← Back
BuildNYC
Two stories - detached, small or mid-size
83-33 241ST STREET
QUEENS · Bellerose · BIN 4165803
💬 Discuss this project
1950Year Built
2Stories
A1Building Class
R2AZoning
2,497 sfGross Floor Area
1Units
1 Active Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · 5,000 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 1 filing · 20 docs
Floor 2Under Construction12p · 1 filing · 20 docs
Floor 1Under Construction35p · 1 filing · 20 docs
CellarUnder Construction13p · 1 filing · 20 docs
Site & exteriorConstruction fence and footingUnder Construction7p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/15/2023$745K—— → —$298/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Associates810/02/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S Y Consulting Violations403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FS ContractingGeneral Contractor504/09/2026
Hasan A SalimGeneral Contractor303/21/2026
C.R.U. Mechan & HeatingPlumbing207/08/2026
Hasan A SalimScaffold107/08/2026
Dynamic Plumbing & SprinklerPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A & T Design Group1088610/02/2026
Building Lifecycle
All (87)Filed (8)Permit Issued (8)Signed Off (3)Violation (5)Inspection (7)Objection (26)Special Inspection (30)
10/09/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
propose horizontal and vertical extension on one family house. obtain new certificate of occupancy
Q00945946-S5
10/02/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
propose horizontal and vertical extension on one family house. obtain new certificate of occupancy
Q00945946-P7
09/16/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
ROBERT LIN
09/16/2026
Special inspection requirement — Structural Wood Frame
ROBERT LIN
09/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT LIN
09/16/2026
Special inspection requirement — Structural Steel - Details
ROBERT LIN
09/16/2026
Special inspection requirement — Protection of exposed foundation insulation
ROBERT LIN
09/16/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
ROBERT LIN
09/16/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
09/16/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
ROBERT LIN
09/16/2026
Special inspection requirement — Energy Code Compliance Inspections
ROBERT LIN
09/16/2026
Special inspection requirement — Final
ROBERT LIN
09/16/2026
Special inspection requirement — Structural Steel - High Strength Bolting
ROBERT LIN
09/16/2026
Special inspection requirement — Concrete - Cast-In-Place
ROBERT LIN
09/16/2026
Special inspection requirement — Structural Steel - Welding
ROBERT LIN
09/16/2026
Special inspection requirement — Permanent certificate
ROBERT LIN
09/16/2026
Special inspection requirement — Electric vehicle service equipment requirements
ROBERT LIN
09/16/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
ROBERT LIN
09/16/2026
Special inspection requirement — Air barrier — testing
ROBERT LIN
09/16/2026
Special inspection requirement — Air barrier - visual inspection
ROBERT LIN
09/16/2026
Special inspection requirement — Fenestration air leakage
ROBERT LIN
09/16/2026
Special inspection requirement — Interior lighting power
ROBERT LIN
09/16/2026
Special inspection requirement — Metering
ROBERT LIN
09/16/2026
Special inspection requirement — Insulation placement and R values
ROBERT LIN
09/16/2026
Special inspection requirement — Fenestration areas
ROBERT LIN
09/16/2026
Special inspection requirement — Footing and Foundation
ROBERT LIN
08/24/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
08/13/2026
Inspection — Fail Curb Cut Non-Directive 14
Fail
View inspection ↗
04/21/2026
Signed off — Alteration
Q00991254-I1
04/07/2026
Violation issued (ECB, closed)
Construction
04/07/2026
Violation issued (ECB, closed)
Construction
04/07/2026
Violation issued (ECB, closed)
Construction
04/07/2026
Violation issued (ECB, closed)
Construction
04/07/2026
Violation issued (ECB, open)
Construction
04/06/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
propose horizontal and vertical extension on one family house. obtain new certificate of occupancy
Q00945946-S4
01/02/2026
Permit issued — Earth Work
Q00945946-I1-GC-CX
01/02/2026
Permit issued — Curb Cut
Q00945946-S5-CC
01/02/2026
Permit issued — Mechanical Systems
Q00945946-S4-MS
12/29/2025
Permit issued — Plumbing
Q00945946-S2-PL
06/23/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/03/2025
Objection resolved — Addressed
05/30/2025
Objection raised — Admin
05/15/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
propose horizontal and vertical extension on one family house. obtain new certificate of occupancy
Q00945946-P6
05/14/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
ROBERT LIN
05/14/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
ROBERT LIN
05/14/2025
Special inspection requirement — Energy Code Compliance Inspections
ROBERT LIN
05/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT LIN
05/14/2025
Special inspection requirement — Maintenance information
ROBERT LIN
05/14/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ROBERT LIN
05/06/2025
Permit issued — Plumbing
Q00945946-S2-PL
05/05/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/18/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/18/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/12/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
propose horizontal and vertical extension on one family house. obtain new certificate of occupancy
Q00945946-S5
10/15/2024
Permit issued — Plumbing
Q00945946-S2-PL
07/22/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
propose horizontal and vertical extension on one family house. obtain new certificate of occupancy
Q00945946-S4
04/25/2024
Objection resolved — Addressed
04/25/2024
Objection resolved — Addressed
04/10/2024
Objection resolved — Addressed
Latest 60 of 87 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWEarth WorkPermit IssuedFS Contracting01/02/2026
DOB NOWCurb CutSigned-offFS Contracting01/02/2026
DOB NOWMechanical SystemsSigned-offFS Contracting01/02/2026
DOB NOWPlumbingSigned-offCitywide Plumbing & Heating & SPKLS12/29/2025
DOB NOWPlumbingSigned-offC.R.U. Mechan & Heating05/06/2025
DOB NOWPlumbingSigned-offC.R.U. Mechan & Heating10/15/2024
DOB NOWEarth WorkPermit IssuedHasan A Salim03/19/2024
DOB NOWConstruction FenceSigned-offHasan A Salim02/20/2024
1 project · most recent 10/02/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/02/2026Permit IssuedFS ContractingHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin ×1
Mrcool DIY-MULTI4-36HP230C 28,400 BTU · Condensing Unit ×1
DIY-MULTI5-48HP230C 42,000 BTU · Condensing Unit ×1
Ventilation
Greenheck SP-B110 50 CFM · Exhaust Fan ×4
1 project · most recent 10/02/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/02/2026Signed-offDynamic Plumbing & SprinklerGas, Storm, Water/Sanitary
2 projects · most recent 10/16/2026
General Wiring
FiledStatusContractorScope
10/16/2026Permit IssuedTimothy Coleman LicensedGeneral Wiring
03/29/2024Permit IssuedPower Key ElectricGeneral Wiring
1 project · most recent 10/02/2026
Steel Concrete Wood
FiledStatusContractorScope
10/02/2026Signed-offFS ContractingSteel, Concrete, Wood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
08/24/2026Fail-Final CND-Occupancy InspectionFailView ↗
08/13/2026Fail Curb Cut Non-Directive 14FailView ↗
06/23/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/05/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/18/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/18/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 62
DateRequirementInspectorRole
09/16/2026Concrete - Cast-In-PlaceROBERT LINspecial
09/16/2026Excavations - Sheeting, Shoring, and BracingROBERT LINspecial
09/16/2026Exterior Insulation and Finish Systems (EIFS)ROBERT LINspecial
09/16/2026Structural Stability – Alterations of existing buildingsROBERT LINspecial
09/16/2026Structural Steel - DetailsROBERT LINspecial
09/16/2026Structural Steel - High Strength BoltingROBERT LINspecial
09/16/2026Structural Steel - WeldingROBERT LINspecial
09/16/2026Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
09/16/2026Wall Panels, Curtain Walls, and VeneersROBERT LINspecial
09/16/2026Energy Code Compliance InspectionsROBERT LINprogress
09/16/2026FinalROBERT LINprogress
09/16/2026Footing and FoundationROBERT LINprogress
09/16/2026Structural Wood FrameROBERT LINprogress
09/16/2026Permanent certificateROBERT LINenergy_progress
09/16/2026Protection of exposed foundation insulationROBERT LINenergy_progress
09/16/2026Electric vehicle service equipment requirementsROBERT LINenergy_progress
09/16/2026Fenestration and door U-factor and product ratingsROBERT LINenergy_progress
09/16/2026Air barrier — testing ROBERT LINenergy_progress
09/16/2026Air barrier - visual inspectionROBERT LINenergy_progress
09/16/2026Fenestration air leakageROBERT LINenergy_progress
09/16/2026Interior lighting powerROBERT LINenergy_progress
09/16/2026MeteringROBERT LINenergy_progress
09/16/2026Insulation placement and R valuesROBERT LINenergy_progress
09/16/2026Fenestration areasROBERT LINenergy_progress
05/14/2025HVAC-R and service water heating equipmentROBERT LINenergy_progress
Latest 25 of 62.
▾Documents — 78 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/23/2026Q00991254-I1Request digital key ↗
08/21/2026Q00945946-P6Request digital key ↗
08/21/2026Q00945946-S5Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
01/23/2025440815717Open ↗
01/21/2025440815717Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
03/25/2025440815717Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram3
10/04/2026Q00945946-P7Open ↗
08/13/2026Q00945946-P3Open ↗
08/13/2026Q00945946-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
10/04/2026Q00945946-P7Open ↗
08/13/2026Q00945946-P3Open ↗
08/13/2026Q00945946-I1Open ↗
▸Seals & Professional Certifications33
▸DOB NOWProgress Inspector Seal & Signature13
10/04/2026Q00945946-P7Open ↗
10/04/2026Q00945946-P7Open ↗
10/04/2026Q00945946-P7Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
10/04/2026Q00945946-P7Open ↗
10/04/2026Q00945946-P7Open ↗
10/04/2026Q00945946-P7Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
10/04/2026Q00945946-P7Open ↗
08/23/2026Q00991254-I1Open ↗
08/21/2026Q00945946-P6Open ↗
Showing 3 of 8 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/12/2024440815717Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/12/2024440815717Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
03/03/2025440815717Open ↗
▸DOB NOWStreet Tree Checklist1
10/04/2026Q00945946-P7Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
10/04/2026Q00945946-P7Open ↗
08/21/2026Q00945946-P6Open ↗
08/21/2026Q00945946-S5Open ↗
Showing 3 of 7 on file for this type
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
10/04/2026Q00945946-P7Open ↗
08/13/2026Q00945946-I1Open ↗
08/13/2026Q00945946-P3Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00945946-I1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q00945946-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
01/12/2024440815717Open ↗
▸Other Documents14
▸DOB NOWSite Survey: Initial3
10/04/2026Q00945946-P7Open ↗
08/13/2026Q00945946-P3Open ↗
08/13/2026Q00945946-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
10/04/2026Q00945946-P7Open ↗
08/13/2026Q00945946-I1Open ↗
08/13/2026Q00945946-P3Open ↗
▸DOB NOWProperty Ownership Certification3
10/04/2026Q00945946-P7Open ↗
08/21/2026Q00945946-I1Open ↗
08/14/2026Q00945946-P3Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
03/18/2025440815717Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
03/18/2025440815717Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
03/18/2025440815717Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
03/03/2025440815717Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00945946-I1Open ↗