← Back
One story - permanent living quarter
83 ALLENDALE ROAD
STATEN ISLAND · BIN 5047386
💬 Discuss this project
1950Year Built
1Stories
A2Building Class
R2Zoning
1,180 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
One story - permanent living quarter · 5,000 sf lot · 0.24 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 112p · 1 filing · 20 docs
Basement1p · 1 filing · 5 docs
Sub-Basement10p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HIGH QUALITY CONSTRUCTION103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NKM ENGINEERING PLLC103/30/2026
CHUN FENG, ARCHITECT402/04/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIGH QUALITY 338803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HIGH QUALITY CONSTRUCTIONGeneral Contractor304/09/2026
AMERICAN STANDARD P&H CORORP.Plumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244402/04/2026
Building Lifecycle
All (46)Filed (5)Permit Issued (3)Violation (2)Objection (6)Special Inspection (30)
06/03/2026
Objection raised — Fire_Protection
06/03/2026
Objection resolved — Addressed
04/24/2026
Objection raised — Scope
04/24/2026
Objection resolved — Addressed
04/24/2026
Objection raised — Inspections
04/24/2026
Objection resolved — Addressed
03/30/2026
Filed — Alteration
CONSTRUCTION WORK IS FILED TO EXCAVATE AND BUILD THE NEW RETAINING WALLS AT REAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01370645-I1
03/12/2026
Special inspection requirement — Structural Steel - Details
03/12/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
03/12/2026
Special inspection requirement — Concrete - Cast-In-Place
03/11/2026
Special inspection requirement — Final
03/11/2026
Special inspection requirement — Footing and Foundation
02/05/2026
Special inspection requirement — Interior lighting power
NARESH MAHANGU
02/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
02/05/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
02/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
02/05/2026
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
02/05/2026
Special inspection requirement — Final
Chun Feng
02/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
NARESH MAHANGU
02/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
02/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
02/05/2026
Special inspection requirement — Insulation placement and R values
NARESH MAHANGU
02/05/2026
Special inspection requirement — Air barrier - visual inspection
02/05/2026
Special inspection requirement — Fenestration air leakage
02/05/2026
Special inspection requirement — Fenestration areas
02/04/2026
Filed — Alteration
SUBSEQUENTLY FILE MS JOB TO INSTALL AIR CONDITION SYSTEM WITH DUCT WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01224670-P1
02/03/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
02/03/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
02/03/2026
Special inspection requirement — Fenestration areas
02/03/2026
Special inspection requirement — HVAC-R and service water heating system controls
02/03/2026
Special inspection requirement — Air barrier - visual inspection
02/03/2026
Special inspection requirement — Fenestration air leakage
02/03/2026
Special inspection requirement — HVAC-R and service water heating equipment
02/02/2026
Special inspection requirement — Final
Chun Feng
02/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
02/02/2026
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
02/02/2026
Special inspection requirement — Interior lighting power
NARESH MAHANGU
02/02/2026
Special inspection requirement — Insulation placement and R values
NARESH MAHANGU
01/30/2026
Violation issued (ECB, closed)
Unknown
01/30/2026
Violation issued (ECB, open)
Construction
09/12/2025
Permit issued — Mechanical Systems
S01224670-S2-MS
09/09/2025
Filed — Alteration
SUBSEQUENTLY FILE MS JOB TO INSTALL AIR CONDITION SYSTEM WITH DUCT WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01224670-S2
05/21/2025
Permit issued — Plumbing
S01224670-S1-PL
05/21/2025
Permit issued — General Construction
S01224670-I1-GC
05/15/2025
Filed — Alteration
SUBSEQUENTLY FILE MS JOB TO INSTALL AIR CONDITION SYSTEM WITH DUCT WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01224670-I1
05/15/2025
Filed — Alteration
SUBSEQUENTLY FILE MS JOB TO INSTALL AIR CONDITION SYSTEM WITH DUCT WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01224670-S1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedHIGH QUALITY CONSTRUCTION09/12/2025
DOB NOWPlumbingPermit IssuedAMERICAN STANDARD P&H CORORP.05/21/2025
DOB NOWGeneral ConstructionPermit IssuedHIGH QUALITY CONSTRUCTION05/21/2025
1 project · most recent 02/04/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
02/04/2026Permit IssuedHIGH QUALITY CONSTRUCTIONHeating and Air Conditioning Systems
Heat / Cool
Lennox EL16KC1-042-230A 42,000 BTU · Condensing Unit ×1
1 project · most recent 02/04/2026
Gas Water/Sanitary
FiledStatusContractorScope
02/04/2026Permit IssuedAMERICAN STANDARD P&H CORGas, Water/Sanitary
1 project · most recent 02/10/2026
General Wiring
FiledStatusContractorScope
02/10/2026Permit IssuedE D ELECTRICAL INCGeneral Wiring
1 project · most recent 03/30/2026
FiledStatusContractorScope
03/30/2026——1 scope_items
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
03/12/2026Structural Steel - Details—special
03/12/2026Excavations - Sheeting, Shoring, and Bracing—special
03/12/2026Concrete - Cast-In-Place—special
03/11/2026Final—progress
03/11/2026Footing and Foundation—progress
02/05/2026Interior lighting powerNARESH MAHANGUenergy_progress
02/05/2026HVAC-R and service water piping design and insulation—energy_progress
02/05/2026Fenestration and door U-factor and product ratings—energy_progress
02/05/2026Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
02/05/2026Energy Code Compliance InspectionsNARESH MAHANGUprogress
02/05/2026FinalChun Fengprogress
02/05/2026Fire-Resistance Rated ConstructionNARESH MAHANGUprogress
02/05/2026HVAC-R and service water heating equipment—energy_progress
02/05/2026HVAC-R and service water heating system controls—energy_progress
02/05/2026Insulation placement and R valuesNARESH MAHANGUenergy_progress
02/05/2026Air barrier - visual inspection—energy_progress
02/05/2026Fenestration air leakage—energy_progress
02/05/2026Fenestration areas—energy_progress
02/03/2026HVAC-R and service water piping design and insulation—energy_progress
02/03/2026Fenestration and door U-factor and product ratings—energy_progress
02/03/2026Fenestration areas—energy_progress
02/03/2026HVAC-R and service water heating system controls—energy_progress
02/03/2026Air barrier - visual inspection—energy_progress
02/03/2026Fenestration air leakage—energy_progress
02/03/2026HVAC-R and service water heating equipment—energy_progress
Latest 25 of 41.
▾Documents — 30 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/18/2026S01224670-S1Request digital key ↗
08/18/2026S01224670-P1Request digital key ↗
08/18/2026S01224670-S2Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature10
09/23/2026S01224670-S2Open ↗
09/23/2026S01224670-S2Open ↗
09/23/2026S01224670-S2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/17/2026S01370645-I1Open ↗
08/13/2026S01224670-S1Open ↗
08/13/2026S01224670-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026S01224670-S2Open ↗
09/01/2026S01224670-P1Open ↗
08/26/2026S01224670-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/17/2026S01370645-I1Open ↗
08/13/2026S01224670-S2Open ↗
08/13/2026S01224670-S1Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026S01370645-I1Open ↗