← Back
Two stories - detached, small or mid-size
83-17 ST JAMES AVENUE
QUEENS · Elmhurst · BIN 4038704
💬 Discuss this project
1920Year Built
2.67Stories
A1Building Class
R5Zoning
1,458 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,250 sf lot · 0.65 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar2p · 1 filing · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BASIC GROUPS CORP703/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BASIC GROUPS CORP108/11/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PIPESTYLISTS, INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NY ACOM ENGINEERING PLLC7061108/11/2020
Building Lifecycle
All (10)Filed (1)Permit Issued (2)Signed Off (1)Special Inspection (6)
01/15/2021
Signed off — Alteration
Oil to Gas conversion on existing residential building, New HWH and boiler. replace one toilet and lav, no changes to use egress or occupancy.
Q00374670-I1
12/21/2020
Permit issued — Plumbing
Q00374670-I1-PL
08/13/2020
Permit issued — Plumbing
Q00374670-I1-PL
08/11/2020
Filed — Alteration
Oil to Gas conversion on existing residential building, New HWH and boiler. replace one toilet and lav, no changes to use egress or occupancy.
Q00374670-I1
08/11/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
YING JIANG
08/11/2020
Special inspection requirement — Energy Code Compliance Inspections
YING JIANG
08/11/2020
Special inspection requirement — Fire-Resistance Rated Construction
YING JIANG
08/11/2020
Special inspection requirement — HVAC and service water heating system controls
YING JIANG
08/11/2020
Special inspection requirement — HVAC insulation and sealing
YING JIANG
08/11/2020
Special inspection requirement — HVAC and service water heating equipment
YING JIANG
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offT & T PLUMBING INC12/21/2020
DOB NOWPlumbingSigned-offT & T PLUMBING INC08/13/2020
BISOTISSUEDSMVP MGMT INC08/14/2020
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
08/11/2020Fire-Resistant Penetrations and JointsYING JIANGspecial
08/11/2020Energy Code Compliance InspectionsYING JIANGprogress
08/11/2020Fire-Resistance Rated ConstructionYING JIANGprogress
08/11/2020HVAC and service water heating system controls YING JIANGenergy_progress
08/11/2020HVAC insulation and sealing YING JIANGenergy_progress
08/11/2020HVAC and service water heating equipment YING JIANGenergy_progress
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch - Plumbing1
08/28/2026Q00374670-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
08/11/2020440616399Open ↗
▸BISWORK PERMIT APPLICATION1
08/14/2020440616399Open ↗
▸Seals & Professional Certifications10
▸DOB NOWProgress Inspector Seal & Signature5
08/28/2026Q00374670-I1Open ↗
08/28/2026Q00374670-I1Open ↗
08/28/2026Q00374670-I1Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/11/2020440616399Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/11/2020440616399Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/11/2020440616399Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/28/2026Q00374670-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026Q00374670-I1Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES1
08/11/2020440616399Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026Q00374670-I1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/11/2020440616399Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/28/2026Q00374670-I1Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
01/11/2021440616399Open ↗
08/11/2020440616399Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/11/2020440616399Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/11/2021440616399Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00374670-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
01/11/2021440616399Open ↗
08/11/2020440616399Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/11/2021440616399Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
01/11/2021440616399Open ↗
08/11/2020440616399Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
08/11/2020440616399Open ↗