← Back
Cape Cod
83-41 LITTLE NECK PARKWAY
QUEENS · Glen Oaks-Floral Park-New Hyde Park · BIN 4179258
💬 Discuss this project
1945Year Built
1.5Stories
A0Building Class
R2AZoning
893 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Cape Cod · Owner of record: 8341 STREET LLC · 3,760 sf lot · 0.24 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 20 docs
Floor 25p · 1 filing · 20 docs
Floor 15p · 1 filing · 20 docs
Cellar5p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/06/2025$670K—Private party → 8341 STREET LLC$750/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAKHTIAR SHAMLOO308/26/2026
TABRIZ DESIGN GROUP303/02/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TABRIZ GROUP ENTERPRISE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUSTOMBUILT HOMES INCGeneral Contractor307/08/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TABRIZ GROUP ENTERPRISES3275508/26/2026
IP CONCRETE TESTING AND I6252203/02/2026
Building Lifecycle
All (53)Filed (6)Permit Issued (3)Signed Off (2)Violation (1)Inspection (5)Objection (6)Special Inspection (30)
08/26/2026
Filed — Alteration CO
PROPOSED HORIZONTAL AND VERTICAL ENLARGEMENT TO EXISTING ONE STORY & CELLAR, ONE FAMILY TO REMAIN.
Q01237075-P2
08/25/2026
Special inspection requirement — Metering
BAKHTIAR SHAMLOO
08/25/2026
Special inspection requirement — Electric vehicle service equipment requirements
BAKHTIAR SHAMLOO
08/25/2026
Special inspection requirement — Concrete - Cast-In-Place
BAKHTIAR SHAMLOO
08/25/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
BAKHTIAR SHAMLOO
08/25/2026
Special inspection requirement — Masonry
BAKHTIAR SHAMLOO
08/25/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
BAKHTIAR SHAMLOO
08/25/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
08/25/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
INDARDEO PARBHUNATH
08/25/2026
Special inspection requirement — Energy Code Compliance Inspections
BAKHTIAR SHAMLOO
08/25/2026
Special inspection requirement — Final
BAKHTIAR SHAMLOO
08/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
08/25/2026
Special inspection requirement — Air barrier — testing
BAKHTIAR SHAMLOO
08/25/2026
Special inspection requirement — Footing and Foundation
BAKHTIAR SHAMLOO
08/25/2026
Special inspection requirement — Fire-Resistance Rated Construction
BAKHTIAR SHAMLOO
08/25/2026
Special inspection requirement — Air barrier - visual inspection
BAKHTIAR SHAMLOO
08/25/2026
Special inspection requirement — Fenestration areas
BAKHTIAR SHAMLOO
08/25/2026
Special inspection requirement — Insulation placement and R values
BAKHTIAR SHAMLOO
08/25/2026
Special inspection requirement — Permanent certificate
BAKHTIAR SHAMLOO
08/25/2026
Special inspection requirement — Maintenance information
BAKHTIAR SHAMLOO
08/25/2026
Special inspection requirement — Fenestration air leakage
BAKHTIAR SHAMLOO
08/25/2026
Special inspection requirement — Interior lighting power
BAKHTIAR SHAMLOO
05/19/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/04/2026
Special inspection requirement — Concrete - Cast-In-Place
BAKHTIAR SHAMLOO
05/04/2026
Special inspection requirement — Masonry
BAKHTIAR SHAMLOO
05/04/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
BAKHTIAR SHAMLOO
05/04/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
05/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
05/04/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
INDARDEO PARBHUNATH
05/04/2026
Special inspection requirement — Footing and Foundation
BAKHTIAR SHAMLOO
05/04/2026
Special inspection requirement — Energy Code Compliance Inspections
BAKHTIAR SHAMLOO
05/04/2026
Special inspection requirement — Fire-Resistance Rated Construction
BAKHTIAR SHAMLOO
04/07/2026
Signed off — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH ALT#Q01237075.
Q01243464-I1
04/07/2026
Filed — Alteration CO
PROPOSED HORIZONTAL AND VERTICAL ENLARGEMENT TO EXISTING ONE STORY & CELLAR, ONE FAMILY TO REMAIN.
Q01237075-P1
03/13/2026
Signed off — Alteration
Q01222730-I1
03/02/2026
Filed — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH ALT#Q01237075.
Q01243464-P1
11/13/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/13/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/02/2025
Permit issued — Plumbing
Q01243464-I1-PL
08/27/2025
Permit issued — General Construction
Q01237075-I1-GC-CX
08/22/2025
Filed — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH ALT#Q01237075.
Q01243464-I1
08/21/2025
Objection resolved — Addressed
07/11/2025
Objection resolved — Addressed
07/11/2025
Objection resolved — Addressed
07/10/2025
Objection raised — Energy
07/10/2025
Objection raised — Energy
07/10/2025
Objection raised — Scope
06/17/2025
Filed — Alteration CO
PROPOSED HORIZONTAL AND VERTICAL ENLARGEMENT TO EXISTING ONE STORY & CELLAR, ONE FAMILY TO REMAIN.
Q01237075-I1
05/14/2025
Permit issued — Construction Fence
Q01222730-I1-FN
05/08/2025
Filed — Alteration
Q01222730-I1
08/19/2015
Violation issued (HPD, closed)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC10/02/2025
DOB NOWGeneral ConstructionPermit IssuedCUSTOMBUILT HOMES INC08/27/2025
DOB NOWConstruction FenceSigned-offCUSTOMBUILT HOMES INC05/14/2025
2 projects · most recent 07/06/2026
General Wiring
FiledStatusContractorScope
07/06/2026Pending Payment VerificationAYYUB ELECTRIC CORPGeneral Wiring
10/09/2025CompleteAYYUB ELECTRIC CORPGeneral Wiring
1 project · most recent 08/26/2026
FiledStatusContractorScope
08/26/2026Permit IssuedCUSTOMBUILT HOMES INC2 scope_items
1 project · most recent 08/26/2026
Earthwork
FiledStatusContractorScope
08/26/2026Permit IssuedCUSTOMBUILT HOMES INCEarthwork
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/19/2026Pass-Final CND-Occupancy InspectionPassView ↗
11/13/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/13/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/13/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 66
DateRequirementInspectorRole
08/25/2026Interior lighting powerBAKHTIAR SHAMLOOenergy_progress
08/25/2026Fenestration and door U-factor and product ratingsBAKHTIAR SHAMLOOenergy_progress
08/25/2026Electric vehicle service equipment requirementsBAKHTIAR SHAMLOOenergy_progress
08/25/2026Concrete - Cast-In-PlaceBAKHTIAR SHAMLOOspecial
08/25/2026Excavations - Sheeting, Shoring, and BracingBAKHTIAR SHAMLOOspecial
08/25/2026Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
08/25/2026MasonryBAKHTIAR SHAMLOOspecial
08/25/2026Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
08/25/2026Subsurface Investigations (Borings/Test Pits)INDARDEO PARBHUNATHspecial
08/25/2026Energy Code Compliance InspectionsBAKHTIAR SHAMLOOprogress
08/25/2026FinalBAKHTIAR SHAMLOOprogress
08/25/2026Fire-Resistance Rated ConstructionBAKHTIAR SHAMLOOprogress
08/25/2026Footing and FoundationBAKHTIAR SHAMLOOprogress
08/25/2026Air barrier — testing BAKHTIAR SHAMLOOenergy_progress
08/25/2026MeteringBAKHTIAR SHAMLOOenergy_progress
08/25/2026Air barrier - visual inspectionBAKHTIAR SHAMLOOenergy_progress
08/25/2026Fenestration areasBAKHTIAR SHAMLOOenergy_progress
08/25/2026Insulation placement and R valuesBAKHTIAR SHAMLOOenergy_progress
08/25/2026Permanent certificateBAKHTIAR SHAMLOOenergy_progress
08/25/2026Maintenance informationBAKHTIAR SHAMLOOenergy_progress
08/25/2026Fenestration air leakageBAKHTIAR SHAMLOOenergy_progress
05/04/2026Electric vehicle service equipment requirementsBAKHTIAR SHAMLOOenergy_progress
05/04/2026Subsurface Investigations (Borings/Test Pits)INDARDEO PARBHUNATHspecial
05/04/2026Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
05/04/2026Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
Latest 25 of 66.
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/20/2026Q01222730-I1Request digital key ↗
08/19/2026Q01237075-I1Request digital key ↗
08/19/2026Q01237075-P1Request digital key ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram4
08/19/2026Q01237075-I1Open ↗
08/19/2026Q01237075-P1Open ↗
08/13/2026Q01237075-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026Q01237075-I1Open ↗
08/13/2026Q01237075-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01237075-I1Open ↗
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature12
09/23/2026Q01237075-P2Open ↗
09/23/2026Q01237075-P2Open ↗
09/23/2026Q01237075-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026Q01237075-P2Open ↗
09/23/2026Q01237075-P2Open ↗
08/31/2026Q01243464-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/20/2026Q01222730-I1Open ↗
08/19/2026Q01237075-I1Open ↗
08/19/2026Q01237075-P1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026Q01237075-P1Open ↗
08/13/2026Q01237075-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/19/2026Q01237075-I1Open ↗
08/19/2026Q01237075-P1Open ↗
08/13/2026Q01243464-P1Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026Q01237075-I1Open ↗
08/13/2026Q01237075-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01237075-I1Open ↗
▸Other Documents10
▸DOB NOWPlot Diagram2
08/13/2026Q01237075-I1Open ↗
08/13/2026Q01237075-P1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026Q01237075-P1Open ↗
08/13/2026Q01237075-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/19/2026Q01237075-I1Open ↗
08/19/2026Q01237075-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q01237075-P1Open ↗
08/13/2026Q01237075-I1Open ↗
▸DOB NOWFinal Survey1
08/19/2026Q01237075-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01237075-I1Open ↗