83 4 PLACE
BROOKLYN · BIN 3005427
💬 Discuss this project
1900Year Built
3Stories
C3Building Class
R6BZoning
2,550 sfGross Floor Area
4Units
Rent Stabilized1 Open Violation ▸
Four families · 2,125 sf lot · 1.2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionLandscapeCivil
Roof4p · 4 filings · 20 docs
Floor 327p · 3 filings · 20 docs
Floor 221p · 1 filing · 16 docs
Floor 122p · 3 filings · 20 docs
Cellar32p · 5 filings · 20 docs
Basement24p · 2 filings · 19 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/26/2022$3.1M—Private party → Private party$1,222/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NY BUILDING ASSOCIATES INC210/03/2025
LYNNE BRESLIN ARCHITECTS607/03/2025
SOCOTEC, INC.103/29/2023
PRUDIGM ENGINEERING LLC103/15/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JENNY FLORES EXPEDITING803/21/2026
BROOKLYN SOLARWORKS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
D & D COMPANY, INCGeneral Contractor1407/08/2026
ORBIT SPRINKLER CORPFire Protection107/08/2026
BROOKLYN SOLARWORKS LLCGeneral Contractor107/08/2026
AMN PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244210/03/2025
SOCOTEC ENGINEERING4983807/03/2025
PRUDIGM ENGINEERING LLCU4304103/15/2023
Building Lifecycle
All (102)Filed (10)Permit Issued (9)Signed Off (6)Violation (9)Inspection (7)Objection (32)Special Inspection (29)
04/30/2026
Violation issued (HPD, open)
A
02/27/2026
Signed off — Alteration CO
HEREBY FILING FOR RENOVATION AND CONVERSION FROM 4 TO 3 DWELLING UNITS.
B00814009-I1
10/16/2025
Signed off — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01196072-I1
10/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
10/15/2025
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
10/15/2025
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
10/15/2025
Special inspection requirement — Final
NARESH MAHANGU
10/15/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
10/03/2025
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01196072-P1
08/20/2025
Signed off — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION WITH ALTERATION CO B00814009. INSTALLATION OF FIXTURES
B00814013-I1
08/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
08/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
07/25/2025
Objection resolved — Addressed
07/25/2025
Objection resolved — Addressed
07/15/2025
Objection raised — Cost
07/15/2025
Objection raised — Scope
07/03/2025
Filed — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION WITH ALTERATION CO B00814009. INSTALLATION OF FIXTURES
B00814013-P2
06/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
06/25/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
03/31/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/25/2025
Permit issued — Solar
B01196072-I1-SL
03/20/2025
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01196072-I1
01/28/2025
Signed off — Alteration
FILING FOR INSTALLATION OF FIRE SPRINKLER SYSTEM THROUGHOUT THE BUILDING. FILED IN CONJUNCTION WITH ALTERATION CO APPLICATION# B00814009-I1.
B00831858-I1
01/14/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/09/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/06/2025
Signed off — Alteration
B00814017-I1
12/19/2024
Signed off — Alteration
B00830946-I1
10/09/2024
Objection resolved — Addressed
10/03/2024
Objection resolved — Addressed
09/06/2024
Objection raised — Zoning
08/30/2024
Filed — Alteration CO
HEREBY FILING FOR RENOVATION AND CONVERSION FROM 4 TO 3 DWELLING UNITS.
B00814009-P1
08/29/2024
Special inspection requirement — Insulation placement and R values
ALEXIS SCHLESSINGERMAN
08/29/2024
Special inspection requirement — Lighting in dwelling units
ALEXIS SCHLESSINGERMAN
08/29/2024
Special inspection requirement — Exterior lighting power
ALEXIS SCHLESSINGERMAN
08/29/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
ALEXIS SCHLESSINGERMAN
08/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
08/29/2024
Special inspection requirement — Lighting controls
ALEXIS SCHLESSINGERMAN
08/29/2024
Special inspection requirement — Fire-Resistance Rated Construction
ALEXIS SCHLESSINGERMAN
08/29/2024
Special inspection requirement — Interior lighting power
ALEXIS SCHLESSINGERMAN
08/29/2024
Special inspection requirement — Energy Code Compliance Inspections
ALEXIS SCHLESSINGERMAN
08/21/2024
Objection raised — Scope
08/15/2024
Filed — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION WITH ALTERATION CO B00814009. INSTALLATION OF FIXTURES
B00814013-P1
08/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
08/13/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
07/29/2024
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
06/18/2024
Permit issued — Structural
B00830946-I1-ST
06/18/2024
Permit issued — General Construction
B00814009-I1-GC
06/18/2024
Permit issued — Mechanical Systems
B00814017-I1-MS
04/03/2024
Violation issued (HPD, closed)
A
04/03/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/27/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/27/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/13/2024
Permit issued — Sprinklers
B00831858-I1-EW-SP
01/23/2024
Permit issued — Mechanical Systems
B00814017-I1-MS
01/23/2024
Permit issued — Plumbing
B00814013-I1-PL
07/29/2023
Permit issued — Structural
B00830946-I1-ST
07/06/2023
Permit issued — General Construction
B00814009-I1-GC
04/04/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
03/29/2023
Filed — Alteration
B00830946-I1
03/27/2023
Special inspection requirement — Structural Wood Frame
ALEXIS SCHLESSINGERMAN
Latest 60 of 102 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offBROOKLYN SOLARWORKS LLC03/25/2025
DOB NOWStructuralSigned-offD & D COMPANY, INC06/18/2024
DOB NOWGeneral ConstructionPermit IssuedD & D COMPANY, INC06/18/2024
DOB NOWMechanical SystemsSigned-offD & D COMPANY, INC06/18/2024
DOB NOWSprinklersSigned-offORBIT SPRINKLER CORP02/13/2024
DOB NOWMechanical SystemsSigned-offD & D COMPANY, INC01/23/2024
DOB NOWPlumbingSigned-offAMN PLUMBING CORP01/23/2024
DOB NOWStructuralSigned-offD & D COMPANY, INC07/29/2023
DOB NOWGeneral ConstructionPermit IssuedD & D COMPANY, INC07/06/2023
3 projects · most recent 03/17/2025
General Wiring
FiledStatusContractorScope
03/17/2025CompleteBROOKYLN SOLARWORKS, LLC—
07/31/2023CompleteDENMAR ELECTRIC CORPGeneral Wiring
08/08/2022CompleteCHL ELECT CONTRACTOR INCGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
03/31/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/14/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/09/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/29/2024Fail-Final PL - Up to 9 Requested FloorsFailView ↗
04/03/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/27/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/27/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
10/15/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
10/15/2025Air barrier - visual inspectionNARESH MAHANGUenergy_progress
10/15/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
10/15/2025FinalNARESH MAHANGUprogress
10/15/2025Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
08/05/2025HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
08/05/2025Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
06/25/2025Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
06/25/2025HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
08/29/2024Insulation placement and R valuesALEXIS SCHLESSINGERMANenergy_progress
08/29/2024Lighting in dwelling unitsALEXIS SCHLESSINGERMANenergy_progress
08/29/2024Exterior lighting powerALEXIS SCHLESSINGERMANenergy_progress
08/29/2024Fenestration and door U-factor and product ratingsALEXIS SCHLESSINGERMANenergy_progress
08/29/2024Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
08/29/2024Lighting controlsALEXIS SCHLESSINGERMANenergy_progress
08/29/2024Fire-Resistance Rated ConstructionALEXIS SCHLESSINGERMANprogress
08/29/2024Interior lighting powerALEXIS SCHLESSINGERMANenergy_progress
08/29/2024Energy Code Compliance InspectionsALEXIS SCHLESSINGERMANprogress
08/13/2024Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
08/13/2024HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
04/04/2023Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
03/27/2023Structural Wood FrameALEXIS SCHLESSINGERMANprogress
03/27/2023Construction Operations Influencing Adjacent StructuresALEXIS SCHLESSINGERMANspecial
03/27/2023Subsurface Conditions – Fill Placement & In-Place DensityALEXIS SCHLESSINGERMANspecial
03/27/2023Subgrade InspectionsALEXIS SCHLESSINGERMANspecial
Latest 25 of 29.
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/27/2026B00814017-I1Request digital key ↗
08/27/2026B00831858-I1Request digital key ↗
08/27/2026B00830946-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00814009-I1Open ↗
▸Seals & Professional Certifications24
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/27/2026B00814017-I1Open ↗
08/27/2026B00830946-I1Open ↗
08/24/2026B00814013-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/27/2026B00814013-I1Open ↗
09/01/2026B00814013-P1Open ↗
08/26/2026B01196072-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/27/2026B00814013-I1Open ↗
09/01/2026B00814013-P1Open ↗
08/26/2026B01196072-I1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/13/2026B00814009-P1Open ↗
08/13/2026B00814009-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00814009-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/20/2026B01196072-P1Open ↗
08/20/2026B01196072-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/24/2026B00814009-I1Open ↗
08/13/2026B00814013-I1Open ↗
▸Approvals, Objections & Sign-offs6
▸DOB NOWDEP Variance (V5) letter5
08/27/2026B00814017-I1Open ↗
08/13/2026B00831858-I1Open ↗
08/13/2026B00814009-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01196072-I1Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification2
08/24/2026B00814009-P1Open ↗
08/24/2026B00814009-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00814009-I1Open ↗