← Back
Elevator apt, fireproof without stores
Boulevard Houses
829 SCHENCK AVENUE · BIN 3324294
💬 Discuss this project
1953Year Built
6Stories
D3Building Class
R5Zoning
380,300 sfGross Floor Area
744Units
LL97 CoveredRent Stabilized107 Open Violations ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: BOULEVARD TOGETHER OWNER LLC · 517,750 sf lot · 0.73 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof47p · 5 filings · 20 docs
Floor 1443p · 1 filing · 20 docs
Floor 1343p · 1 filing · 20 docs
Floor 1243p · 1 filing · 20 docs
Floor 1143p · 1 filing · 20 docs
Floor 1043p · 1 filing · 20 docs
Floor 943p · 1 filing · 20 docs
Floor 843p · 1 filing · 20 docs
Floor 743p · 1 filing · 20 docs
Floor 643p · 1 filing · 20 docs
Floor 543p · 1 filing · 20 docs
Floor 443p · 1 filing · 20 docs
Floor 345p · 2 filings · 20 docs
Floor 243p · 1 filing · 20 docs
Floor 16p · 2 filings · 20 docs
Cellar54p · 4 filings · 20 docs
Basement1p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK CITY HOUSING AUTHORITY4608/31/2026
BOULEVARD TOGETHER DEVELOPER1507/08/2026
BOULEVARD TOGETHER OWNER LLC203/22/2026
NYCHA 99103/22/2026
NYC HOUSING AUTHORITY1203/22/2026
HUDSON103/22/2026
NYCHA303/21/2026
NYCHA C O TWIN SWING SCAFFOLD403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EP ENGINEERING LLC605/12/2026
PETER CLEMENTS ARCHITECT702/14/2025
M. HAMDI GUNAL, PE, P. C.112/04/2023
PAUL PERDEK, PROF. ENG. PLLC109/30/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BETRO DESIGN GROUP1303/21/2026
AE DESIGN SOLUTION403/21/2026
SMEP DESIGN & CONSULTATION LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BROADWAY BUILDERS LLCGeneral Contractor2807/08/2026
BLETSAS PLBNG & HTG CORPPlumbing507/08/2026
POWERS BRIDGING & SCAFFOLDINGGeneral Contractor403/21/2026
ALAFOGIANNIS PLBG & HTGPlumbing203/22/2026
THE METRO GROUP ELECTRICElectrical103/22/2026
COLE, VINCENTElectrical103/21/2026
SUPERIOR PLUMBING & HEATINGPlumbing106/28/2026
KENNETH HERSOMElectrical103/21/2026
SUTTON, ALEXElectrical103/21/2026
THANASI ELECTRICAL, LLCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EP INSPECTIONS AND COMMIS70791305/12/2026
AMARACON TESTING & INSPEC5842202/14/2025
M. HAMDI GUNAL, PE, P.C.3000212/04/2023
Building Lifecycle
All (206)Filed (17)Permit Issued (29)Signed Off (7)Facade (FISP) (13)Violation (60)Inspection (12)Objection (38)Special Inspection (30)
05/12/2026
Filed — Alteration
REPLACEMENT OF ALL BATHROOM, KITCHEN FIXTURES, SLOP SINK IN JANITORS CLOSET AND ROOF DRAINS WITHIN EXISTING LOCATION. NEW PLUMBING FIXTURES AT CELLAR AS PER PLANS FILED.
B00539190-P3
02/12/2026
Special inspection requirement — Energy Code Compliance Inspections
Christopher Burgess
02/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Burgess
02/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Burgess
02/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Burgess
02/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Burgess
01/14/2026
Violation issued (HPD, closed)
B
01/14/2026
Violation issued (HPD, closed)
A
01/14/2026
Violation issued (HPD, closed)
A
12/23/2025
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
B01205065-I1
12/22/2025
Permit issued — Suspended Scaffold
B01205065-I1-SC
12/15/2025
Violation issued (HPD, closed)
A
12/15/2025
Violation issued (HPD, closed)
B
12/15/2025
Violation issued (HPD, closed)
B
11/15/2025
Violation issued (HPD, closed)
B
11/15/2025
Violation issued (HPD, closed)
A
11/15/2025
Violation issued (HPD, closed)
A
10/30/2025
Violation issued (HPD, closed)
A
10/30/2025
Violation issued (HPD, closed)
C
10/01/2025
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
09/29/2025
Signed off — Alteration
REPLACE ALL EXISTING ROOF EXHAUST FANS, INSTALL NEW LOUVER AND CEILING EXHAUST FAN AT RECYCLE CLOSET AT FIRST FLOOR, INSTALL NEW RADIATOR COVERS AND REPLACE EXISTING GRILLE AS PER PLANS FILED.
B00539274-I1
09/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Burgess
09/26/2025
Special inspection requirement — Energy Code Compliance Inspections
Christopher Burgess
09/26/2025
Special inspection requirement — Final
Christopher Burgess
09/26/2025
Special inspection requirement — Mechanical Systems
Christopher Burgess
09/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Burgess
09/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Burgess
09/26/2025
Special inspection requirement — Duct leakage testing, insulation and design
Christopher Burgess
09/26/2025
Special inspection requirement — Maintenance information
Christopher Burgess
09/26/2025
Special inspection requirement — Shutoff dampers
Christopher Burgess
09/18/2025
Filed — Alteration
REPLACE ALL EXISTING ROOF EXHAUST FANS, INSTALL NEW LOUVER AND CEILING EXHAUST FAN AT RECYCLE CLOSET AT FIRST FLOOR, INSTALL NEW RADIATOR COVERS AND REPLACE EXISTING GRILLE AS PER PLANS FILED.
B00539274-P1
08/02/2025
Violation issued (HPD, closed)
B
08/02/2025
Violation issued (HPD, closed)
C
08/02/2025
Violation issued (HPD, closed)
B
07/30/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/01/2025
Violation issued (HPD, closed)
C
07/01/2025
Violation issued (HPD, closed)
A
06/28/2025
Violation issued (HPD, closed)
A
06/24/2025
Violation issued (HPD, closed)
C
06/17/2025
Signed off — Alteration
REMOVE & INSTALL TRASH COMPACTOR; DOORS; WALL & FLOOR TILE IN BATHRMS, ALL GYP. BOARD AS REQUIRED, MASONRY REPAIRS,REPAIR MINOR PARTITIONS AS NEEDED,INSTALL 6'-0" CHAIN LINK FENCE FOR OUTDOOR MECH. EQUIP. & NEW FLOORING OVER EXISTING.
B00539240-I1
06/17/2025
Violation issued (HPD, closed)
C
06/17/2025
Violation issued (HPD, closed)
C
06/17/2025
Violation issued (HPD, closed)
C
06/12/2025
Cycle 10 facade report submitted
06/12/2025
Cycle 10 facade report signed — SAFE
05/28/2025
Cycle 10 facade inspection completed
05/23/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/06/2025
Permit issued — Plumbing
B00539190-I1-PL
04/14/2025
Permit issued — Suspended Scaffold
B01205065-I1-SC
04/09/2025
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
B01205065-I1
04/07/2025
Special inspection requirement — Shutoff dampers
Christopher Burgess
04/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Burgess
04/07/2025
Special inspection requirement — Mechanical Systems
Christopher Burgess
04/07/2025
Special inspection requirement — Energy Code Compliance Inspections
Christopher Burgess
04/07/2025
Special inspection requirement — Final
Christopher Burgess
04/07/2025
Special inspection requirement — Maintenance information
Christopher Burgess
04/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Burgess
04/07/2025
Special inspection requirement — Duct leakage testing, insulation and design
Christopher Burgess
04/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Burgess
Latest 60 of 206 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedSTRUCTUAL PRESV SYSTEM12/22/2025
DOB NOWPlumbingPermit IssuedSUPERIOR PLUMBING & HEATI05/06/2025
DOB NOWSuspended ScaffoldPermit IssuedSTRUCTUAL PRESV SYSTEM04/14/2025
DOB NOWGeneral ConstructionPermit IssuedBROADWAY BUILDERS LLC08/09/2024
DOB NOWStructuralSigned-offBROADWAY BUILDERS LLC08/05/2024
DOB NOWMechanical SystemsSigned-offBROADWAY BUILDERS LLC08/05/2024
DOB NOWStructuralSigned-offBROADWAY BUILDERS LLC08/05/2024
DOB NOWPlumbingPermit IssuedBLETSAS PLBNG & HTG CORP05/16/2024
DOB NOWSuspended ScaffoldSigned-offSKYLINE RESTORATION INC02/28/2024
DOB NOWStructuralSigned-offBROADWAY BUILDERS LLC12/14/2023
DOB NOWGeneral ConstructionSigned-offBROADWAY BUILDERS LLC11/30/2023
DOB NOWSidewalk ShedSigned-offPOWERS BRIDGING & SCAFFOL09/27/2023
DOB NOWGeneral ConstructionSigned-offBROADWAY BUILDERS LLC08/11/2023
DOB NOWMechanical SystemsSigned-offBROADWAY BUILDERS LLC08/11/2023
DOB NOWGeneral ConstructionSigned-offBROADWAY BUILDERS LLC08/11/2023
DOB NOWGeneral ConstructionPermit IssuedBROADWAY BUILDERS LLC07/13/2023
DOB NOWPlumbingPermit IssuedBLETSAS PLBNG & HTG CORP03/01/2023
DOB NOWSidewalk ShedSigned-offPOWERS BRIDGING & SCAFFOL10/01/2022
DOB NOWMechanical SystemsSigned-offBROADWAY BUILDERS LLC08/11/2022
DOB NOWGeneral ConstructionSigned-offBROADWAY BUILDERS LLC08/11/2022
DOB NOWGeneral ConstructionSigned-offBROADWAY BUILDERS LLC08/11/2022
DOB NOWStructuralSigned-offBROADWAY BUILDERS LLC05/31/2022
DOB NOWGeneral ConstructionSigned-offBROADWAY BUILDERS LLC05/31/2022
DOB NOWMechanical SystemsSigned-offBROADWAY BUILDERS LLC05/31/2022
DOB NOWPlumbingPermit IssuedBLETSAS PLBNG & HTG CORP02/26/2022
DOB NOWGeneral ConstructionSigned-offBROADWAY BUILDERS LLC02/09/2022
DOB NOWMechanical SystemsSigned-offBROADWAY BUILDERS LLC02/09/2022
DOB NOWGeneral ConstructionSigned-offBROADWAY BUILDERS LLC02/09/2022
DOB NOWGeneral ConstructionSigned-offBROADWAY BUILDERS LLC02/09/2022
BISEQISSUEDSKYWORX CONTRACTING INC01/30/2015
BISEQISSUEDNEELAM CONSTRUCTION CORP11/19/2014
BISOTISSUEDNEELAM CONSTRUCTION CORP11/07/2014
BISOTISSUEDSTONEWALL CONTRACTING COR04/15/2011
BISEQISSUEDTWIN & SWING SCAFFOLDING02/16/2011
BISEQISSUEDTWIN & SWING SCAFFOLDING02/16/2011
BISEQISSUEDTWIN & SWING SCAFFOLDING11/01/2010
BISPLISSUEDPERFORMANCE PLUMBING01/16/2007
BISEQISSUEDMBR CONTRACTING INC05/10/2006
BISPLISSUEDV. C. VITANZA SONS INC12/01/2003
1 project · most recent 05/12/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/12/2026Permit IssuedSUPERIOR PLUMBING & HEATIGas, Storm, Water/Sanitary
9 projects · most recent 07/23/2026
General Wiring
FiledStatusContractorScope
07/23/2026CompleteR.C.M. ELECTRIC CORP.—
04/28/2026CompleteR.C.M. ELECTRIC CORP.—
09/18/2025Permit IssuedTHANASI ELECTRICAL, LLCGeneral Wiring
08/29/2024CompleteR. DONOVAN & SON ELECTRIC—
10/30/2022CompleteJTE ELECTRICAL SERVICES—
10/25/2022CompleteTHE METRO GROUP ELECTRICGeneral Wiring
08/01/2022CompleteR. DONOVAN & SON ELECTRICGeneral Wiring
07/12/2022CompleteGPN ELECTRIC CORP—
05/19/2022CompleteOPTIMAL ELECTRIC, INC—
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
10/01/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
07/30/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/23/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/10/2024Pass-Final SolarPassView ↗
08/30/2024Fail-Final CND-Occupancy InspectionFailView ↗
08/20/2024Fail-Final CND-Occupancy InspectionFailView ↗
08/16/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/19/2024Fail-Final CND-Occupancy InspectionFailView ↗
06/05/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
05/31/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
05/31/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 59
DateRequirementInspectorRole
02/12/2026Energy Code Compliance InspectionsChristopher Burgessprogress
02/12/2026Fire-Resistant Penetrations and JointsChristopher Burgessspecial
02/12/2026HVAC-R and service water heating system controlsChristopher Burgessenergy_progress
02/12/2026HVAC-R and service water piping design and insulationChristopher Burgessenergy_progress
02/12/2026HVAC-R and service water heating equipmentChristopher Burgessenergy_progress
09/26/2025HVAC-R and service water heating equipmentChristopher Burgessenergy_progress
09/26/2025Energy Code Compliance InspectionsChristopher Burgessprogress
09/26/2025FinalChristopher Burgessprogress
09/26/2025Mechanical SystemsChristopher Burgessspecial
09/26/2025Fire-Resistant Penetrations and JointsChristopher Burgessspecial
09/26/2025HVAC-R and service water heating system controlsChristopher Burgessenergy_progress
09/26/2025Duct leakage testing, insulation and designChristopher Burgessenergy_progress
09/26/2025Maintenance informationChristopher Burgessenergy_progress
09/26/2025Shutoff dampersChristopher Burgessenergy_progress
04/07/2025Shutoff dampersChristopher Burgessenergy_progress
04/07/2025Fire-Resistant Penetrations and JointsChristopher Burgessspecial
04/07/2025Mechanical SystemsChristopher Burgessspecial
04/07/2025Energy Code Compliance InspectionsChristopher Burgessprogress
04/07/2025FinalChristopher Burgessprogress
04/07/2025Maintenance informationChristopher Burgessenergy_progress
04/07/2025HVAC-R and service water heating system controlsChristopher Burgessenergy_progress
04/07/2025Duct leakage testing, insulation and designChristopher Burgessenergy_progress
04/07/2025HVAC-R and service water heating equipmentChristopher Burgessenergy_progress
01/27/2025Energy Code Compliance InspectionsChristopher Burgessprogress
01/27/2025HVAC-R and service water heating equipmentChristopher Burgessenergy_progress
Latest 25 of 59.
▾Documents — 192 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
09/01/2026B00539240-P1Request digital key ↗
09/01/2026B00539240-I1Request digital key ↗
09/01/2026B00539241-P2Request digital key ↗
Showing 3 of 17 on file for this type
▸Applications & Permits15
▸BISWORK PERMIT APPLICATION8
01/29/2015340226464Open ↗
11/14/2014340191848Open ↗
04/18/2011320160758Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
11/16/2021301540045Open ↗
01/29/2015340226464Open ↗
11/14/2014340191848Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications84
▸DOB NOWProgress Inspector Seal & Signature38
09/02/2026B00966880-I1Open ↗
08/29/2026B00856659-I1Open ↗
08/27/2026B00539274-P1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/01/2026B00539240-I1Open ↗
09/01/2026B00539240-P1Open ↗
09/01/2026B00539241-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/02/2026B00966880-I1Open ↗
08/29/2026B00856659-I1Open ↗
08/27/2026B00539274-P1Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
09/01/2015340191009Open ↗
07/29/2015340226464Open ↗
06/30/2015340191848Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
01/29/2015340226464Open ↗
11/14/2014340191848Open ↗
—340191009Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
01/29/2015340226464Open ↗
11/14/2014340191848Open ↗
—340191009Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
01/29/2015340226464Open ↗
11/14/2014340191848Open ↗
—340191009Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
11/03/2010320234180Open ↗
10/20/2010320228268Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
11/03/2010320234180Open ↗
10/20/2010320228268Open ↗
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/01/2026B00539240-I1Open ↗
09/01/2026B00539240-P1Open ↗
08/17/2026B00539190-P1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
11/03/2010320234180Open ↗
10/20/2010320228268Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
09/01/2015340191009Open ↗
10/27/2011320160758Open ↗
▸BISDEP FORM V5 - ASBESTOS VARIANCE1
11/27/2015340191009Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)1
10/31/2011320160758Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
09/01/2026B00539241-I1Open ↗
▸Energy Compliance7
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026B00539241-I1Open ↗
08/13/2026B00539240-I1Open ↗
08/13/2026B00539274-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
09/01/2015340191009Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
—340191009Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/01/2015340191009Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
—340191009Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
01/29/2015340226464Open ↗
11/14/2014340191848Open ↗
—340191009Open ↗
▸Approvals, Objections & Sign-offs35
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter15
09/01/2026B00539240-P1Open ↗
09/01/2026B00539241-P2Open ↗
09/01/2026B00539241-P3Open ↗
Showing 3 of 15 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
12/16/2021302088675Open ↗
11/27/2015340191009Open ↗
09/01/2015340191009Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
11/07/2011320228268Open ↗
11/07/2011320234180Open ↗
04/18/2011320160758Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
11/03/2010320234180Open ↗
10/25/2010320228268Open ↗
10/20/2010320228268Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)4
08/13/2026B00539241-I1Open ↗
08/13/2026B00539190-I1Open ↗
08/13/2026B00539274-I1Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
09/01/2015340191009Open ↗
10/31/2011320160758Open ↗
05/20/2010320160758Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms6
▸BISEFILING JOB APPLICATION COVER SHEET3
01/29/2015340226464Open ↗
11/14/2014340191848Open ↗
—340191009Open ↗
▸BISEFILING COVER SHEET3
11/03/2010320234180Open ↗
10/20/2010320228268Open ↗
05/20/2010320160758Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
12/16/2021302088675Open ↗
▸DOB NOWIRA Certification1
08/13/2026B01205065-I1Open ↗
▸DOB NOWCalculations1
08/13/2026B01011949-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01011949-I1Open ↗