← Back
Elevator cooperative
Forest Park
83-55 WOODHAVEN BOULEVARD · Woodhaven · BIN 4095605
💬 Discuss this project
1954Year Built
6Stories
D4Building Class
R5Zoning
385,000 sfGross Floor Area
390Units
LL97 CoveredRent Stabilized218 Open Violations 217 unresolved · 1 paperwork only ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · Owner of record: FOREST PARK COOP INC SEC 1 · 128,408 sf lot · 3 FAR built · Flood zone X
Locations of Work
Architecture
Floor 64p · 1 filing · 12 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
XINOS CONSTRUCTION604/09/2026
FOREST PARK COOP INC SEC 1103/22/2026
FOREST PARK COOP INC SEC603/22/2026
FOREST PARK COOP303/22/2026
FOREST PARK COOP INC SEC2103/22/2026
ELM MANAGEMENT CO. ASS203/22/2026
FOREST PARK COOPERATIVE203/22/2026
FOREST PARK COOP SECTION 1303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHEUNG SHOWMAN ARCHITECTS108/12/2026
JOMO CHARLES212/14/2025
QUEENS ENGINEERING101/22/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XINOS CONSTRUCTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
XINOS CONSTRUCTION CORPGeneral Contractor304/09/2026
DSG CONSTRUCTION CORPGeneral Contractor203/21/2026
FSM ELECTRICAL CORPORATIOElectrical103/22/2026
KONARZEWSKI, TADEUSZElectrical103/21/2026
SAUBERMAN, ALVINElectrical103/21/2026
Building Lifecycle
All (88)Filed (4)Permit Issued (3)Signed Off (1)Facade (FISP) (12)Violation (60)Special Inspection (8)
08/12/2026
Filed — Alteration
IN UNIT 5P ON FLOOR 5, RENOVATION OF EXISTING BATHROOM FINISHES AS SHOWN ON PLANS. ALL PLUMBING WORK FILED UNDER SEPARATE LAA. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
Q01415058-I1
06/10/2026
Special inspection requirement — Final
Esther Cheung
06/10/2026
Special inspection requirement — Lighting in dwelling units
Esther Cheung
02/03/2026
Signed off — Alteration
Proposed installation of a heavy duty (300PSF) temporary sidewalk shed as per plans submitted. Work shall comply with 2022 building codes, chapter 33. no change in use, egress or occupancy.
Q00993508-I1
12/19/2025
Special inspection requirement — Final
JOMO CHARLES
12/19/2025
Special inspection requirement — Energy Code Compliance Inspections
JOMO CHARLES
12/19/2025
Special inspection requirement — Lighting in dwelling units
JOMO CHARLES
12/14/2025
Filed — Alteration
INTERIOR RENOVATION OF APT 6N. NEW FINISHES THROUGHOUT BATHROOM & KITCHEN, SKIM COAT OF WALLS & CEILING.
Q01255055-P1
12/09/2025
Special inspection requirement — Energy Code Compliance Inspections
JOMO CHARLES
12/09/2025
Special inspection requirement — Final
JOMO CHARLES
12/09/2025
Special inspection requirement — Lighting in dwelling units
JOMO CHARLES
10/17/2025
Permit issued — General Construction
Q01255055-I1-GC
07/15/2025
Filed — Alteration
INTERIOR RENOVATION OF APT 6N. NEW FINISHES THROUGHOUT BATHROOM & KITCHEN, SKIM COAT OF WALLS & CEILING.
Q01255055-I1
05/25/2025
Violation issued (HPD, open)
A
03/31/2025
Violation issued (HPD, open)
B
03/31/2025
Violation issued (HPD, open)
C
03/31/2025
Violation issued (HPD, open)
B
03/31/2025
Violation issued (HPD, closed)
C
03/17/2025
Permit issued — Sidewalk Shed
Q00993508-I1-SH
10/13/2024
Violation issued (HPD, closed)
C
10/13/2024
Violation issued (HPD, open)
A
10/13/2024
Violation issued (HPD, open)
A
10/13/2024
Violation issued (HPD, open)
A
10/13/2024
Violation issued (HPD, open)
A
10/13/2024
Violation issued (HPD, open)
A
10/13/2024
Violation issued (HPD, open)
A
10/13/2024
Violation issued (HPD, open)
A
08/11/2024
Violation issued (HPD, open)
B
08/11/2024
Violation issued (HPD, open)
A
08/11/2024
Violation issued (HPD, open)
A
08/11/2024
Violation issued (HPD, closed)
C
08/11/2024
Violation issued (HPD, open)
C
08/11/2024
Violation issued (HPD, closed)
C
08/11/2024
Violation issued (HPD, open)
A
08/11/2024
Violation issued (HPD, open)
A
08/11/2024
Violation issued (HPD, closed)
C
08/11/2024
Violation issued (HPD, open)
A
08/11/2024
Violation issued (HPD, closed)
C
08/11/2024
Violation issued (HPD, closed)
C
08/11/2024
Violation issued (HPD, open)
A
08/11/2024
Violation issued (HPD, closed)
C
08/11/2024
Violation issued (HPD, open)
A
08/11/2024
Violation issued (HPD, open)
B
07/08/2024
Cycle 9 facade report signed — SWARMP
06/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/12/2024
Violation issued (HPD, open)
C
05/12/2024
Violation issued (HPD, open)
C
05/12/2024
Violation issued (HPD, open)
C
05/12/2024
Violation issued (HPD, open)
A
05/04/2024
Violation issued (HPD, open)
A
05/04/2024
Violation issued (HPD, open)
C
05/04/2024
Violation issued (HPD, open)
A
05/04/2024
Violation issued (HPD, open)
A
05/04/2024
Violation issued (HPD, open)
A
05/04/2024
Violation issued (HPD, open)
A
05/04/2024
Violation issued (HPD, open)
A
04/18/2024
Violation issued (HPD, open)
A
04/18/2024
Violation issued (HPD, open)
A
04/18/2024
Violation issued (HPD, open)
A
04/18/2024
Violation issued (HPD, open)
A
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedDSG CONSTRUCTION10/17/2025
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP03/17/2025
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP01/22/2024
BISOTISSUEDKG CONSTRUCTION CORP02/20/2020
BISOTISSUEDCALANDRA ENTERPRISES INC05/31/2011
BISFBISSUEDLEONARD R.SIBRIZZI01/21/1997
BISOTISSUEDAPPLE INCINERATOR AND COMPACTOR07/19/1991
BISSPISSUEDAPPLE INCINERATOR AND COMPACTOR07/19/1991
BISBLISSUEDAGGRESSIVE HEATING CORP09/20/1990
6 projects · most recent 02/02/2026
General Wiring Lighting
FiledStatusContractorScope
02/02/2026CompleteDYNAMIC ELECTRICAL EVOLUTGeneral Wiring
08/14/2024CompleteFSM ELECTRICAL CORPORATIOGeneral Wiring
07/13/2023Permit IssuedROBERT CHIMENTI11 meters, 1 new_meters
02/07/2023CompleteAKEEA ELECTRIC INCLighting
11/04/2022CompleteOHM'S ELECTRICAL CORPGeneral Wiring
02/08/2018Permit IssuedR.C.M. ELECTRIC CORP.General Wiring
1 project · most recent 12/14/2025
FiledStatusContractorScope
12/14/2025Permit IssuedDSG CONSTRUCTION CORP1 scope_items
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
06/10/2026FinalEsther Cheungprogress
06/10/2026Lighting in dwelling unitsEsther Cheungenergy_progress
12/19/2025FinalJOMO CHARLESprogress
12/19/2025Energy Code Compliance InspectionsJOMO CHARLESprogress
12/19/2025Lighting in dwelling unitsJOMO CHARLESenergy_progress
12/09/2025Energy Code Compliance InspectionsJOMO CHARLESprogress
12/09/2025FinalJOMO CHARLESprogress
12/09/2025Lighting in dwelling unitsJOMO CHARLESenergy_progress
▾Documents — 44 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/23/2026Q00993508-I1Request digital key ↗
08/18/2026Q01255055-I1Request digital key ↗
08/18/2026Q01255055-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits4
▸BISWORK PERMIT APPLICATION2
03/03/2020421726065Open ↗
06/01/2011420359123Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
01/29/2020421726065Open ↗
05/26/2011420359123Open ↗
▸Seals & Professional Certifications20
▸DOB NOWProgress Inspector Seal & Signature8
09/21/2026Q01255055-P1Open ↗
09/21/2026Q01255055-P1Open ↗
09/21/2026Q01255055-P1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
03/04/2020421726065Open ↗
01/29/2020421726065Open ↗
05/26/2011420359123Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/18/2026Q01255055-I1Open ↗
08/16/2026Q01415058-I1Open ↗
08/13/2026Q01255055-P1Open ↗
Showing 3 of 4 on file for this type
▸BISProfessional and Owner Certification (POC3)2
05/26/2011420359123Open ↗
05/26/2011420359123Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/26/2011420359123Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
05/26/2011420359123Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
01/29/2020421726065Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/18/2026Q01255055-I1Open ↗
08/16/2026Q01415058-I1Open ↗
08/13/2026Q01255055-P1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/29/2020421726065Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
05/26/2011420359123Open ↗
▸Energy Compliance2
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/29/2023421726065Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/29/2020421726065Open ↗
▸Approvals, Objections & Sign-offs3
▸BISFINAL1
07/29/2023421726065Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
05/26/2011420359123Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/11/2024421726065Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
01/29/2020421726065Open ↗
05/26/2011420359123Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
10/09/2024421726065Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
01/29/2020421726065Open ↗
05/26/2011420359123Open ↗