← Back
BuildNYC
Cape Cod
83-41 LITTLE NECK PARKWAY
QUEENS · BIN 4179258
💬 Discuss this project
1945Year Built
1.5Stories
A0Building Class
R2AZoning
893 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Cape Cod · Owner of record: 8341 Street · 3,760 sf lot · 0.24 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 20 docs
Attic3p · 1 filing · 6 docs
Floor 28p · 2 filings · 20 docs
Floor 18p · 2 filings · 20 docs
Cellar8p · 2 filings · 20 docs
Site & exterior9p · 3 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/06/2025$670K—Private party → 8341 STREET LLC$750/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bakhtiar Shamloo308/26/2026
Tabriz Design Group303/02/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Tabriz Group Enterprise403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Custombuilt HomesGeneral Contractor203/21/2026
Custombuilt HomesScaffold107/08/2026
Rock E Small Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tabriz Group Enterprises3275508/26/2026
IP Concrete Testing and I6252203/02/2026
Building Lifecycle
10/16/2026
Signed off — Alteration CO
PROPOSED HORIZONTAL AND VERTICAL ENLARGEMENT TO EXISTING ONE STORY & CELLAR, ONE FAMILY TO REMAIN.
Q01237075-I1
08/26/2026
Filed — Alteration CO
PROPOSED HORIZONTAL AND VERTICAL ENLARGEMENT TO EXISTING ONE STORY & CELLAR, ONE FAMILY TO REMAIN.
Q01237075-P2
08/25/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
INDARDEO PARBHUNATH
08/25/2026
Special inspection requirement — Interior lighting power
BAKHTIAR SHAMLOO
08/25/2026
Special inspection requirement — Fenestration areas
BAKHTIAR SHAMLOO
52 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offRock E Small Plumbing & Heating10/02/2025
DOB NOWGeneral ConstructionPermit IssuedCustombuilt Homes08/27/2025
DOB NOWConstruction FenceSigned-offCustombuilt Homes05/14/2025
2 projects · most recent 07/06/2026
General Wiring
FiledStatusContractorScope
07/06/2026Pending Payment VerificationAyyub ElectricGeneral Wiring
10/09/2025CompleteAyyub ElectricGeneral Wiring
1 project · most recent 08/26/2026
FiledStatusContractorScope
08/26/2026Permit IssuedCustombuilt Homes—
1 project · most recent 08/26/2026
Earthwork
FiledStatusContractorScope
08/26/2026Permit IssuedCustombuilt HomesEarthwork
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/19/2026Pass-Final CND-Occupancy InspectionPassView ↗
11/13/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/13/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/13/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 66
DateRequirementInspectorRole
08/25/2026Fenestration and door U-factor and product ratingsBAKHTIAR SHAMLOOenergy_progress
08/25/2026Electric vehicle service equipment requirementsBAKHTIAR SHAMLOOenergy_progress
08/25/2026Interior lighting powerBAKHTIAR SHAMLOOenergy_progress
08/25/2026Fenestration air leakageBAKHTIAR SHAMLOOenergy_progress
08/25/2026Maintenance informationBAKHTIAR SHAMLOOenergy_progress
08/25/2026Permanent certificateBAKHTIAR SHAMLOOenergy_progress
08/25/2026Insulation placement and R valuesBAKHTIAR SHAMLOOenergy_progress
08/25/2026Fenestration areasBAKHTIAR SHAMLOOenergy_progress
08/25/2026Air barrier - visual inspectionBAKHTIAR SHAMLOOenergy_progress
08/25/2026MeteringBAKHTIAR SHAMLOOenergy_progress
08/25/2026Air barrier — testing BAKHTIAR SHAMLOOenergy_progress
08/25/2026Footing and FoundationBAKHTIAR SHAMLOOprogress
08/25/2026Fire-Resistance Rated ConstructionBAKHTIAR SHAMLOOprogress
08/25/2026FinalBAKHTIAR SHAMLOOprogress
08/25/2026Energy Code Compliance InspectionsBAKHTIAR SHAMLOOprogress
08/25/2026Subsurface Investigations (Borings/Test Pits)INDARDEO PARBHUNATHspecial
08/25/2026Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
08/25/2026MasonryBAKHTIAR SHAMLOOspecial
08/25/2026Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
08/25/2026Excavations - Sheeting, Shoring, and BracingBAKHTIAR SHAMLOOspecial
08/25/2026Concrete - Cast-In-PlaceBAKHTIAR SHAMLOOspecial
05/04/2026Permanent certificateBAKHTIAR SHAMLOOenergy_progress
05/04/2026Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
05/04/2026Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
05/04/2026Excavations - Sheeting, Shoring, and BracingBAKHTIAR SHAMLOOspecial
Latest 25 of 66.
54 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account