2 Open Violations 1 unresolved · 1 paperwork only▸
ECB06/24/2026WORK WITHOUTA PERMIT. NOTED : AT TIME OF INSPECTION,OBSERVED AT REAR OF BUILDING A DECK WAS ERECTED WITH STEPS LEADING TO THE DECK, THERE IS NO PERMIT IN DEPT RECORDS FOR THIS WORK ., OBTAIN ALL PERMITS$1K due
ECB04/22/2025NOTED: 4 SPLIT A/C UNITS INSTALLED AT FACADE EXP-4, WIRED AND WITH SWITCHES BOX. WORK 100% COMPLETED. REMEDY: OBTAIN PERMITS.Nothing owed — awaiting certificate of correction
One family attached or semi-detached · 2,400 sf lot · 0.49 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.