1945Year Built
1.5Stories
A0Building Class
R2AZoning
1,214 sfGross Floor Area
1Units
Cape Cod · 4,000 sf lot · 0.3 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 11p · 1 filing · 12 docs
Cellar2p · 1 filing · 15 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/19/2019$654K—Private party → Private party$539/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ANAND J. SOLANKI, P.E.403/25/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KIRPA INCGeneral Contractor303/21/2026
AJIT ONE MECH&GEN'L CONTRPlumbing107/08/2026
SAMUEL & SONS P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ANAND J. SOLANKI, P.E.3662403/25/2022
Building Lifecycle
All (27)Filed (4)Permit Issued (3)Signed Off (2)Special Inspection (18)
07/18/2022
Signed off — Alteration
INSTALLATION OF NEW FULL BATHROOM, LAUNDRY ROOM, METER ROOM AND BOILER ROOM IN CELLAR. RESTRICTIVE DECLARATION FILED WITH NYC DEPARTMENT OF FINANCE OFFICE OF THE CITY REGISTRY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00568374-I1
07/15/2022
Signed off — Alteration
INSTALLATION OF NEW FULL BATHROOM (TOILET, SINK & SHOWER), BOILER ROOM GAS EQUIPMENT AND LAUNDRY (WASHER, DRYER & SLOP SINK) IN CELLAR.
Q00568492-I1
03/25/2022
Filed — Alteration
INSTALLATION OF NEW FULL BATHROOM, LAUNDRY ROOM, METER ROOM AND BOILER ROOM IN CELLAR. RESTRICTIVE DECLARATION FILED WITH NYC DEPARTMENT OF FINANCE OFFICE OF THE CITY REGISTRY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00568374-P1
03/25/2022
Filed — Alteration
INSTALLATION OF NEW FULL BATHROOM (TOILET, SINK & SHOWER), BOILER ROOM GAS EQUIPMENT AND LAUNDRY (WASHER, DRYER & SLOP SINK) IN CELLAR.
Q00568492-P1
03/25/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anand Solanki
03/25/2022
Special inspection requirement — Energy Code Compliance Inspections
Anand Solanki
03/25/2022
Special inspection requirement — Maintenance information
Anand Solanki
03/25/2022
Special inspection requirement — HVAC-R and service water heating equipment
Anand Solanki
03/25/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Anand Solanki
03/25/2022
Special inspection requirement — HVAC-R and service water heating system controls
Anand Solanki
03/25/2022
Special inspection requirement — Final
Anand Solanki
03/25/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anand Solanki
03/25/2022
Special inspection requirement — Energy Code Compliance Inspections
Anand Solanki
03/25/2022
Special inspection requirement — Fire-Resistance Rated Construction
Anand Solanki
03/25/2022
Special inspection requirement — Interior lighting power
Anand Solanki
03/25/2022
Special inspection requirement — Air barrier - visual inspection
Anand Solanki
01/14/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anand Solanki
01/14/2022
Special inspection requirement — Energy Code Compliance Inspections
Anand Solanki
01/14/2022
Special inspection requirement — Maintenance information
Anand Solanki
01/14/2022
Special inspection requirement — HVAC-R and service water heating equipment
Anand Solanki
01/14/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Anand Solanki
01/14/2022
Special inspection requirement — HVAC-R and service water heating system controls
Anand Solanki
11/18/2021
Permit issued — Plumbing
Q00568492-I1-PL
10/14/2021
Permit issued — General Construction
Q00568374-I1-GC
09/20/2021
Permit issued — Plumbing
Q00568492-I1-PL
08/20/2021
Filed — Alteration
INSTALLATION OF NEW FULL BATHROOM, LAUNDRY ROOM, METER ROOM AND BOILER ROOM IN CELLAR. RESTRICTIVE DECLARATION FILED WITH NYC DEPARTMENT OF FINANCE OFFICE OF THE CITY REGISTRY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00568374-I1
08/20/2021
Filed — Alteration
INSTALLATION OF NEW FULL BATHROOM (TOILET, SINK & SHOWER), BOILER ROOM GAS EQUIPMENT AND LAUNDRY (WASHER, DRYER & SLOP SINK) IN CELLAR.
Q00568492-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offSAMUEL & SONS P & H INC11/18/2021
DOB NOWGeneral ConstructionSigned-offKIRPA INC10/14/2021
DOB NOWPlumbingSigned-offHAR JI PLUMBING& HEAT COR09/20/2021
1 project · most recent 06/22/2022
General Wiring
FiledStatusContractorScope
06/22/2022CompleteAUJLA ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/27/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/27/2021Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/27/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/27/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/27/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
03/25/2022Fire-Resistant Penetrations and JointsAnand Solankispecial
03/25/2022Energy Code Compliance InspectionsAnand Solankiprogress
03/25/2022Maintenance informationAnand Solankienergy_progress
03/25/2022HVAC-R and service water heating equipmentAnand Solankienergy_progress
03/25/2022HVAC-R and service water piping design and insulationAnand Solankienergy_progress
03/25/2022HVAC-R and service water heating system controlsAnand Solankienergy_progress
03/25/2022FinalAnand Solankiprogress
03/25/2022Structural Stability – Alterations of existing buildingsAnand Solankispecial
03/25/2022Energy Code Compliance InspectionsAnand Solankiprogress
03/25/2022Fire-Resistance Rated ConstructionAnand Solankiprogress
03/25/2022Interior lighting powerAnand Solankienergy_progress
03/25/2022Air barrier - visual inspectionAnand Solankienergy_progress
01/14/2022Fire-Resistant Penetrations and JointsAnand Solankispecial
01/14/2022Energy Code Compliance InspectionsAnand Solankiprogress
01/14/2022Maintenance informationAnand Solankienergy_progress
01/14/2022HVAC-R and service water heating equipmentAnand Solankienergy_progress
01/14/2022HVAC-R and service water piping design and insulationAnand Solankienergy_progress
01/14/2022HVAC-R and service water heating system controlsAnand Solankienergy_progress
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/27/2026Q00568492-I1Request digital key ↗
08/27/2026Q00568492-P1Request digital key ↗
08/26/2026Q00568374-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWRestrictive Declaration/Easement 14
08/13/2026Q00568374-I1Open ↗
08/13/2026Q00568492-P1Open ↗
08/13/2026Q00568374-P1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature6
08/29/2026Q00568492-I1Open ↗
08/29/2026Q00568492-I1Open ↗
08/27/2026Q00568492-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026Q00568374-I1Open ↗
08/26/2026Q00568374-P1Open ↗
08/13/2026Q00568492-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/29/2026Q00568492-I1Open ↗
08/27/2026Q00568492-P1Open ↗
08/23/2026Q00568374-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026Q00568374-I1Open ↗
08/26/2026Q00568374-P1Open ↗
08/13/2026Q00568492-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00568374-I1Open ↗
08/13/2026Q00568492-I1Open ↗