← Back
Two family brick
829 ASHFORD STREET
BROOKLYN · East New York-New Lots · BIN 3097723
💬 Discuss this project
1970Year Built
2Stories
B1Building Class
R5Zoning
1,800 sfGross Floor Area
2Units
Rent Stabilized3 Open Violations ▸FDNY Report ↗
Two family brick · 2,000 sf lot · 0.9 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbing
Floor 21p · 1 filing · 20 docs
Floor 1
Cellar3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FAIRDEALS PROPERTIES1407/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/21/2021$875K—FAIR DEALS PROPERTIES LLC → Private party$486/sf building
09/23/2020$575K—— → —$319/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARC-HI-TECT ASSOCIATE INC411/22/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARANDA PLBG & HTG CORPPlumbing607/08/2026
MOHAMMED HOSSAINGeneral Contractor103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARC-HI-TECH ASSOCIATES IN6963411/22/2021
Building Lifecycle
All (24)Filed (4)Permit Issued (2)Signed Off (1)Violation (5)Special Inspection (12)
11/24/2025
Violation issued (HPD, open)
I
12/03/2024
Violation issued (HPD, open)
I
11/28/2023
Violation issued (HPD, open)
I
03/16/2022
Violation issued (HPD, closed)
I
12/17/2021
Signed off — Alteration
At cel replace existing 1 boiler,1 hot water tank, add 1 gas meter with existing gas bar, keep 3 pcs bathroom & replace existing 1 washing machine,1dryer & 1 slope sink replace,.1st & 2nd-floor kitchen sink, gas range, bathroom lavatory, water closet,
B00457814-I1
11/22/2021
Filed — Alteration
At cel replace existing 1 boiler,1 hot water tank, add 1 gas meter with existing gas bar, keep 3 pcs bathroom & replace existing 1 washing machine,1dryer & 1 slope sink replace,.1st & 2nd-floor kitchen sink, gas range, bathroom lavatory, water closet,
B00457814-P3
11/22/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
IGOR LISOVENKO
11/22/2021
Special inspection requirement — Maintenance information
IGOR LISOVENKO
11/22/2021
Special inspection requirement — Energy Code Compliance
IGOR LISOVENKO
11/22/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
IGOR LISOVENKO
11/22/2021
Special inspection requirement — Energy Code Compliance
IGOR LISOVENKO
11/22/2021
Special inspection requirement — Maintenance information
IGOR LISOVENKO
11/08/2021
Filed — Alteration
At cel replace existing 1 boiler,1 hot water tank, add 1 gas meter with existing gas bar, keep 3 pcs bathroom & replace existing 1 washing machine,1dryer & 1 slope sink replace,.1st & 2nd-floor kitchen sink, gas range, bathroom lavatory, water closet,
B00457814-P2
11/05/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
IGOR LISOVENKO
11/05/2021
Special inspection requirement — Energy Code Compliance
IGOR LISOVENKO
11/05/2021
Special inspection requirement — Maintenance information
IGOR LISOVENKO
10/21/2021
Permit issued — Plumbing
B00457814-I1-PL
08/09/2021
Filed — Alteration
At cel replace existing 1 boiler,1 hot water tank, add 1 gas meter with existing gas bar, keep 3 pcs bathroom & replace existing 1 washing machine,1dryer & 1 slope sink replace,.1st & 2nd-floor kitchen sink, gas range, bathroom lavatory, water closet,
B00457814-P1
07/24/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
IGOR LISOVENKO
07/24/2021
Special inspection requirement — Maintenance information
IGOR LISOVENKO
07/24/2021
Special inspection requirement — Energy Code Compliance
IGOR LISOVENKO
04/21/2021
Violation issued (HPD, closed)
I
03/19/2021
Permit issued — Plumbing
B00457814-I1-PL
01/21/2021
Filed — Alteration
At cel replace existing 1 boiler,1 hot water tank, add 1 gas meter with existing gas bar, keep 3 pcs bathroom & replace existing 1 washing machine,1dryer & 1 slope sink replace,.1st & 2nd-floor kitchen sink, gas range, bathroom lavatory, water closet,
B00457814-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offARANDA PLBG & HTG CORP10/21/2021
DOB NOWPlumbingSigned-offARANDA PLBG & HTG CORP03/19/2021
BISOTISSUEDFINE & FAIR CONSTRUCTION01/12/2021
1 project · most recent 11/23/2020
FiledStatusContractorScope
11/23/2020CompleteFIBERTEK DATA & ELEC CORP2 meters, 2 new_meters
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
11/22/2021Fire-Resistant Penetrations and JointsIGOR LISOVENKOspecial
11/22/2021Maintenance informationIGOR LISOVENKOenergy_progress
11/22/2021Energy Code ComplianceIGOR LISOVENKOprogress
11/22/2021Fire-Resistant Penetrations and JointsIGOR LISOVENKOspecial
11/22/2021Energy Code ComplianceIGOR LISOVENKOprogress
11/22/2021Maintenance informationIGOR LISOVENKOenergy_progress
11/05/2021Fire-Resistant Penetrations and JointsIGOR LISOVENKOspecial
11/05/2021Energy Code ComplianceIGOR LISOVENKOprogress
11/05/2021Maintenance informationIGOR LISOVENKOenergy_progress
07/24/2021Fire-Resistant Penetrations and JointsIGOR LISOVENKOspecial
07/24/2021Maintenance informationIGOR LISOVENKOenergy_progress
07/24/2021Energy Code ComplianceIGOR LISOVENKOprogress
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch - Plumbing4
08/31/2026B00457814-P1Request digital key ↗
08/31/2026B00457814-I1Request digital key ↗
08/31/2026B00457814-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
12/18/2020340797579Open ↗
▸BISWORK PERMIT APPLICATION1
01/12/2021340797579Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWRestrictive Declaration/Easement 14
08/13/2026B00457814-P3Open ↗
08/13/2026B00457814-P1Open ↗
08/13/2026B00457814-P2Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature8
08/27/2026B00457814-P3Open ↗
08/27/2026B00457814-P3Open ↗
08/24/2026B00457814-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/31/2026B00457814-I1Open ↗
08/31/2026B00457814-P3Open ↗
08/31/2026B00457814-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/27/2026B00457814-P3Open ↗
08/24/2026B00457814-P2Open ↗
08/23/2026B00457814-I1Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/18/2020340797579Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/18/2020340797579Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/18/2020340797579Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/31/2026B00457814-I1Open ↗
08/31/2026B00457814-P3Open ↗
08/31/2026B00457814-P2Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/18/2020340797579Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
07/30/2021340797579Open ↗
12/21/2020340797579Open ↗
12/18/2020340797579Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/30/2021340797579Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/18/2020340797579Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00457814-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
07/30/2021340797579Open ↗
12/21/2020340797579Open ↗
12/18/2020340797579Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/30/2021340797579Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
07/30/2021340797579Open ↗
12/18/2020340797579Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
12/18/2020340797579Open ↗