← Back
Two family brick
828 49 STREET
BROOKLYN · BIN 3137528
💬 Discuss this project
1910Year Built
2Stories
B1Building Class
R6Zoning
2,284 sfGross Floor Area
2Units
Two family brick · 2,003 sf lot · 1.14 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JABBIE ENGINEERING104/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/08/2026$1.8M—— → —$793/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JX FLAME SOLUTION INC504/14/2026
RIGID STRUCTURAL DESIGN, LLC103/23/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
VIBEN BUILDING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JABBIE INDUSTRIES INCORP*General Contractor304/09/2026
CATMAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JX FLAME SOLUTION INC7286404/14/2026
Building Lifecycle
All (40)Filed (6)Permit Issued (4)Signed Off (3)Inspection (3)Objection (2)Special Inspection (22)
07/20/2026
Signed off — Alteration
REPAIR EXISTING BRICK STAIRS AT OPEN SPACE ONLY. NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01350583-I1
07/09/2026
Signed off — Alteration
INSTALL NEW PLUMBING FIXTURES AT CELLAR 1ST 2ND FLOOR. GENERAL CONSTRUCTION WORK WAS FILED UNDER DOBNOW JOB#B01349246-I1.
B01349246-S1
06/30/2026
Signed off — Alteration
INSTALL NEW PLUMBING FIXTURES AT CELLAR 1ST 2ND FLOOR. GENERAL CONSTRUCTION WORK WAS FILED UNDER DOBNOW JOB#B01349246-I1.
B01349246-I1
05/04/2026
Special inspection requirement — Energy Code Compliance Inspections
JIE ZHU
05/04/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JIE ZHU
05/04/2026
Special inspection requirement — Fenestration areas
JIE ZHU
05/04/2026
Special inspection requirement — Interior lighting power
JIE ZHU
05/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIE ZHU
05/04/2026
Special inspection requirement — Fire-Resistance Rated Construction
JIE ZHU
04/14/2026
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES AT CELLAR 1ST 2ND FLOOR. GENERAL CONSTRUCTION WORK WAS FILED UNDER DOBNOW JOB#B01349246-I1.
B01349246-P2
04/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIE ZHU
04/14/2026
Special inspection requirement — Fire-Resistance Rated Construction
JIE ZHU
04/14/2026
Special inspection requirement — Interior lighting power
JIE ZHU
04/14/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JIE ZHU
04/14/2026
Special inspection requirement — Fenestration areas
JIE ZHU
04/14/2026
Special inspection requirement — Energy Code Compliance Inspections
JIE ZHU
04/02/2026
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES AT CELLAR 1ST 2ND FLOOR. GENERAL CONSTRUCTION WORK WAS FILED UNDER DOBNOW JOB#B01349246-I1.
B01349246-P1
04/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIE ZHU
04/02/2026
Special inspection requirement — Energy Code Compliance Inspections
JIE ZHU
04/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
JIE ZHU
04/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
JIE ZHU
04/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JIE ZHU
04/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIE ZHU
04/02/2026
Special inspection requirement — Energy Code Compliance Inspections
JIE ZHU
04/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JIE ZHU
04/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
JIE ZHU
04/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
JIE ZHU
04/01/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/01/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/27/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/24/2026
Permit issued — Sidewalk Shed
B01372503-I1-SH
03/23/2026
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01372503-I1
03/06/2026
Permit issued — Plumbing
B01349246-S1-PL
03/03/2026
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES AT CELLAR 1ST 2ND FLOOR. GENERAL CONSTRUCTION WORK WAS FILED UNDER DOBNOW JOB#B01349246-I1.
B01349246-S1
02/25/2026
Permit issued — General Construction
B01349246-I1-GC
02/14/2026
Objection resolved — Addressed
02/09/2026
Objection raised — Other
01/28/2026
Permit issued — General Construction
B01350583-I1-GC
01/26/2026
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES AT CELLAR 1ST 2ND FLOOR. GENERAL CONSTRUCTION WORK WAS FILED UNDER DOBNOW JOB#B01349246-I1.
B01349246-I1
01/23/2026
Filed — Alteration
REPAIR EXISTING BRICK STAIRS AT OPEN SPACE ONLY. NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01350583-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedJABBIE INDUSTRIES INCORP*03/24/2026
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC03/06/2026
DOB NOWGeneral ConstructionSigned-offJABBIE INDUSTRIES INCORP*02/25/2026
DOB NOWGeneral ConstructionSigned-offJABBIE INDUSTRIES INCORP*01/28/2026
1 project · most recent 04/14/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/14/2026Signed-offCATMAN PLUMBING INCGas, Storm, Water/Sanitary
1 project · most recent 03/20/2026
FiledStatusContractorScope
03/20/2026Permit IssuedNASH ELECTRIC SERVICES IN—
1 project · most recent 03/23/2026
Sidewalk Shed
FiledStatusContractorScope
03/23/2026Permit IssuedJABBIE INDUSTRIES INCORP*Sidewalk Shed
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/01/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/01/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/27/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
05/04/2026Energy Code Compliance InspectionsJIE ZHUprogress
05/04/2026Fenestration and door U-factor and product ratingsJIE ZHUenergy_progress
05/04/2026Fenestration areasJIE ZHUenergy_progress
05/04/2026Interior lighting powerJIE ZHUenergy_progress
05/04/2026Fire-Resistant Penetrations and JointsJIE ZHUspecial
05/04/2026Fire-Resistance Rated ConstructionJIE ZHUprogress
04/14/2026Fire-Resistant Penetrations and JointsJIE ZHUspecial
04/14/2026Fire-Resistance Rated ConstructionJIE ZHUprogress
04/14/2026Interior lighting powerJIE ZHUenergy_progress
04/14/2026Fenestration and door U-factor and product ratingsJIE ZHUenergy_progress
04/14/2026Fenestration areasJIE ZHUenergy_progress
04/14/2026Energy Code Compliance InspectionsJIE ZHUprogress
04/02/2026Fire-Resistant Penetrations and JointsJIE ZHUspecial
04/02/2026Energy Code Compliance InspectionsJIE ZHUprogress
04/02/2026HVAC-R and service water heating system controlsJIE ZHUenergy_progress
04/02/2026HVAC-R and service water heating equipmentJIE ZHUenergy_progress
04/02/2026HVAC-R and service water piping design and insulationJIE ZHUenergy_progress
04/02/2026Fire-Resistant Penetrations and JointsJIE ZHUspecial
04/02/2026Energy Code Compliance InspectionsJIE ZHUprogress
04/02/2026HVAC-R and service water piping design and insulationJIE ZHUenergy_progress
04/02/2026HVAC-R and service water heating equipmentJIE ZHUenergy_progress
04/02/2026HVAC-R and service water heating system controlsJIE ZHUenergy_progress
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/03/2026B01372503-I1Request digital key ↗
08/18/2026B01350583-I1Request digital key ↗
08/17/2026B01349246-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature8
08/26/2026B01349246-P2Open ↗
08/26/2026B01349246-P2Open ↗
08/26/2026B01349246-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/03/2026B01372503-I1Open ↗
08/17/2026B01349246-S1Open ↗
08/17/2026B01349246-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/26/2026B01349246-P2Open ↗
08/26/2026B01349246-P1Open ↗
08/24/2026B01349246-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/17/2026B01349246-P2Open ↗
08/17/2026B01349246-S1Open ↗
08/17/2026B01349246-P1Open ↗
Showing 3 of 4 on file for this type