← Back
Elevator cooperative
Forest Park
83-55 WOODHAVEN BOULEVARD · Woodhaven · BIN 4315207
💬 Discuss this project
1954Year Built
6Stories
D4Building Class
R5Zoning
385,000 sfGross Floor Area
390Units
LL97 CoveredRent Stabilized206 Open Violations 205 unresolved · 1 paperwork only ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · Owner of record: FOREST PARK COOP INC SEC 1 · 128,408 sf lot · 3 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbingEquipmentGeneral
Permit Issued — active, not yet Signed-off
Floor 6Under Construction2p · 1 filing · 6 docs
Floor 5
Floor 4
Floor 3Under Construction1p · 1 filing · 3 docs
Floor 2Under Construction7p · 2 filings · 18 docs
Floor 1
Site & exterior22p · 2 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
XINOS CONSTRUCTION907/08/2026
Metro Management Dev.507/08/2026
Forest Park Coop Sec 1203/22/2026
FOREST PARK COOP SECTION 1103/21/2026
FOREST PARK CO-OP103/21/2026
FOREST PARK COOP103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XINOS CONSTRUCTION403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
XINOS CONSTRUCTION CORPGeneral Contractor407/08/2026
ALMA DESIGN INCGeneral Contractor209/09/2026
NYC BUILDING SOLUTIONS COGeneral Contractor108/26/2026
UNRESERVED MULTI SRVC LLCGeneral Contractor108/12/2026
CITY PLUMBING INCPlumbing109/03/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BOLTARCHITECTURE,PLLC6712308/12/2026
PAUL CHRISTAKOS ARCHITECT5894107/16/2026
AA BUILDING & INSPECTION1519211/19/2025
Building Lifecycle
All (100)Filed (11)Permit Issued (9)Signed Off (2)Facade (FISP) (12)Violation (60)Inspection (1)Special Inspection (5)
09/08/2026
Permit issued — General Construction
Q01439825-S1-GC
09/02/2026
Permit issued — Plumbing
Q01439771-S1-PL
08/27/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROMERO CHAMBERS JR
08/12/2026
Filed — Alteration
INTERIOR RENOVATIONS AT UNIT 2T, 2ND FLOOR. INTERIOR RENOVATIONS INCLUDE NEW NON-LOAD BEARING PARTITIONS & REPLACEMENT OF FINISHES THROUGHOUT. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
Q01439771-P1
08/12/2026
Permit issued — General Construction
Q01416609-I1-GC
08/11/2026
Permit issued — General Construction
Q01439771-I1-GC
08/04/2026
Filed — Alteration
INTERIOR RENOVATIONS AT UNIT 2T, 2ND FLOOR. INTERIOR RENOVATIONS INCLUDE NEW NON-LOAD BEARING PARTITIONS & REPLACEMENT OF FINISHES THROUGHOUT. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
Q01439771-S1
08/04/2026
Filed — Alteration
INTERIOR RENOVATIONS AT UNIT 2T, 2ND FLOOR. INTERIOR RENOVATIONS INCLUDE NEW NON-LOAD BEARING PARTITIONS & REPLACEMENT OF FINISHES THROUGHOUT. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
Q01439771-I1
08/03/2026
Filed — Alteration
REPLACE AND RECONSTRUCTNON-LOAD BEARING PARTTIONS, FUR-OUT WALLS, SUBFLOOR AND CEILING FRAMING IN EXISTING BATHROOM ONLY. WORK IN CONJUNCTION WITH PLUMBING.
Q01439825-I1
07/16/2026
Filed — Alteration
INTERIOR ALTERATION OF APARTMENT 6P ON THE 6TH FLOOR. WORK INCLUDES KITCHEN & BATHROOM REMODEL AND NEW LIGHTING. NO CHANGE TOOCCUPANCY, USE, OR EGRESS.
Q01416609-I1
07/16/2026
Filed — Alteration
INTERIOR ALTERATION OF APARTMENT 6P ON THE 6TH FLOOR. WORK INCLUDES KITCHEN & BATHROOM REMODEL AND NEW LIGHTING. NO CHANGE TOOCCUPANCY, USE, OR EGRESS.
Q01416609-S1
05/04/2026
Violation issued (HPD, open)
A
05/01/2026
Permit issued — General Construction
Q01379189-I1-GC
04/30/2026
Violation issued (HPD, closed)
C
04/30/2026
Violation issued (HPD, open)
C
04/30/2026
Violation issued (HPD, open)
B
04/30/2026
Violation issued (HPD, open)
A
04/09/2026
Filed — Alteration
INTERIOR APARTMENT ALTERATION. SELECTIVE REPLACEMENT OF FINISH. NON-LOAD BEARING KICTH PARITION ALTERATION, NEW APPLIANCES, MILLWORKM REPLACE FIXTURES AT EXISTING LOCATIONS. BEW FLOOR FINISHED, LED LIGHTING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01379189-I1
02/03/2026
Signed off — Alteration
Q00993518-I1
12/02/2025
Signed off — Alteration
Herewith filed is the facade repair work as per plan filed herewith. Work inc.: Replace lintel; repair step crack, crack sills, crack brick; repair open mortar joint and missing caulk. No change in use, egress, or occupancy is involved under this appl.
Q01049506-I1
11/28/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
11/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
Younes Abouyaala
11/28/2025
Special inspection requirement — Masonry
Younes Abouyaala
11/28/2025
Special inspection requirement — Final
NAVEEN KUMAR
11/19/2025
Filed — Alteration
Herewith filed is the facade repair work as per plan filed herewith. Work inc.: Replace lintel; repair step crack, crack sills, crack brick; repair open mortar joint and missing caulk. No change in use, egress, or occupancy is involved under this appl.
Q01049506-P1
07/18/2025
Permit issued — General Construction
Q01049506-I1-GC
05/25/2025
Violation issued (HPD, closed)
C
05/25/2025
Violation issued (HPD, open)
A
03/17/2025
Permit issued — Sidewalk Shed
Q00993518-I1-SH
10/13/2024
Violation issued (HPD, open)
A
10/13/2024
Violation issued (HPD, open)
B
10/13/2024
Violation issued (HPD, open)
B
10/13/2024
Violation issued (HPD, open)
A
10/13/2024
Violation issued (HPD, open)
A
10/13/2024
Violation issued (HPD, open)
A
10/13/2024
Violation issued (HPD, open)
A
10/13/2024
Violation issued (HPD, closed)
C
10/13/2024
Violation issued (HPD, closed)
C
10/13/2024
Violation issued (HPD, open)
A
10/04/2024
Cycle 9 facade report signed — SWARMP
08/20/2024
Cycle 9 facade inspection completed
08/09/2024
Permit issued — General Construction
Q01049506-I1-GC
05/23/2024
Filed — Alteration
Herewith filed is the facade repair work as per plan filed herewith. Work inc.: Replace lintel; repair step crack, crack sills, crack brick; repair open mortar joint and missing caulk. No change in use, egress, or occupancy is involved under this appl.
Q01049506-I1
05/08/2024
Filed — Alteration
Q00993518-P1
04/16/2024
Violation issued (HPD, closed)
A
03/14/2024
Cycle 9 facade report submitted
01/22/2024
Filed — Alteration
Q00993518-I1
01/22/2024
Permit issued — Sidewalk Shed
Q00993518-I1-SH
02/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/13/2022
Violation issued (HPD, open)
A
01/13/2022
Violation issued (HPD, open)
C
01/13/2022
Violation issued (HPD, open)
A
01/13/2022
Violation issued (HPD, open)
A
01/13/2022
Violation issued (HPD, open)
A
01/13/2022
Violation issued (HPD, open)
A
04/16/2021
Violation issued (HPD, closed)
A
07/19/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/27/2019
Cycle 8 facade report signed — SAFE
02/11/2019
Violation issued (ECB, open)
Local Law
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedALMA DESIGN INC09/08/2026
DOB NOWPlumbingPermit IssuedCITY PLUMBING INC09/02/2026
DOB NOWGeneral ConstructionPermit IssuedNYC BUILDING SOLUTIONS CO08/12/2026
DOB NOWGeneral ConstructionPermit IssuedUNRESERVED MULTI SRVC LLC08/11/2026
DOB NOWGeneral ConstructionPermit IssuedALMA DESIGN INC05/01/2026
DOB NOWGeneral ConstructionSigned-offXINOS CONSTRUCTION CORP07/18/2025
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP03/17/2025
DOB NOWGeneral ConstructionSigned-offXINOS CONSTRUCTION CORP08/09/2024
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP01/22/2024
BISOTISSUEDCALANDRA ENTERPRISES INC05/25/2011
BISOTISSUEDAPPLE INCINERATOR & COMPACTOR07/19/1991
3 projects · most recent 08/12/2026
Water/Sanitary
FiledStatusContractorScope
08/12/2026Permit IssuedCITY PLUMBING INCWater/Sanitary
08/03/2026——Water/Sanitary
07/16/2026——Water/Sanitary
10 projects · most recent 09/10/2026
General Wiring
FiledStatusContractorScope
09/10/2026CompleteLENS ELECTRIC, INC—
08/06/2026Permit IssuedRAY JAY & A ELECTRIC CORPGeneral Wiring
07/20/2026CompleteLENS ELECTRIC, INC—
07/13/2026Permit IssuedCRESCO ELECTRICAL CORPGeneral Wiring
06/02/2026Permit IssuedLENS ELECTRIC, INCGeneral Wiring
06/10/2025Permit IssuedTOWER ELECTRIC INC.—
04/07/2025CompleteNY CITY ELECTRIC INCGeneral Wiring
03/11/2025CompleteTRIAC ELECTRIC INCGeneral Wiring
02/19/2024CompleteCL ELECTRICAL CORP—
06/27/2018Permit IssuedR.C.M. ELECTRIC CORP.General Wiring
1 project · most recent 08/03/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
08/03/2026Permit IssuedALMA DESIGN INCTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/27/2026Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/17/2026Fire-Resistant Penetrations and JointsROMERO CHAMBERS JRspecial
11/28/2025Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
11/28/2025Tenant Protection Plan ComplianceYounes Abouyaalaspecial
11/28/2025MasonryYounes Abouyaalaspecial
11/28/2025FinalNAVEEN KUMARprogress
▾Documents — 60 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/23/2026Q00993518-I1Request digital key ↗
08/23/2026Q00993518-P1Request digital key ↗
08/22/2026Q01049506-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
11/05/2012420780685Open ↗
05/25/2011420359007Open ↗
▸BISWORK PERMIT APPLICATION1
05/26/2011420359007Open ↗
▸Seals & Professional Certifications25
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/29/2026Q01439825-S1Open ↗
08/23/2026Q00993518-I1Open ↗
08/23/2026Q00993518-P1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
11/05/2012420780685Open ↗
11/05/2012420780685Open ↗
05/25/2011420359007Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/23/2026Q01439825-S1Open ↗
09/23/2026Q01439825-S1Open ↗
09/23/2026Q01439825-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/21/2026Q01439771-S1Open ↗
08/23/2026Q01049506-I1Open ↗
08/23/2026Q01049506-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
05/25/2011420359007Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/25/2011420359007Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/29/2026Q01439825-S1Open ↗
08/22/2026Q01049506-I1Open ↗
08/17/2026Q01379189-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
05/25/2011420359007Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
11/05/2012420780685Open ↗
11/05/2012420780685Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: SOIL INSPECTION2
11/05/2012420780685Open ↗
11/05/2012420780685Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS2
11/05/2012420780685Open ↗
05/25/2011420359007Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
11/05/2012420780685Open ↗
05/25/2011420359007Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
11/05/2012420780685Open ↗
05/25/2011420359007Open ↗