← Back
One story - permanent living quarter
83-11 258 STREET
QUEENS · BIN 4179357
💬 Discuss this project
1930Year Built
1Stories
A2Building Class
R2AZoning
832 sfGross Floor Area
1Units
One story - permanent living quarter · Owner of record: A AND R FUTURE LLC · 4,000 sf lot · 0.21 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof3p · 2 filings · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar3p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/29/2024$600K—— → —$721/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NASIR J, KHANZADA LLC402/26/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NASIR J. KHANZADA LLC803/21/2026
Building Lifecycle
All (38)Filed (4)Objection (4)Special Inspection (30)
04/06/2026
Special inspection requirement — Designated Seismic System
04/06/2026
Special inspection requirement — Subgrade Inspections
04/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
04/06/2026
Special inspection requirement — Mechanical Systems
04/06/2026
Special inspection requirement — Masonry
04/06/2026
Special inspection requirement — Concrete - Cast-In-Place
04/06/2026
Special inspection requirement — Construction Utilizing CLT or SCL, Type IV
04/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
04/06/2026
Special inspection requirement — Structural Wood Frame
04/06/2026
Special inspection requirement — Energy Code Compliance Inspections
04/06/2026
Special inspection requirement — Final
04/06/2026
Special inspection requirement — Fenestration air leakage
04/06/2026
Special inspection requirement — Interior lighting power
04/06/2026
Special inspection requirement — Ventilation and air distribution system
04/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
04/06/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
04/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
04/06/2026
Special inspection requirement — Insulation placement and R values
04/06/2026
Special inspection requirement — Air barrier - visual inspection
04/06/2026
Special inspection requirement — Maintenance information
04/06/2026
Special inspection requirement — Duct leakage testing, insulation and design
04/06/2026
Special inspection requirement — Protection of exposed foundation insulation
04/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
04/06/2026
Special inspection requirement — Fenestration areas
04/06/2026
Special inspection requirement — Permanent certificate
02/26/2026
Filed — Alteration CO
ALT-1 FILED FOR INTERIOR RENOVATION OF EXISTING ONE-FAMILY DWELLING WITH VERTICAL EXTENSION
Q01003631-P3
08/22/2024
Objection resolved — Addressed
05/08/2024
Filed — Alteration CO
ALT-1 FILED FOR INTERIOR RENOVATION OF EXISTING ONE-FAMILY DWELLING WITH VERTICAL EXTENSION
Q01003631-I1
05/01/2024
Objection raised — Other
04/19/2024
Objection raised — Scope
04/19/2024
Objection resolved — Addressed
04/09/2024
Filed — Alteration
PLUMBING FILLING INCONJUNCTION WITH ALT-1 FILE FOR INTERIOR RENOVATION OFEXISTING ONE FAMILY DWELLINGWITH VERTICAL EXTENSION
Q01004201-I1
04/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/09/2024
Special inspection requirement — HVAC-R and service water heating system controls
04/09/2024
Special inspection requirement — HVAC-R and service water heating equipment
04/09/2024
Special inspection requirement — Maintenance information
04/08/2024
Filed — Alteration
Q01004169-I1
Nothing on file for this building.
1 project · most recent 02/26/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
02/26/2026——Heating and Air Conditioning Systems
Heat / Cool
Gree PUMYP48NHMU-BS PUMYP36NKMU-BS 56,000 BTU · Vrf Outdoor ×4
1 project · most recent 04/09/2024
Gas Water/Sanitary
FiledStatusContractorScope
04/09/2024——Gas, Water/Sanitary
1 project · most recent 02/26/2026
Concrete Wood
FiledStatusContractorScope
02/26/2026——Concrete, Wood
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
04/06/2026Designated Seismic System—special
04/06/2026Subgrade Inspections—special
04/06/2026Structural Stability – Alterations of existing buildings—special
04/06/2026Mechanical Systems—special
04/06/2026Masonry—special
04/06/2026Concrete - Cast-In-Place—special
04/06/2026Construction Utilizing CLT or SCL, Type IV—special
04/06/2026Fire-Resistant Penetrations and Joints—special
04/06/2026Fire-Resistance Rated Construction—progress
04/06/2026Structural Wood Frame—progress
04/06/2026Energy Code Compliance Inspections—progress
04/06/2026Final—progress
04/06/2026Fenestration air leakage—energy_progress
04/06/2026Interior lighting power—energy_progress
04/06/2026Ventilation and air distribution system—energy_progress
04/06/2026HVAC-R and service water heating system controls—energy_progress
04/06/2026Fenestration and door U-factor and product ratings—energy_progress
04/06/2026HVAC-R and service water heating equipment—energy_progress
04/06/2026Insulation placement and R values—energy_progress
04/06/2026Air barrier - visual inspection—energy_progress
04/06/2026Maintenance information—energy_progress
04/06/2026Duct leakage testing, insulation and design—energy_progress
04/06/2026Protection of exposed foundation insulation—energy_progress
04/06/2026HVAC-R and service water piping design and insulation—energy_progress
04/06/2026Fenestration areas—energy_progress
Latest 25 of 31.
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/23/2026Q01004169-I1Request digital key ↗
08/23/2026Q01004201-I1Request digital key ↗
08/22/2026Q01003631-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/22/2026Q01003631-I1Open ↗
08/13/2026Q01003631-I1Open ↗
08/13/2026Q01003631-P3Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01003631-I1Open ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/23/2026Q01004169-I1Open ↗
08/23/2026Q01004201-I1Open ↗
08/13/2026Q01003631-P3Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026Q01003631-P3Open ↗
08/13/2026Q01003631-I1Open ↗
▸Other Documents8
▸DOB NOWProperty Ownership Certification2
08/13/2026Q01003631-P3Open ↗
08/13/2026Q01003631-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026Q01003631-I1Open ↗
08/13/2026Q01003631-P3Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q01003631-P3Open ↗
08/13/2026Q01003631-I1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q01003631-I1Open ↗
08/13/2026Q01003631-P3Open ↗