← Back
Elevator cooperative
Forest Park
83-55 WOODHAVEN BOULEVARD · BIN 4315343
💬 Discuss this project
1954Year Built
6Stories
D4Building Class
R5Zoning
385,000 sfGross Floor Area
390Units
LL97 CoveredRent Stabilized206 Open Violations 205 unresolved · 1 paperwork only ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · Owner of record: FOREST PARK COOP INC SEC 1 · 128,408 sf lot · 3 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
Floor 5Under Construction10p · 2 filings · 11 docs
Floor 4
Floor 3
Floor 2
Floor 1
14 jobs · most recent 06/04/2026
General Wiring
FiledStatusContractorScope
06/04/2026Permit IssuedTOPLINE ELECTRIC CORPGeneral Wiring
06/04/2026Permit IssuedTOPLINE ELECTRIC CORPGeneral Wiring
01/22/2026CompleteADAM ELECL CONTRNG LLC—
06/27/2025Permit IssuedTOWER ELECTRIC INC.—
06/17/2025Permit IssuedRAAM ELECTRICAL LLCGeneral Wiring
05/27/2025CompleteYT ELECTRIAL SERVICES INCGeneral Wiring
02/02/2025Permit IssuedV ELECTRIC NY INCGeneral Wiring
10/16/2024CompleteOGC ELECTRICAL CONTRACTORGeneral Wiring
08/09/2024Permit IssuedTOWER ELECTRIC INC.—
02/19/2024CompleteUS1 ELECTRIC CORPGeneral Wiring
06/04/2023CompleteEVS ELECTRIC CORPGeneral Wiring
02/06/2023CompleteGLENDALE ELECTL CONTNG INGeneral Wiring
08/19/2022CompletePOS ELECTRICAL CONTRS INCGeneral Wiring
11/17/2020CompleteKINGS ELECTRIC CO., INC.—
Building Lifecycle
All (143)Filed (14)Permit Issued (13)Signed Off (9)Facade (FISP) (12)Violation (60)Inspection (9)Objection (8)Special Inspection (18)
08/05/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/03/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/14/2026
Permit issued — General Construction
Q01390251-I1-GC
05/06/2026
Filed — Alteration
Q01390251-I1
05/01/2026
Violation issued (HPD, open)
A
04/22/2026
Special inspection requirement — Lighting in dwelling units
Esther Cheung
04/22/2026
Special inspection requirement — Energy Code Compliance Inspections
Esther Cheung
04/21/2026
Special inspection requirement — Final
Esther Cheung
04/07/2026
Signed off — Alteration
RENOVATING APARTMENT AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. BATHROOM: REPLACE TILES, FIXTURES AND FINISHES KITCHEN: REPLACE COUNTERTOP REPLACE CARPET AS PER PLAN.
Q01260141-I1
02/03/2026
Signed off — Alteration
Q00993512-I1
01/20/2026
Permit issued — General Construction
Q01260141-I1-GC
12/16/2025
Objection resolved — Addressed
12/03/2025
Signed off — Alteration
Herewith filed is the facade repair work as per plan filed herewith. Work inc.: Replace lintel; repair step crack, crack sills, crack brick; repair open mortar joint and missing caulk. No change in use, egress, or occupancy is involved under this appl.
Q01049499-I1
11/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
Younes Abouyaala
11/28/2025
Special inspection requirement — Masonry
Younes Abouyaala
11/28/2025
Special inspection requirement — Final
NAVEEN KUMAR
11/28/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
11/19/2025
Filed — Alteration
Herewith filed is the facade repair work as per plan filed herewith. Work inc.: Replace lintel; repair step crack, crack sills, crack brick; repair open mortar joint and missing caulk. No change in use, egress, or occupancy is involved under this appl.
Q01049499-P1
11/12/2025
Objection resolved — Addressed
11/03/2025
Signed off — Alteration
REMOVAL OF EXISTING FINISHES IN THE BATH AND KITCHEN. MINOR PARTITION MODIFICATION. MODIFICATION TO LIGHTING FIXTURES.. REPLACING INTERIOR DOORS, WINDOW SILLS, AND RADIATOR COVERS. ALL AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01185434-I1
10/31/2025
Violation issued (HPD, open)
A
10/27/2025
Objection raised — Scope
10/27/2025
Objection raised — Cost
09/30/2025
Filed — Alteration
RENOVATING APARTMENT AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. BATHROOM: REPLACE TILES, FIXTURES AND FINISHES KITCHEN: REPLACE COUNTERTOP REPLACE CARPET AS PER PLAN.
Q01260141-I1
09/22/2025
Permit issued — General Construction
Q01286871-I1-GC
09/18/2025
Filed — Alteration
APPLICATION FILE FOR INTERIOR RENOVATION WORK IN APARTMENT 5C ON THE 5TH FLOOR AS PER PLAN. THERE WILL BE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS FILING.
Q01286871-I1
09/13/2025
Special inspection requirement — Tenant Protection Plan Compliance
Md Rashid
09/13/2025
Special inspection requirement — Final
Md Rashid
07/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BALTU YORKOS
07/24/2025
Special inspection requirement — Tenant Protection Plan Compliance
BALTU YORKOS
07/24/2025
Special inspection requirement — Final
Jorge Fontan
07/18/2025
Permit issued — General Construction
Q01049499-I1-GC
05/25/2025
Violation issued (HPD, open)
A
04/28/2025
Signed off — Alteration
INTERIOR RENOVATION OF THE EXISTING APARTMENT #3D ON THE 3RD FLOOR INCLUDING REPLACEMENT OF PLUMBING FIXTURES, NEW FIXTURE, AND REPLACED GAS STOVE. NO CHANGE TO THE USE, EGRESS, OR OCCUPANCY.
Q01024757-S1
04/28/2025
Signed off — Alteration
INTERIOR RENOVATION OF THE EXISTING APARTMENT #3D ON THE 3RD FLOOR INCLUDING REPLACEMENT OF PLUMBING FIXTURES, NEW FIXTURE, AND REPLACED GAS STOVE. NO CHANGE TO THE USE, EGRESS, OR OCCUPANCY.
Q01024757-I1
04/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/31/2025
Permit issued — General Construction
Q01185434-I1-GC
03/31/2025
Violation issued (HPD, open)
C
03/31/2025
Violation issued (HPD, open)
C
03/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
bassam (sam) rimawi
03/17/2025
Permit issued — Sidewalk Shed
Q00993512-I1-SH
03/14/2025
Filed — Alteration
INTERIOR RENOVATION OF THE EXISTING APARTMENT #3D ON THE 3RD FLOOR INCLUDING REPLACEMENT OF PLUMBING FIXTURES, NEW FIXTURE, AND REPLACED GAS STOVE. NO CHANGE TO THE USE, EGRESS, OR OCCUPANCY.
Q01024757-P3
03/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
03/13/2025
Objection raised — Cost
03/13/2025
Objection resolved — Addressed
03/06/2025
Filed — Alteration
REMOVAL OF EXISTING FINISHES IN THE BATH AND KITCHEN. MINOR PARTITION MODIFICATION. MODIFICATION TO LIGHTING FIXTURES.. REPLACING INTERIOR DOORS, WINDOW SILLS, AND RADIATOR COVERS. ALL AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01185434-I1
02/24/2025
Special inspection requirement — Final
Thomas Vail
02/24/2025
Special inspection requirement — Tenant Protection Plan Compliance
bassam (sam) rimawi
02/15/2025
Filed — Alteration
INTERIOR RENOVATION OF THE EXISTING APARTMENT #3D ON THE 3RD FLOOR INCLUDING REPLACEMENT OF PLUMBING FIXTURES, NEW FIXTURE, AND REPLACED GAS STOVE. NO CHANGE TO THE USE, EGRESS, OR OCCUPANCY.
Q01024757-P1
01/31/2025
Signed off — Alteration
new non-loadbearing partitions as shown on plans. all plumbing work filed under separate application. no change to egress, use or occupancy.
Q01075876-I1
01/17/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/05/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/04/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/04/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/25/2024
Permit issued — Plumbing
Q01024757-S1-PL
10/21/2024
Permit issued — General Construction
Q01075876-I1-GC
10/13/2024
Violation issued (HPD, open)
A
10/13/2024
Violation issued (HPD, open)
A
10/13/2024
Violation issued (HPD, open)
A
Latest 60 of 143 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
METRO MANAGEMENT DEV907/08/2026
SKYWAY RESTORATION SERVICES404/09/2026
XINOS CONSTRUCTION504/09/2026
FOREST PARK COOP SEC 1503/22/2026
FOREST PARK COOP INC SEC503/22/2026
ELM MANAGEMENT ASSOC.103/22/2026
DJL ARCHITECT103/22/2026
FOREST PARK OWNERS CORP103/21/2026
FOREST PARK COOP SECTION 1103/21/2026
FOREST PARK CO-OP103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KX CONSULTING203/21/2026
OAMS ARCHITECTURAL DESIGN203/21/2026
HAQUE ASSOCIATES803/21/2026
XINOS CONSTRUCTION203/21/2026
DJL ARCHITECT103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
XINOS CONSTRUCTION CORPGeneral Contractor507/08/2026
SHEKO INCGeneral Contractor203/21/2026
GERDES HOME IMPROVEMENTSGeneral Contractor203/21/2026
AVRON CORPGeneral Contractor203/21/2026
DKR CONSTRUCTION CO CORPGeneral Contractor107/08/2026
PD CONSTRUCTION GROUP INCGeneral Contractor104/09/2026
SKYWAY REST. SERVICESGeneral Contractor104/09/2026
GLENDALE ELECTL CONTNG INElectrical103/22/2026
NEW YORK PLBG-HTG-COOLINGPlumbing107/08/2026
ROBERT MARCHISOTTOElectrical103/21/2026
V ELECTRIC NY INCElectrical103/22/2026
ANVA LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519411/19/2025
YORKOS ENGINEERING, DESIG6991109/30/2025
EMPIRE DESIGN CORP5474109/18/2025
TSS ENGINEERS4492204/29/2024
IP CONCRETE TESTING AND I6252102/21/2024
DARIO ARCHITECTURE &DESIG6878103/06/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedXINOS CONSTRUCTION CORP05/14/2026
DOB NOWGeneral ConstructionSigned-offPD CONSTRUCTION GROUP INC01/20/2026
DOB NOWGeneral ConstructionPermit IssuedSKYWAY REST. SERVICES09/22/2025
DOB NOWGeneral ConstructionSigned-offXINOS CONSTRUCTION CORP07/18/2025
DOB NOWGeneral ConstructionSigned-offANVA03/31/2025
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP03/17/2025
DOB NOWPlumbingSigned-offNEW YORK PLBG-HTG-COOLING11/25/2024
DOB NOWGeneral ConstructionSigned-offAVRON CORP10/21/2024
DOB NOWGeneral ConstructionSigned-offXINOS CONSTRUCTION CORP08/08/2024
DOB NOWGeneral ConstructionSigned-offDKR CONSTRUCTION CO CORP06/05/2024
DOB NOWGeneral ConstructionSigned-offGERDES HOME IMPROVEMENTS03/26/2024
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP01/22/2024
DOB NOWGeneral ConstructionSigned-offSHEKO INC03/17/2023
BISOTISSUEDCALANDRA ENTERPRISES INC05/25/2011
BISPLISSUEDM VASCELLARO INC12/15/1999
BISPLISSUEDAP PLUMBING & HVAC LLC06/19/1995
BISOTISSUEDMMI MECH.06/19/1995
BISOTISSUEDAPPLE INCINERATOR AND COMPACTOR07/19/1991
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
08/05/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/05/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/03/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/17/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/05/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/04/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/04/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/16/2023Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
04/22/2026Lighting in dwelling unitsEsther Cheungenergy_progress
04/22/2026Energy Code Compliance InspectionsEsther Cheungprogress
04/21/2026FinalEsther Cheungprogress
11/28/2025Tenant Protection Plan ComplianceYounes Abouyaalaspecial
11/28/2025MasonryYounes Abouyaalaspecial
11/28/2025FinalNAVEEN KUMARprogress
11/28/2025Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
09/13/2025Tenant Protection Plan ComplianceMd Rashidspecial
09/13/2025FinalMd Rashidprogress
07/24/2025Fire-Resistant Penetrations and JointsBALTU YORKOSspecial
07/24/2025Tenant Protection Plan ComplianceBALTU YORKOSspecial
07/24/2025FinalJorge Fontanprogress
03/26/2025Tenant Protection Plan Compliancebassam (sam) rimawispecial
03/14/2025Tenant Protection Plan Compliance—special
02/24/2025FinalThomas Vailprogress
02/24/2025Tenant Protection Plan Compliancebassam (sam) rimawispecial
07/03/2024FinalEsther Cheungprogress
02/19/2023Fire-Resistant Penetrations and JointsDario Pasquariellospecial
▾Documents — 68 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/25/2026Q00831768-I1Request digital key ↗
08/23/2026Q00993512-I1Request digital key ↗
08/23/2026Q01007464-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
05/26/2011420358981Open ↗
▸BISWORK PERMIT APPLICATION1
05/26/2011420358981Open ↗
▸Seals & Professional Certifications36
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/23/2026Q00993512-I1Open ↗
08/22/2026Q01024757-S1Open ↗
08/22/2026Q01024757-P3Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026Q01260141-I1Open ↗
09/01/2026Q01049499-I1Open ↗
08/28/2026Q01286871-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/22/2026Q00831768-I1Open ↗
09/01/2026Q01260141-I1Open ↗
09/01/2026Q01024757-S1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
05/26/2011420358981Open ↗
05/26/2011420358981Open ↗
05/26/2011420358981Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
05/26/2011420358981Open ↗
05/26/2011420358981Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/26/2011420358981Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/22/2026Q01024757-P3Open ↗
08/22/2026Q01024757-P1Open ↗
08/22/2026Q01024757-S1Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
05/26/2011420358981Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
05/26/2011420358981Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
05/26/2011420358981Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
05/26/2011420358981Open ↗