2 Open Violations 0 unresolved · 2 paperwork only▸
ECB12/22/2010FAILURE TO MAINTAIN STORM DRAINAGE.NOTED:OBSERVED @ TIME OF INSPECTION@ EXPOSURE#2 FRONT & REAR SIDE INSTALLATION ON NEW PVC PIPES CONNECTEDTO THE ROOF LEADERS AND DRAIN THE RAIN WATER INTO THHE SDWLK,CREATINGNothing owed — awaiting certificate of correction
ECB09/24/2008WORK WITHOUT A PERMIT. AT TIME OF INSP. OBSERVED AT REAR OF PREMISES INSTALLATION OF A WOOD COMPOSITE DECK. DECK IS APPROX. 8'X 15' & HAS AN ELEVATION APPROX. 3' ABOVE GRADE. DECK IS 100% COMPLETE. REMEDY:OBTNothing owed — awaiting certificate of correction
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.