN ARCHITECTSGeneral Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOMANI INSPECTION SERVICE8431812/23/2025
JAMES A CLANCY9176112/10/2024
G. BLINN CONSULTING, LLC2894207/09/2024
REGIONAL TESTING CORP.394104/05/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offPRESS BUILDERS INC02/27/2025
DOB NOWSolarSigned-offAMS CONSTRUCTION CORP02/25/2025
DOB NOWProtection and Mechanical MethodsSigned-offROCKLEDGE SCAFFOLD CORP02/21/2025
DOB NOWSidewalk ShedSigned-offROCKLEDGE SCAFFOLD CORP02/19/2025
DOB NOWStandpipeSigned-offWNW & SONS PLUMBING & HTG01/03/2025
DOB NOWPlumbingSigned-offHEADQUARTERS MECH INC01/03/2025
DOB NOWSprinklersSigned-offWNW & SONS PLUMBING & HTG01/03/2025
DOB NOWMechanical SystemsSigned-offPRESS BUILDERS INC12/17/2024
DOB NOWSolarSigned-offAMS CONSTRUCTION CORP12/17/2024
DOB NOWConstruction FenceSigned-offROCKLEDGE SCAFFOLD CORP12/09/2024
DOB NOWGeneral ConstructionPermit IssuedPRESS BUILDERS INC09/26/2024
DOB NOWSupported ScaffoldSigned-offS&E BRIDGE & SCAFFOLD LLC06/21/2024
DOB NOWSuspended ScaffoldSigned-offS&E BRIDGE & SCAFFOLD LLC06/21/2024
DOB NOWProtection and Mechanical MethodsSigned-offS&E BRIDGE & SCAFFOLD LLC06/20/2024
DOB NOWSupported ScaffoldSigned-offSNG BRICK AND STONE INC04/26/2024
DOB NOWProtection and Mechanical MethodsSigned-offROCKLEDGE SCAFFOLD CORP03/04/2024
DOB NOWProtection and Mechanical MethodsSigned-offROCKLEDGE SCAFFOLD CORP02/26/2024
DOB NOWSidewalk ShedSigned-offROCKLEDGE SCAFFOLD CORP02/23/2024
DOB NOWStandpipeSigned-offHEADQUARTERS MECH INC02/08/2024
DOB NOWGeneral ConstructionPermit IssuedPRESS BUILDERS INC02/02/2024
DOB NOWStructuralSigned-offPRESS BUILDERS INC01/08/2024
DOB NOWFoundationSigned-offPRESS BUILDERS INC01/08/2024
DOB NOWSupport of ExcavationSigned-offPRESS BUILDERS INC01/05/2024
DOB NOWSprinklersSigned-offWNW & SONS PLUMBING & HTG01/05/2024
DOB NOWStandpipeSigned-offWNW & SONS PLUMBING & HTG01/05/2024
DOB NOWGeneral ConstructionPermit IssuedPRESS BUILDERS INC01/05/2024
DOB NOWGeneral ConstructionPermit IssuedPRESS BUILDERS INC01/04/2024
DOB NOWMechanical SystemsSigned-offPRESS BUILDERS INC01/03/2024
DOB NOWFoundationSigned-offPRESS BUILDERS INC01/03/2024
DOB NOWSupport of ExcavationSigned-offPRESS BUILDERS INC01/03/2024
DOB NOWPlumbingSigned-offHEADQUARTERS MECH INC01/03/2024
DOB NOWStructuralSigned-offPRESS BUILDERS INC01/03/2024
DOB NOWConstruction FenceSigned-offROCKLEDGE SCAFFOLD CORP12/12/2023
DOB NOWEarth WorkSigned-offPRESS BUILDERS INC10/02/2023
DOB NOWGeneral ConstructionSigned-offPRESS BUILDERS INC10/02/2023
DOB NOWProtection and Mechanical MethodsSigned-offMC SUPERSTRUCTURE INC09/14/2023
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC09/13/2023
DOB NOWProtection and Mechanical MethodsSigned-offMC SUPERSTRUCTURE INC09/13/2023
DOB NOWSidewalk ShedSigned-offMC SUPERSTRUCTURE INC09/13/2023
DOB NOWConstruction FenceSigned-offALBA SERVICES INC08/22/2023
+ 2 more permits on file
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
09/15/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
07/10/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
03/19/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/12/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
03/12/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/13/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/05/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
02/05/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
01/31/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/29/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
01/17/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
01/17/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
07/12/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/15/2024Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
05/15/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
02/08/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 136
DateRequirementInspectorRole
02/05/2026Air barrier continuity plan testingJOHN MCMONAGLEenergy_progress
02/05/2026Fenestration areasJOHN MCMONAGLEenergy_progress
02/05/2026Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
02/05/2026Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
02/05/2026Wall Panels, Curtain Walls, and VeneersJOHN MCMONAGLEspecial
02/05/2026Exterior lighting powerJOHN MCMONAGLEenergy_progress
02/05/2026Fenestration air leakageJOHN MCMONAGLEenergy_progress
02/05/2026VestibulesJOHN MCMONAGLEenergy_progress
02/05/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
02/05/2026MasonryJOHN MCMONAGLEspecial
02/05/2026Exterior Insulation and Finish Systems (EIFS)JOHN MCMONAGLEspecial
02/05/2026Interior lighting powerJOHN MCMONAGLEenergy_progress
02/05/2026Insulation placement and R valuesJOHN MCMONAGLEenergy_progress
02/05/2026Fenestration and door U-factor and product ratingsJOHN MCMONAGLEenergy_progress
02/05/2026Lighting in dwelling unitsJOHN MCMONAGLEenergy_progress
02/05/2026Maintenance informationJOHN MCMONAGLEenergy_progress
02/05/2026Air barrier - visual inspectionJOHN MCMONAGLEenergy_progress
02/05/2026Lighting controlsJOHN MCMONAGLEenergy_progress
02/05/2026MeteringJOHN MCMONAGLEenergy_progress
02/05/2026Electrical motors and elevatorsJOHN MCMONAGLEenergy_progress
12/17/2025Fenestration areasJOHN MCMONAGLEenergy_progress
12/17/2025Lighting in dwelling unitsJOHN MCMONAGLEenergy_progress
12/17/2025Lighting controlsJOHN MCMONAGLEenergy_progress
12/17/2025Fenestration air leakageJOHN MCMONAGLEenergy_progress
12/17/2025MeteringJOHN MCMONAGLEenergy_progress
Latest 25 of 136.
▾Documents — 193 on file (BIS + DOB NOW)
▸Plans & Drawings43
▸DOB NOWPlans/Sketch43
08/30/2026B00705730-I1Request digital key ↗
08/30/2026B00705730-S1Request digital key ↗
08/27/2026B00916142-I1Request digital key ↗
Showing 3 of 43 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION4
10/31/2025340864050Open ↗
10/29/2025340864050Open ↗
11/15/2023340864050Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
12/07/2022340864050Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026B00702705-P1Open ↗
08/13/2026B00702705-I1Open ↗
08/13/2026B00702705-B2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/13/2026B00702705-P1Open ↗
08/13/2026B00702705-I1Open ↗
08/13/2026B00702705-B5Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00702705-I1Open ↗
▸Seals & Professional Certifications89
▸DOB NOWDPL-1: Design Professional Seal & Signature43
08/30/2026B00705730-S1Open ↗
08/30/2026B00705730-I1Open ↗
08/29/2026B00717433-I1Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWProgress Inspector Seal & Signature22
09/23/2026B01149478-I1Open ↗
09/01/2026B00702705-B5Open ↗
09/01/2026B01149478-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
09/23/2026B00717433-I1Open ↗
09/23/2026B01149478-I1Open ↗
09/02/2026B00702705-S4Open ↗
Showing 3 of 22 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
08/30/2022340864050Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/12/2022340864050Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/13/2026B00702705-B2Open ↗
08/13/2026B00702705-I1Open ↗
08/13/2026B00702705-P1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection12
▸DOB NOWStreet Tree Checklist5
08/23/2026B00702705-P1Open ↗
08/23/2026B00702705-B5Open ↗
08/23/2026B00702705-B2Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
12/07/2022340864050Open ↗
▸BISBPP: STREET TREES SITE PLAN1
12/07/2022340864050Open ↗
▸BISSTREET TREE CHECKLIST1
12/07/2022340864050Open ↗
▸BISSTREET TREE SIGNOFF1
10/30/2025340864050Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00702705-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00702705-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00702705-I1Open ↗
▸Energy Compliance3
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026B00702705-S3Open ↗
08/13/2026B00702705-S2Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00702705-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01149478-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
08/30/2022340864050Open ↗
▸Other Documents23
▸DOB NOWSite Survey: Initial5
08/13/2026B00702705-B2Open ↗
08/13/2026B00702705-I1Open ↗
08/13/2026B00702705-B5Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026B00702705-B5Open ↗
08/13/2026B00702705-I1Open ↗
08/13/2026B00702705-A6Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/23/2026B00702705-A6Open ↗
08/23/2026B00702705-B5Open ↗
08/23/2026B00702705-B2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWManufacturer's Specifications2
08/13/2026B01068816-I1Open ↗
08/13/2026B01068816-P1Open ↗
▸DOB NOWCalculations2
08/13/2026B01068816-P1Open ↗
08/13/2026B01068816-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026B00705730-I1Open ↗
08/13/2026B00702705-S7Open ↗
▸BISBPP-PARKS: PLANT NEW TREE1
12/07/2022340864050Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00702705-I1Open ↗