Elevator apt, fireproof without stores
Boulevard Houses
829 SCHENCK AVENUE · BIN 3324288
💬 Discuss this project
1953Year Built
6Stories
D3Building Class
R5Zoning
380,300 sfGross Floor Area
744Units
LL97 CoveredRent Stabilized107 Open Violations ▸FISP: SWARMPFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: BOULEVARD TOGETHER OWNER LLC · 517,750 sf lot · 0.73 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbing
Roof62p · 4 filings · 20 docs
Floor 659p · 2 filings · 20 docs
Floor 559p · 2 filings · 20 docs
Floor 459p · 2 filings · 20 docs
Floor 359p · 2 filings · 20 docs
Floor 259p · 2 filings · 20 docs
Floor 16p · 3 filings · 20 docs
Basement9p · 4 filings · 20 docs
Sub-Basement56p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK CITY HOUSING AUTHORITY4809/01/2026
BOULEVARD TOGETHER DEVELOPER1107/08/2026
PROPERTY RESOURCES407/08/2026
PLATINUM SERVICES NY507/08/2026
BOULEVARD TOGETHER OWNER LLC203/22/2026
NYCHA 99203/22/2026
NYC HOUSING AUTHORITY1403/22/2026
AAD CONSTRUCTION103/22/2026
NYCHA703/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EP ENGINEERING LLC1003/24/2026
PETER CLEMENTS ARCHITECT902/14/2025
BERNARD OCASIO ARCHITECT, P.C.206/10/2024
ASHRAF CORP112/27/2023
M. HAMDI GUNAL, PE, P. C.110/18/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BETRO DESIGN GROUP1903/21/2026
GREEN STUDIO203/21/2026
SANDEEP KAUR103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.A.D. CONSTRUCTION CORPGeneral Contractor2707/08/2026
AURA PLUMBING INCPlumbing507/08/2026
MISA PLUMBING, LLCPlumbing303/22/2026
ANTHONY COSCHIGANO IIIElectrical203/21/2026
SUTTON, ALEXElectrical103/21/2026
COLE, VINCENTElectrical103/21/2026
AURA PLUMBINGGeneral Contractor103/22/2026
PLATINUM SERVICES NY LLCGeneral Contractor107/08/2026
CINTRON ELECL SVCS & LIGTElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EP INSPECTIONS AND COMMIS70791703/24/2026
AMARACON TESTING & INSPEC5842402/14/2025
INTERNATIONAL GEOTEHCNICA1795206/10/2024
AP PROFESSIONAL ENGINEERI5974102/07/2024
M. HAMDI GUNAL, PE, P.C.3000110/18/2021
Building Lifecycle
All (195)Filed (24)Permit Issued (26)Signed Off (8)Facade (FISP) (13)Violation (60)Inspection (4)Objection (30)Special Inspection (30)
05/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Burgess
05/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Burgess
05/20/2026
Special inspection requirement — Energy Code Compliance Inspections
Christopher Burgess
05/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Burgess
05/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Burgess
04/01/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/31/2026
Violation issued (HPD, closed)
C
03/31/2026
Objection resolved — Resolved
03/25/2026
Objection raised — Cost
03/24/2026
Filed — Alteration
REPLACEMENT OF ALL BATHROOM, KITCHEN FIXTURES, SLOP SINK IN JANITORS CLOSET AND ROOF DRAINS WITHIN EXISTING LOCATION. NEW PLUMBING FIXTURES AT CELLAR AS PER PLANS FILED. THE REPLACEMENT OF THE BOOSTER PUMP AT BASEMENT WILL SUPERCEDE APPL # 300571744.
B00538320-P7
01/23/2026
Violation issued (HPD, closed)
C
11/14/2025
Cycle 10 facade report signed — SWARMP
11/06/2025
Signed off — Alteration
Suspended Scaffold outrigger system for exterior facade restoration work.
B01001803-I1
10/23/2025
Signed off — Alteration
INSTALLATION OF NEW AIR COOLED CONDENSING UNIT WITH ASSOCIATED DUCT WORK AND PIPING, EXHAUST FANS AND REPLACEMENT OF EXISTING MECHANICAL EQUIPMENT AS PER PLANS FILED.
B00539281-I1
10/01/2025
Cycle 10 facade inspection completed
09/25/2025
Special inspection requirement — Maintenance information
Christopher Burgess
09/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Burgess
09/25/2025
Special inspection requirement — Mechanical Systems
Christopher Burgess
09/25/2025
Special inspection requirement — Duct leakage testing, insulation and design
Christopher Burgess
09/25/2025
Special inspection requirement — Shutoff dampers
Christopher Burgess
09/25/2025
Special inspection requirement — Final
Christopher Burgess
09/25/2025
Special inspection requirement — Energy Code Compliance Inspections
Christopher Burgess
09/25/2025
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Burgess
09/25/2025
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Burgess
09/18/2025
Filed — Alteration
INSTALLATION OF NEW AIR COOLED CONDENSING UNIT WITH ASSOCIATED DUCT WORK AND PIPING, EXHAUST FANS AND REPLACEMENT OF EXISTING MECHANICAL EQUIPMENT AS PER PLANS FILED.
B00539281-P1
09/08/2025
Violation issued (HPD, closed)
B
09/08/2025
Violation issued (HPD, closed)
B
09/08/2025
Violation issued (HPD, closed)
A
09/08/2025
Violation issued (HPD, closed)
C
09/08/2025
Violation issued (HPD, closed)
C
09/08/2025
Violation issued (HPD, closed)
B
09/03/2025
Violation issued (HPD, closed)
B
09/03/2025
Violation issued (HPD, closed)
B
09/03/2025
Violation issued (HPD, closed)
B
09/03/2025
Violation issued (HPD, closed)
B
09/03/2025
Violation issued (HPD, closed)
B
07/07/2025
Violation issued (HPD, closed)
C
06/03/2025
Permit issued — Plumbing
B00538320-I1-PL
06/01/2025
Cycle 10 facade report submitted
04/07/2025
Special inspection requirement — Final
Christopher Burgess
04/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Burgess
04/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Burgess
04/07/2025
Special inspection requirement — Duct leakage testing, insulation and design
Christopher Burgess
04/07/2025
Special inspection requirement — Maintenance information
Christopher Burgess
04/07/2025
Special inspection requirement — Energy Code Compliance Inspections
Christopher Burgess
04/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Burgess
04/07/2025
Special inspection requirement — Shutoff dampers
Christopher Burgess
04/07/2025
Special inspection requirement — Mechanical Systems
Christopher Burgess
03/26/2025
Filed — Alteration
REPLACEMENT OF ALL BATHROOM, KITCHEN FIXTURES, SLOP SINK IN JANITORS CLOSET AND ROOF DRAINS WITHIN EXISTING LOCATION. NEW PLUMBING FIXTURES AT CELLAR AS PER PLANS FILED. THE REPLACEMENT OF THE BOOSTER PUMP AT BASEMENT WILL SUPERCEDE APPL # 300571744.
B00538320-P6
03/11/2025
Signed off — Alteration
B00595621-I1
03/10/2025
Signed off — Alteration
B00530084-I1
03/10/2025
Violation issued (HPD, closed)
C
03/10/2025
Violation issued (HPD, closed)
C
03/06/2025
Violation issued (HPD, closed)
C
03/06/2025
Violation issued (HPD, closed)
C
03/06/2025
Violation issued (HPD, closed)
B
03/06/2025
Violation issued (HPD, closed)
B
03/06/2025
Violation issued (HPD, closed)
B
02/14/2025
Filed — Alteration
B00530084-P2
01/31/2025
Special inspection requirement — Structural Steel - Details
Latest 60 of 195 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAURA PLUMBING INC06/03/2025
DOB NOWStructuralSigned-offA.A.D. CONSTRUCTION CORP12/30/2024
DOB NOWMechanical SystemsSigned-offA.A.D. CONSTRUCTION CORP12/04/2024
DOB NOWStructuralSigned-offA.A.D. CONSTRUCTION CORP06/21/2024
DOB NOWStructuralSigned-offA.A.D. CONSTRUCTION CORP06/21/2024
DOB NOWProtection and Mechanical MethodsSigned-offA.A.D. CONSTRUCTION CORP03/19/2024
DOB NOWSuspended ScaffoldPermit IssuedJAVA BUILDERS INC02/13/2024
DOB NOWGeneral ConstructionSigned-offA.A.D. CONSTRUCTION CORP01/11/2024
DOB NOWStructuralSigned-offA.A.D. CONSTRUCTION CORP01/03/2024
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC12/28/2023
DOB NOWMechanical SystemsSigned-offA.A.D. CONSTRUCTION CORP11/29/2023
DOB NOWPlumbingPermit IssuedAURA PLUMBING INC11/13/2023
DOB NOWStructuralSigned-offA.A.D. CONSTRUCTION CORP06/28/2023
DOB NOWGeneral ConstructionSigned-offA.A.D. CONSTRUCTION CORP06/28/2023
DOB NOWGeneral ConstructionSigned-offA.A.D. CONSTRUCTION CORP05/31/2023
DOB NOWStructuralSigned-offA.A.D. CONSTRUCTION CORP12/22/2022
DOB NOWGeneral ConstructionSigned-offA.A.D. CONSTRUCTION CORP12/06/2022
DOB NOWStructuralSigned-offA.A.D. CONSTRUCTION CORP12/06/2022
DOB NOWMechanical SystemsSigned-offA.A.D. CONSTRUCTION CORP12/05/2022
DOB NOWPlumbingPermit IssuedAURA PLUMBING INC12/02/2022
DOB NOWGeneral ConstructionPermit IssuedA.A.D. CONSTRUCTION CORP07/14/2022
DOB NOWPlumbingPermit IssuedAURA PLUMBING INC12/09/2021
DOB NOWGeneral ConstructionSigned-offA.A.D. CONSTRUCTION CORP12/09/2021
DOB NOWStructuralSigned-offA.A.D. CONSTRUCTION CORP12/07/2021
DOB NOWStructuralSigned-offA.A.D. CONSTRUCTION CORP12/07/2021
DOB NOWMechanical SystemsSigned-offA.A.D. CONSTRUCTION CORP12/04/2021
BISOTISSUEDNEELAM CONSTRUCTION CORP05/18/2015
BISEQISSUEDNEELAM CONSTRUCTION CORP05/04/2015
BISEQISSUEDSKYWORX CONTRACTING INC04/10/2015
BISOTISSUEDSTONEWALL CONTRACTING COR04/15/2011
BISEQISSUEDTWIN & SWING SCAFFOLDING03/08/2011
BISEQISSUEDTWIN & SWING SCAFFOLDING03/04/2011
BISPLISSUEDRICHARDS P AND H CO, INC02/11/2011
BISPLISSUEDPERFORMANCE PLUMBING01/16/2007
BISEQISSUEDMBR CONT INC09/30/2005
BISPLISSUEDDELPHI PLBG. & HTG., INC07/15/2005
BISEQISSUEDMBR CONT INC04/26/2005
BISPLISSUEDDELPHI PLBG. & HTG., INC09/08/2004
BISPLISSUEDV. C. VITANZA SONS INC12/01/2003
BISEQISSUEDPHOENIX CONSTRUCTION CORP06/07/2000
1 project · most recent 03/24/2026
FiledStatusContractorScope
03/24/2026——8 heads
1 project · most recent 03/24/2026
Gas Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
03/24/2026Permit IssuedAURA PLUMBING INCGas, Plumbing-Sprinkler, Storm, Water/Sanitary
8 projects · most recent 06/11/2026
General Wiring
FiledStatusContractorScope
06/11/2026Permit IssuedECNY ELEC'L CONTR'S, INCGeneral Wiring
05/26/2026CompleteECNY ELEC'L CONTR'S, INCGeneral Wiring
01/04/2025CompleteCINTRON ELECL SVCS & LIGTGeneral Wiring
01/04/2025Permit IssuedCINTRON ELECL SVCS & LIGTGeneral Wiring
12/26/2023CompleteILLUMINOUS ELECTRIC CORP.General Wiring
04/05/2023Permit IssuedCINTRON ELECL SVCS & LIGTGeneral Wiring
11/02/2022Permit IssuedR.C.M. ELECTRIC CORP.—
04/14/2022Permit IssuedR.C.M. ELECTRIC CORP.—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/01/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/11/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/11/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/20/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 70
DateRequirementInspectorRole
05/20/2026Fire-Resistant Penetrations and JointsChristopher Burgessspecial
05/20/2026HVAC-R and service water heating system controlsChristopher Burgessenergy_progress
05/20/2026HVAC-R and service water piping design and insulationChristopher Burgessenergy_progress
05/20/2026HVAC-R and service water heating equipmentChristopher Burgessenergy_progress
05/20/2026Energy Code Compliance InspectionsChristopher Burgessprogress
09/25/2025Duct leakage testing, insulation and designChristopher Burgessenergy_progress
09/25/2025Energy Code Compliance InspectionsChristopher Burgessprogress
09/25/2025FinalChristopher Burgessprogress
09/25/2025Mechanical SystemsChristopher Burgessspecial
09/25/2025Fire-Resistant Penetrations and JointsChristopher Burgessspecial
09/25/2025Maintenance informationChristopher Burgessenergy_progress
09/25/2025HVAC-R and service water heating system controlsChristopher Burgessenergy_progress
09/25/2025Shutoff dampersChristopher Burgessenergy_progress
09/25/2025HVAC-R and service water heating equipmentChristopher Burgessenergy_progress
04/07/2025HVAC-R and service water heating equipmentChristopher Burgessenergy_progress
04/07/2025Shutoff dampersChristopher Burgessenergy_progress
04/07/2025HVAC-R and service water heating system controlsChristopher Burgessenergy_progress
04/07/2025Mechanical SystemsChristopher Burgessspecial
04/07/2025Fire-Resistant Penetrations and JointsChristopher Burgessspecial
04/07/2025FinalChristopher Burgessprogress
04/07/2025Energy Code Compliance InspectionsChristopher Burgessprogress
04/07/2025Maintenance informationChristopher Burgessenergy_progress
04/07/2025Duct leakage testing, insulation and designChristopher Burgessenergy_progress
01/31/2025Structural Steel - Details—special
01/28/2025Energy Code Compliance InspectionsChristopher Burgessprogress
Latest 25 of 70.
▾Documents — 233 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch24
09/01/2026B00530139-I1Request digital key ↗
09/01/2026B00530139-P1Request digital key ↗
09/01/2026B00530139-P2Request digital key ↗
Showing 3 of 24 on file for this type
▸Applications & Permits15
▸BISPLAN / WORK APPROVAL APPLICATION9
11/16/2021301511549Open ↗
05/05/2015340237390Open ↗
05/03/2015340237407Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION6
05/03/2015340237407Open ↗
04/08/2015340247405Open ↗
04/18/2011320162649Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications99
▸DOB NOWProgress Inspector Seal & Signature38
09/01/2026B00538320-P3Open ↗
09/01/2026B00538320-P3Open ↗
09/01/2026B00538320-I1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature23
09/01/2026B00530139-I1Open ↗
09/01/2026B00530139-P1Open ↗
09/01/2026B00530139-P2Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/04/2026B01013173-I1Open ↗
09/04/2026B01013173-I1Open ↗
09/01/2026B00538320-P3Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
05/12/2016340237390Open ↗
07/31/2015340237407Open ↗
07/29/2015340247405Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
05/05/2015340237390Open ↗
05/03/2015340237407Open ↗
04/08/2015340247405Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
05/05/2015340237390Open ↗
05/03/2015340237407Open ↗
04/08/2015340247405Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
05/05/2015340237390Open ↗
05/03/2015340237407Open ↗
04/08/2015340247405Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
03/15/2011320277375Open ↗
03/07/2011320277062Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
03/15/2011320277375Open ↗
03/07/2011320277062Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
01/18/2011320261195Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026B00774515-I1Open ↗
▸Environmental & Asbestos25
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
09/01/2026B00530084-I1Open ↗
09/01/2026B00530084-P1Open ↗
09/01/2026B00530084-P2Open ↗
Showing 3 of 17 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
03/15/2011320277375Open ↗
03/07/2011320277062Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
05/12/2016340237390Open ↗
05/05/2015340237390Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
05/12/2016340237390Open ↗
12/07/2011320162649Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
01/18/2011320261195Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
09/01/2026B00530139-I1Open ↗
▸Energy Compliance7
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026B00530084-I1Open ↗
08/13/2026B00530139-I1Open ↗
08/13/2026B00539281-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
05/05/2015340237390Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
05/12/2016340237390Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/12/2016340237390Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
05/05/2015340237390Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
12/08/2021301029777Open ↗
12/03/2021301029777Open ↗
12/03/2021301029777Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs39
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter20
09/01/2026B00530139-I1Open ↗
09/01/2026B00530139-P1Open ↗
09/01/2026B00530139-P2Open ↗
Showing 3 of 20 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
12/17/2021301029777Open ↗
05/12/2016340237390Open ↗
07/31/2015340237407Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
03/15/2011320277375Open ↗
03/07/2011320277062Open ↗
01/18/2011320261195Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)4
08/13/2026B00530139-I1Open ↗
08/13/2026B00595621-I1Open ↗
08/13/2026B00530084-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)3
08/13/2026B01013173-I1Open ↗
08/13/2026B01013173-P1Open ↗
08/13/2026B00774515-I1Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
04/18/2011320162649Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
05/12/2016340237390Open ↗
05/05/2015340237390Open ↗
12/19/2011320162649Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET4
03/15/2011320277375Open ↗
03/07/2011320277062Open ↗
01/18/2011320261195Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
05/05/2015340237390Open ↗
05/03/2015340237407Open ↗
04/08/2015340247405Open ↗
▸BISADDITIONAL INFORMATION1
05/02/2011320277062Open ↗
▸Other Documents3
▸BISSupporting Document: Fee Exempt1
12/02/2021301029777Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01001803-I1Open ↗
▸DOB NOWCalculations1
08/13/2026B01001803-I1Open ↗