← Back
Two family converted from one family
83 16 STREET
BROOKLYN · BIN 3023882
💬 Discuss this project
1899Year Built
2Stories
B3Building Class
R6BZoning
1,800 sfGross Floor Area
2Units
Two family converted from one family · 1,808 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingOther
Roof15p · 3 filings · 20 docs
Floor 246p · 4 filings · 20 docs
Floor 129p · 3 filings · 20 docs
Basement20p · 2 filings · 20 docs
Sub-Basement11p · 1 filing · 10 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/16/2021$1.7M—— → —$944/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LLOYD NOEL BUILDING CONSULTANT1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TADKAR CONSTRUCTION INCGeneral Contractor607/08/2026
HENRY MYERS P & H, INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RYAN SPECIAL ENGINEERING2018602/13/2026
Building Lifecycle
All (55)Filed (10)Permit Issued (6)Inspection (7)Objection (2)Special Inspection (30)
02/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
02/13/2026
Filed — Alteration
Installation and removal of plumbing piping and fixtures for a renovated (2) family House. No change of use, egress occupancy under this application. See comment#24
B08015892-P2
12/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
09/15/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/17/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/01/2025
Permit issued — Plumbing
B08015892-I1-PL
01/07/2025
Permit issued — General Construction
B08015795-I1-GC
04/25/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/25/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/05/2024
Permit issued — General Construction
B08015795-I1-GC
03/19/2024
Permit issued — Mechanical Systems
B08015902-I1-MS
03/18/2024
Filed — Alteration CO
ALTERATION OF EXISTING RESIDENCE AND RECONFIGURE INTERIOR LAYOUT & STAIRS. REPLACEMENT OFDOORS, WINDOWS, & FACADE CLADDING. NEW NON-LOAD BEARING PARTITIONS WITH WALL & FLOOR FINISHES.
B08015795-P3
03/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
03/15/2024
Special inspection requirement — Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components
03/15/2024
Special inspection requirement — Energy Code Compliance Inspections
William Ryan
03/15/2024
Special inspection requirement — Fire-Resistance Rated Construction
William Ryan
02/29/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
02/29/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/29/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/26/2024
Permit issued — Structural
B08015935-I1-ST
01/30/2024
Permit issued — Plumbing
B08015892-I1-PL
01/11/2024
Special inspection requirement — Concrete - Cast-In-Place
William Ryan
01/11/2024
Special inspection requirement — Construction Operations Influencing Adjacent Structures
William Ryan
01/11/2024
Special inspection requirement — Wood – Prefabricated I-Joists
William Ryan
01/11/2024
Special inspection requirement — Structural Steel - Details
William Ryan
01/11/2024
Special inspection requirement — Masonry
William Ryan
01/11/2024
Special inspection requirement — Post-installed Anchors
William Ryan
01/11/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Ryan
01/11/2024
Special inspection requirement — Final
William Ryan
01/05/2024
Filed — Alteration
THE PROPOSED STRUCTURAL WORK INVOLVES REINFORCING THE EXISTING FLOOR JOISTS OF THE BUILDING. REINFORCING EXISTING STUD WALLS OF THE BUILDING. FRAMING FOR NEW STUD WALLS AND ROOF RAFTERS ON THE 2ND FLOOR AT THE REAR OF THE BUILDING.
B08015935-P1
12/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
12/28/2023
Special inspection requirement — Permanent certificate
William Ryan
12/28/2023
Special inspection requirement — Duct leakage testing, insulation and design
12/28/2023
Special inspection requirement — Mechanical Systems
William Ryan
12/28/2023
Special inspection requirement — HVAC-R and service water heating system controls
William Ryan
12/28/2023
Special inspection requirement — Maintenance information
William Ryan
12/28/2023
Special inspection requirement — HVAC-R and service water heating equipment
William Ryan
12/28/2023
Special inspection requirement — Final
William Ryan
12/28/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
William Ryan
12/19/2023
Objection raised — Zoning
12/19/2023
Objection resolved — Addressed
12/18/2023
Filed — Alteration
Installation and removal of plumbing piping and fixtures for a renovated (2) family House. No change of use, egress occupancy under this application. See comment#24
B08015892-P1
12/18/2023
Filed — Alteration
HVAC addition for renovation of an existing 2 family dwelling. No change of use, egress or occupancy under this application. See comment#24
B08015902-P1
12/15/2023
Filed — Alteration CO
ALTERATION OF EXISTING RESIDENCE AND RECONFIGURE INTERIOR LAYOUT & STAIRS. REPLACEMENT OFDOORS, WINDOWS, & FACADE CLADDING. NEW NON-LOAD BEARING PARTITIONS WITH WALL & FLOOR FINISHES.
B08015795-P2
12/07/2023
Special inspection requirement — Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components
12/07/2023
Special inspection requirement — Energy Code Compliance Inspections
12/07/2023
Special inspection requirement — Fire-Resistance Rated Construction
12/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/05/2023
Special inspection requirement — Mechanical Systems
03/20/2023
Filed — Alteration
THE PROPOSED STRUCTURAL WORK INVOLVES REINFORCING THE EXISTING FLOOR JOISTS OF THE BUILDING. REINFORCING EXISTING STUD WALLS OF THE BUILDING. FRAMING FOR NEW STUD WALLS AND ROOF RAFTERS ON THE 2ND FLOOR AT THE REAR OF THE BUILDING.
B08015935-I1
03/16/2023
Filed — Alteration
Installation and removal of plumbing piping and fixtures for a renovated (2) family House. No change of use, egress occupancy under this application. See comment#24
B08015892-I1
03/16/2023
Filed — Alteration
HVAC addition for renovation of an existing 2 family dwelling. No change of use, egress or occupancy under this application. See comment#24
B08015902-I1
03/08/2023
Filed — Alteration CO
ALTERATION OF EXISTING RESIDENCE AND RECONFIGURE INTERIOR LAYOUT & STAIRS. REPLACEMENT OFDOORS, WINDOWS, & FACADE CLADDING. NEW NON-LOAD BEARING PARTITIONS WITH WALL & FLOOR FINISHES.
B08015795-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedHENRY MYERS P & H, INC04/01/2025
DOB NOWGeneral ConstructionPermit IssuedTADKAR CONSTRUCTION INC01/07/2025
DOB NOWGeneral ConstructionPermit IssuedTADKAR CONSTRUCTION INC04/05/2024
DOB NOWMechanical SystemsPermit IssuedTADKAR CONSTRUCTION INC03/19/2024
DOB NOWStructuralSigned-offTADKAR CONSTRUCTION INC02/26/2024
DOB NOWPlumbingPermit IssuedHENRY MYERS P & H, INC01/30/2024
1 job · most recent 12/18/2023
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
12/18/2023Permit IssuedTADKAR CONSTRUCTION INCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MITSUBISHI 48,000 BTU · Condensing Unit ×1
MXZ-3C30NAH23 28,400 BTU · Vrf Outdoor ×1
1 job · most recent 02/13/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
02/13/2026Permit IssuedHENRY MYERS P & H, INCGas, Storm, Water/Sanitary
1 job · most recent 11/09/2023
FiledStatusContractorScope
11/09/2023Permit IssuedMAC ELECT'L CONTR. INC.2 meters, 2 new_meters
1 job · most recent 01/05/2024
Concrete Masonry Wood
FiledStatusContractorScope
01/05/2024Signed-offTADKAR CONSTRUCTION INCConcrete, Masonry, Wood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
09/15/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/17/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/25/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/25/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/29/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/29/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/29/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
02/23/2026Fire-Resistant Penetrations and JointsWilliam Ryanspecial
12/03/2025Fire-Resistant Penetrations and JointsWilliam Ryanspecial
03/15/2024Fire-Resistant Penetrations and JointsWilliam Ryanspecial
03/15/2024Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components—special
03/15/2024Energy Code Compliance InspectionsWilliam Ryanprogress
03/15/2024Fire-Resistance Rated ConstructionWilliam Ryanprogress
01/11/2024Concrete - Cast-In-PlaceWilliam Ryanspecial
01/11/2024Construction Operations Influencing Adjacent StructuresWilliam Ryanspecial
01/11/2024Wood – Prefabricated I-JoistsWilliam Ryanspecial
01/11/2024Structural Steel - DetailsWilliam Ryanspecial
01/11/2024MasonryWilliam Ryanspecial
01/11/2024Post-installed AnchorsWilliam Ryanspecial
01/11/2024Structural Stability – Alterations of existing buildingsWilliam Ryanspecial
01/11/2024FinalWilliam Ryanprogress
12/28/2023Fire-Resistant Penetrations and JointsWilliam Ryanspecial
12/28/2023Permanent certificateWilliam Ryanenergy_progress
12/28/2023Duct leakage testing, insulation and design—energy_progress
12/28/2023Mechanical SystemsWilliam Ryanspecial
12/28/2023HVAC-R and service water heating system controlsWilliam Ryanenergy_progress
12/28/2023Maintenance informationWilliam Ryanenergy_progress
12/28/2023HVAC-R and service water heating equipmentWilliam Ryanenergy_progress
12/28/2023FinalWilliam Ryanprogress
12/28/2023HVAC-R and service water piping design and insulationWilliam Ryanenergy_progress
12/07/2023Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components—special
12/07/2023Energy Code Compliance Inspections—progress
Latest 25 of 45.
▾Documents — 61 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/26/2026B08015902-P1Request digital key ↗
08/26/2026B08015902-I1Request digital key ↗
08/26/2026B08015892-P2Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026B08015795-P3Open ↗
08/13/2026B08015795-P2Open ↗
08/13/2026B08015795-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B08015795-P2Open ↗
08/13/2026B08015795-P3Open ↗
08/13/2026B08015795-I1Open ↗
▸Seals & Professional Certifications20
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/26/2026B08015892-P2Open ↗
08/26/2026B08015892-P1Open ↗
08/26/2026B08015892-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026B08015795-P3Open ↗
08/30/2026B08015902-I1Open ↗
08/30/2026B08015902-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026B08015892-I1Open ↗
09/01/2026B08015795-P3Open ↗
09/01/2026B08015892-P2Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026B08015795-P3Open ↗
08/13/2026B08015795-P2Open ↗
08/13/2026B08015795-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/26/2026B08015892-P2Open ↗
08/26/2026B08015892-I1Open ↗
08/26/2026B08015892-P1Open ↗
Showing 3 of 10 on file for this type
▸Other Documents12
▸DOB NOWSite Survey: Initial3
08/13/2026B08015795-P3Open ↗
08/13/2026B08015795-P2Open ↗
08/13/2026B08015795-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026B08015795-P3Open ↗
08/13/2026B08015795-I1Open ↗
08/13/2026B08015795-P2Open ↗
▸DOB NOWPlot Diagram3
08/13/2026B08015795-P3Open ↗
08/13/2026B08015795-P2Open ↗
08/13/2026B08015795-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/13/2026B08015795-I1Open ↗
08/13/2026B08015795-P2Open ↗
08/13/2026B08015795-P3Open ↗