| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 03/29/2024 | $600K | — | — → — | $721/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| NASIR J, KHANZADA LLC | 4 | 02/26/2026 |
| Representative | Filings | Most Recent |
|---|---|---|
| NASIR J. KHANZADA LLC | 8 | 03/21/2026 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 02/26/2026 | — | — | Heating and Air Conditioning Systems | Heat / Cool Gree PUMYP48NHMU-BS
PUMYP36NKMU-BS 56,000 BTU · Vrf Outdoor ×4 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/09/2024 | — | — | Gas, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/26/2026 | — | — | Concrete, Wood |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 04/06/2026 | Designated Seismic System | — | special |
| 04/06/2026 | Subgrade Inspections | — | special |
| 04/06/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 04/06/2026 | Mechanical Systems | — | special |
| 04/06/2026 | Masonry | — | special |
| 04/06/2026 | Concrete - Cast-In-Place | — | special |
| 04/06/2026 | Construction Utilizing CLT or SCL, Type IV | — | special |
| 04/06/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 04/06/2026 | Fire-Resistance Rated Construction | — | progress |
| 04/06/2026 | Structural Wood Frame | — | progress |
| 04/06/2026 | Energy Code Compliance Inspections | — | progress |
| 04/06/2026 | Final | — | progress |
| 04/06/2026 | Fenestration air leakage | — | energy_progress |
| 04/06/2026 | Interior lighting power | — | energy_progress |
| 04/06/2026 | Ventilation and air distribution system | — | energy_progress |
| 04/06/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| 04/06/2026 | Fenestration and door U-factor and product ratings | — | energy_progress |
| 04/06/2026 | HVAC-R and service water heating equipment | — | energy_progress |
| 04/06/2026 | Insulation placement and R values | — | energy_progress |
| 04/06/2026 | Air barrier - visual inspection | — | energy_progress |
| 04/06/2026 | Maintenance information | — | energy_progress |
| 04/06/2026 | Duct leakage testing, insulation and design | — | energy_progress |
| 04/06/2026 | Protection of exposed foundation insulation | — | energy_progress |
| 04/06/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 04/06/2026 | Fenestration areas | — | energy_progress |