Primarily 2 family with 1 store or office
828 FLATBUSH AVENUE
BROOKLYN · Flatbush · BIN 3116569
💬 Discuss this project
1910Year Built
3Stories
S2Building Class
R7AZoning
4,700 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: 828 FLATBUSH LLC · 2,100 sf lot · 2.24 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 19p · 2 filings · 19 docs
Cellar3p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Y&T HOLDING LLC703/22/2026
OWNER OF 828 FLATBUSH AVE103/22/2026
XD DEV GROUP603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KORMAN DESIGN & BUILD203/29/2023
TL ENGINEERING, PC503/02/2023
ALBERTO ROMAN606/14/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XPDITE GROUP LLC (104)1203/21/2026
KENNY LEE ARCHITECT203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
URBAN GC INCGeneral Contractor1203/21/2026
KORMAN DESIGN & BUILDGeneral Contractor203/21/2026
NYC CONSTRUCTION INCGeneral Contractor207/08/2026
BT'S PLUMBING AND HEATINGPlumbing107/08/2026
PLUMBING & HTG DOCTOR INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TL ENGINEERING, PC1222203/02/2023
KORMAN DESIGN & BUILD8792103/01/2023
ESNYC CONSULTING INC4099606/14/2022
Building Lifecycle
All (118)Filed (13)Permit Issued (8)Signed Off (6)Violation (23)Inspection (8)Objection (30)Special Inspection (30)
04/23/2024
Signed off — Alteration
INSTALLATION OF AN AWNING WITH BUSINESS NAME ON STOREFRONT AT FIRST FLOOR LEVEL. NO DISTURBING EXTERIOR WALL AND NO EXTERIOR LIGHTING WORK.
B00830206-I1
05/05/2023
Permit issued — General Construction
B00830206-I1-GC
03/29/2023
Filed — Alteration
INSTALLATION OF AN AWNING WITH BUSINESS NAME ON STOREFRONT AT FIRST FLOOR LEVEL. NO DISTURBING EXTERIOR WALL AND NO EXTERIOR LIGHTING WORK.
B00830206-S1
03/23/2023
Signed off — Alteration
INTERIOR RENOVATION WITH MECHANICAL WORK FOR NAIL SALON ON FIRST FLOOR AT EXISTING 3-STORY MIXED USE BUILDING. NO CHANGE IN USE, OCCUPANCY, EGRESS AND STRUCTURE UNDER THIS APPLICATION.
B00795231-I1
03/23/2023
Special inspection requirement — Final
DAVID UH
03/22/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/15/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/02/2023
Filed — Alteration
INTERIOR RENOVATION WITH MECHANICAL WORK FOR NAIL SALON ON FIRST FLOOR AT EXISTING 3-STORY MIXED USE BUILDING. NO CHANGE IN USE, OCCUPANCY, EGRESS AND STRUCTURE UNDER THIS APPLICATION.
B00795231-P1
03/02/2023
Objection raised — Admin
03/02/2023
Objection resolved — Addressed
03/02/2023
Objection raised — Admin
03/02/2023
Objection resolved — Addressed
03/02/2023
Objection raised — Admin
03/02/2023
Objection resolved — Addressed
03/02/2023
Objection raised — Admin
03/02/2023
Objection resolved — Addressed
03/02/2023
Objection raised — Admin
03/02/2023
Objection resolved — Addressed
03/01/2023
Filed — Alteration
INSTALLATION OF AN AWNING WITH BUSINESS NAME ON STOREFRONT AT FIRST FLOOR LEVEL. NO DISTURBING EXTERIOR WALL AND NO EXTERIOR LIGHTING WORK.
B00830206-I1
03/01/2023
Special inspection requirement — Tenant Protection Plan Compliance
KENNY LEE
02/15/2023
Special inspection requirement — Final
DAVID UH
01/23/2023
Signed off — Alteration
PLUMBING WORK FOR NAIL SALON ON FIRST FLOOR AT EXISTING 3-STORY MIXED USE BUILDING. NO CHANGE IN USE, OCCUPANCY, EGRESS AND STRUCTURE UNDER THIS APPLICATION.
B00795311-I1
01/13/2023
Filed — Alteration
PLUMBING WORK FOR NAIL SALON ON FIRST FLOOR AT EXISTING 3-STORY MIXED USE BUILDING. NO CHANGE IN USE, OCCUPANCY, EGRESS AND STRUCTURE UNDER THIS APPLICATION.
B00795311-P2
12/21/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/10/2022
Permit issued — Mechanical Systems
B00795231-I1-MS
11/10/2022
Permit issued — Mechanical Systems
B00795231-I1-GC
11/03/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/03/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/17/2022
Filed — Alteration
PLUMBING WORK FOR NAIL SALON ON FIRST FLOOR AT EXISTING 3-STORY MIXED USE BUILDING. NO CHANGE IN USE, OCCUPANCY, EGRESS AND STRUCTURE UNDER THIS APPLICATION.
B00795311-P1
10/10/2022
Special inspection requirement — Mechanical Systems
10/10/2022
Special inspection requirement — Duct leakage testing, insulation and design
10/10/2022
Special inspection requirement — Final
09/23/2022
Permit issued — Plumbing
B00795311-I1-PL
09/12/2022
Permit issued — General Construction
B00795231-I1-MS
09/06/2022
Filed — Alteration
PLUMBING WORK FOR NAIL SALON ON FIRST FLOOR AT EXISTING 3-STORY MIXED USE BUILDING. NO CHANGE IN USE, OCCUPANCY, EGRESS AND STRUCTURE UNDER THIS APPLICATION.
B00795311-I1
08/29/2022
Objection raised — Accessibility
08/29/2022
Objection resolved — Addressed
08/29/2022
Objection raised — Scope
08/29/2022
Objection resolved — Addressed
08/29/2022
Objection raised — Accessibility
08/29/2022
Objection resolved — Addressed
08/24/2022
Filed — Alteration
INTERIOR RENOVATION WITH MECHANICAL WORK FOR NAIL SALON ON FIRST FLOOR AT EXISTING 3-STORY MIXED USE BUILDING. NO CHANGE IN USE, OCCUPANCY, EGRESS AND STRUCTURE UNDER THIS APPLICATION.
B00795231-I1
07/11/2022
Signed off — Alteration
APPLICATION FILED HEREWITH TO PROPOSE INTERIOR RENOVATIONS TO THE SECOND AND THIRD FLOOR APARTMENT AS PER PLANS. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00556382-I1
07/05/2022
Special inspection requirement — Fenestration areas
sajjad javaid
07/05/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
sajjad javaid
07/05/2022
Special inspection requirement — Interior lighting power
sajjad javaid
07/05/2022
Special inspection requirement — Fenestration air leakage
sajjad javaid
07/05/2022
Special inspection requirement — Insulation placement and R values
sajjad javaid
07/05/2022
Special inspection requirement — Air barrier - visual inspection
sajjad javaid
07/05/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
sajjad javaid
07/05/2022
Special inspection requirement — Energy Code Compliance Inspections
sajjad javaid
07/05/2022
Special inspection requirement — Fire-Resistance Rated Construction
sajjad javaid
07/05/2022
Special inspection requirement — Final
sajjad javaid
07/05/2022
Special inspection requirement — Lighting in dwelling units
sajjad javaid
06/28/2022
Signed off — Alteration
APPLICATION FILED HEREWITH TO PROPOSE INTERIOR RENOVATIONS TO THE SECOND AND THIRD FLOOR APARTMENT AS PER PLANS. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00556382-S2
06/28/2022
Signed off — Alteration
APPLICATION FILED HEREWITH TO PROPOSE INTERIOR RENOVATIONS TO THE SECOND AND THIRD FLOOR APARTMENT AS PER PLANS. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00556382-S1
06/23/2022
Objection resolved — Addressed
06/23/2022
Objection resolved — Addressed
06/23/2022
Objection resolved — Addressed
06/22/2022
Objection raised — Scope
Latest 60 of 118 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKORMAN DESIGN & BUILD05/05/2023
DOB NOWMechanical SystemsSigned-offURBAN GC INC11/10/2022
DOB NOWMechanical SystemsSigned-offURBAN GC INC11/10/2022
DOB NOWPlumbingSigned-offMATHEW WEISS09/23/2022
DOB NOWGeneral ConstructionSigned-offURBAN GC INC09/12/2022
DOB NOWPlumbingSigned-offBT'S PLUMBING AND HEATING01/03/2022
DOB NOWMechanical SystemsSigned-offNYC CONSTRUCTION INC12/29/2021
DOB NOWGeneral ConstructionSigned-offNYC CONSTRUCTION INC12/22/2021
BISOTISSUEDSUNSHINE ROOMS & CONSTRUCTION CO11/23/1994
BISEQISSUEDSUNSHINE ROOMS & CONSTRUCTION CO11/23/1994
2 projects · most recent 03/19/2023
General Wiring
FiledStatusContractorScope
03/19/2023CompleteRONART ELECTRIC COGeneral Wiring
06/01/2022CompleteLENS ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
03/22/2023Pass-Final General Construction Non-Directive 14PassView ↗
03/15/2023Fail-Final General Construction Non-Directive 14FailView ↗
12/21/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/03/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/03/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/22/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/20/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/20/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
03/23/2023FinalDAVID UHprogress
03/01/2023Tenant Protection Plan ComplianceKENNY LEEspecial
02/15/2023FinalDAVID UHprogress
10/10/2022Mechanical Systems—special
10/10/2022Duct leakage testing, insulation and design—energy_progress
10/10/2022Final—progress
07/05/2022Fenestration areassajjad javaidenergy_progress
07/05/2022Fenestration and door U-factor and product ratingssajjad javaidenergy_progress
07/05/2022Interior lighting powersajjad javaidenergy_progress
07/05/2022Fenestration air leakagesajjad javaidenergy_progress
07/05/2022Insulation placement and R valuessajjad javaidenergy_progress
07/05/2022Air barrier - visual inspectionsajjad javaidenergy_progress
07/05/2022Fire-Resistant Penetrations and Jointssajjad javaidspecial
07/05/2022Energy Code Compliance Inspectionssajjad javaidprogress
07/05/2022Fire-Resistance Rated Constructionsajjad javaidprogress
07/05/2022Finalsajjad javaidprogress
07/05/2022Lighting in dwelling unitssajjad javaidenergy_progress
06/16/2022HVAC-R and service water heating system controlssajjad javaidenergy_progress
06/16/2022Fire-Resistant Penetrations and Jointssajjad javaidspecial
06/16/2022Energy Code Compliance Inspectionssajjad javaidprogress
06/16/2022HVAC-R and service water heating equipmentsajjad javaidenergy_progress
06/16/2022HVAC-R and service water piping design and insulationsajjad javaidenergy_progress
06/16/2022HVAC-R and service water heating system controlssajjad javaidenergy_progress
06/16/2022Mechanical Systemssajjad javaidspecial
06/16/2022Fire-Resistant Penetrations and Jointssajjad javaidspecial
Latest 25 of 47.
▾Documents — 93 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
09/01/2026B00556382-P2Request digital key ↗
09/01/2026B00556382-S2Request digital key ↗
09/01/2026B00556382-P3Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
07/12/2024300356175Open ↗
▸Seals & Professional Certifications60
▸DOB NOWProgress Inspector Seal & Signature39
09/30/2026B00556382-P1Open ↗
09/30/2026B00556382-P1Open ↗
09/30/2026B00556382-P1Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/01/2026B00556382-S1Open ↗
09/01/2026B00556382-S2Open ↗
09/01/2026B00556382-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/30/2026B00556382-P1Open ↗
09/01/2026B00556382-S1Open ↗
09/01/2026B00556382-S2Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
09/01/2026B00556382-S2Open ↗
09/01/2026B00556382-P3Open ↗
08/28/2026B00795311-P1Open ↗
Showing 3 of 9 on file for this type
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis.4
08/14/2026B00556382-I1Open ↗
08/13/2026B00556382-S2Open ↗
08/13/2026B00556382-S1Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY3
07/12/2024300356175Open ↗
07/12/2024300356175Open ↗
07/10/2024300356175Open ↗
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
07/10/2024300356175Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/15/2024300356175Open ↗
▸Other Documents1
▸BIS* FIRE STOPS 27-3451
07/10/2024300356175Open ↗