← Back
Walk-up apt, over six families with stores
83 MAC DOUGAL STREET
MANHATTAN · BIN 1008304
💬 Discuss this project
1910Year Built
7Stories
C7Building Class
R7-2Zoning
18,634 sfGross Floor Area
40Units
Rent Stabilized0 Open ViolationsFISP: SWARMP
Walk-up apt, over six families with stores · Owner of record: MACDOUGAL & SIXTH REALTY LLC · 3,975 sf lot · 4.69 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof29p · 2 filings · 20 docs
Floor 131p · 3 filings · 20 docs
Cellar26p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
304-310 W 14 REALTY1807/08/2026
MACDOUGAL SIXTH REALTY1103/22/2026
83-85 MACDOUGAL REALTY403/21/2026
WASSERMAN REAL ESTATE103/21/2026
MAC DOUGAL 6TH REALTY203/21/2026
TOSCA CORP NY103/21/2026
TOASA CORP N V103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EDG402/19/2026
DAVID BUCOVY ARCHITECT311/13/2024
ABS ENGINEERING, PLLC203/21/2024
ASHRAF CORP205/12/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LMS-ACE SERVICES403/21/2026
DAVID BUCOVY ARCHITECT503/21/2026
TRADITIONAL WATERPROOFING & RESTORA203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANDAMIO SCAFFOLDING LLCGeneral Contractor1007/08/2026
LOWVOLT TECH ENTERPRISESGeneral Contractor507/08/2026
TRADITIONAL WATERPROOFINGGeneral Contractor304/09/2026
MATROS, AElectrical103/21/2026
LEWIS, MARVINElectrical103/21/2026
SKY CONSTRUCTION MGMT LLCGeneral Contractor107/08/2026
STELLMAR PLBG & MECH.CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EDG2578402/19/2026
SHAHRISH SHUVO ENGINEERIN8524411/13/2024
THE EIPEL ENGINEERING GRO2714111/13/2024
JOSEPH K. BLUM CO. LLP1741110/08/2024
DAVID BUCOVY ARCHITECT915303/21/2024
Building Lifecycle
All (119)Filed (12)Permit Issued (14)Signed Off (2)Facade (FISP) (21)Violation (38)Inspection (5)Objection (6)Special Inspection (21)
05/18/2026
Permit issued — Structural
M01012357-S2-ST
03/20/2026
Cycle 9 facade report signed — SWARMP
02/19/2026
Filed — Alteration
FACADE REPAIRS AND ROOF REPLACEMENT AS SHOWN ON THE DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00747386-P3
02/04/2026
Cycle 9 facade report submitted
02/04/2026
Cycle 9 facade inspection completed
12/08/2025
Signed off — Alteration
M00987304-I1
09/24/2025
Permit issued — General Construction
M00747386-I1-GC
08/28/2025
Filed — Alteration
FACADE REPAIRS AND ROOF REPLACEMENT AS SHOWN ON THE DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00747386-P2
07/29/2025
Special inspection requirement — Masonry
Anthony Stasio
07/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Stasio
07/29/2025
Special inspection requirement — Final
Anthony Stasio
07/29/2025
Special inspection requirement — Post-installed Anchors
Anthony Stasio
07/29/2025
Special inspection requirement — Insulation placement and R values
Anthony Stasio
07/22/2025
Signed off — Alteration
M00672159-I1
05/14/2025
Permit issued — General Construction
M01012357-I1-GC
02/12/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/27/2025
Cycle 9 facade report submitted
01/27/2025
Cycle 9 facade report signed — UNSAFE
01/21/2025
Permit issued — Suspended Scaffold
M00987304-I1-SC
01/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/14/2025
Permit issued — Sidewalk Shed
M00672159-I1-SH
01/13/2025
Cycle 9 facade inspection completed
12/12/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/18/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/13/2024
Filed — Alteration
M01012357-S2
10/08/2024
Filed — Alteration
M01012357-S1
09/30/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
WILLIAM DEGRAAFF
09/30/2024
Special inspection requirement — Structural Steel - Welding
WILLIAM DEGRAAFF
09/30/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
WILLIAM DEGRAAFF
09/30/2024
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM DEGRAAFF
09/30/2024
Special inspection requirement — Structural Steel - Details
WILLIAM DEGRAAFF
09/30/2024
Special inspection requirement — Tenant Protection Plan Compliance
WILLIAM DEGRAAFF
09/25/2024
Permit issued — General Construction
M00747386-I1-GC
09/23/2024
Special inspection requirement — Final
WILLIAM DEGRAAFF
08/20/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/12/2024
Permit issued — Plumbing
M01012370-I1-PL
05/15/2024
Permit issued — General Construction
M01012357-I1-GC
05/15/2024
Permit issued — Mechanical Systems
M01012371-I1-MS
04/02/2024
Objection raised — Other
04/02/2024
Objection resolved — Addressed
03/21/2024
Filed — Alteration
M01012370-I1
03/19/2024
Filed — Alteration
M01012357-I1
03/19/2024
Filed — Alteration
Mechanical alteration being filed for new kitchen & toilet exhaust system, new Ventilation & VRF system.
M01012371-I1
03/15/2024
Special inspection requirement — Post-installed Anchors
Shahrish Shuvo
03/15/2024
Special inspection requirement — Tenant Protection Plan Compliance
Shahrish Shuvo
03/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
david bucovy
03/06/2024
Violation issued (HPD, closed)
B
03/06/2024
Violation issued (HPD, closed)
A
03/06/2024
Violation issued (HPD, closed)
C
03/06/2024
Violation issued (HPD, closed)
B
03/06/2024
Violation issued (HPD, closed)
B
03/06/2024
Violation issued (HPD, closed)
A
03/06/2024
Violation issued (HPD, closed)
A
03/06/2024
Violation issued (HPD, closed)
B
03/06/2024
Violation issued (HPD, closed)
B
03/06/2024
Violation issued (HPD, closed)
B
03/06/2024
Violation issued (HPD, closed)
B
02/28/2024
Special inspection requirement — Final
Shahrish Shuvo
02/28/2024
Special inspection requirement — Mechanical Systems
Shahrish Shuvo
01/23/2024
Permit issued — Sidewalk Shed
M00672159-I1-SH
Latest 60 of 119 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedSKY CONSTRUCTION MGMT LLC05/18/2026
DOB NOWGeneral ConstructionPermit IssuedTRADITIONAL WATERPROOFING09/24/2025
DOB NOWGeneral ConstructionPermit IssuedLOWVOLT TECH ENTERPRISES05/14/2025
DOB NOWSuspended ScaffoldSigned-offTRADITIONAL WATER AND RES01/21/2025
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC01/14/2025
DOB NOWGeneral ConstructionPermit IssuedTRADITIONAL WATERPROOFING09/25/2024
DOB NOWPlumbingSigned-offSTELLMAR PLBG & MECH.CORP06/12/2024
DOB NOWGeneral ConstructionPermit IssuedLOWVOLT TECH ENTERPRISES05/15/2024
DOB NOWMechanical SystemsPermit IssuedLOWVOLT TECH ENTERPRISES05/15/2024
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC01/23/2024
DOB NOWSuspended ScaffoldSigned-offTRADITIONAL WATER AND RES01/22/2024
DOB NOWGeneral ConstructionPermit IssuedTRADITIONAL WATERPROOFING09/21/2023
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC01/31/2023
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC02/02/2022
BISPLISSUEDMASTER 2 PLBG & HTG INC05/04/2018
BISOTISSUEDMEA CONSTRUCTION INC05/05/2017
BISPLISSUEDMASTER 2 PLBG & HTG INC05/01/2017
BISOTISSUEDMEA CONSTRUCTION INC02/10/2017
BISPLISSUEDBELL FUEL OIL, LLC05/20/2015
BISPLISSUEDPLUMBING & HTG DOCTOR INC01/26/2015
BISOTISSUEDMEA CONSTRUCTION INC12/12/2014
BISOTISSUEDVACCA BROTHERS CONTRACTOR05/24/2011
BISEQISSUEDCS BRIDGE CORP05/06/2011
BISPLISSUEDN KOFSKY & SON INC03/19/2003
BISOTISSUEDN KOFSKY & SON INC03/19/2003
BISEQISSUEDCOLGATE SCAFF AND EQUIP CORP01/30/2002
BISEQISSUEDSPRING SCAFFOLDING INC11/20/1997
BISOTISSUEDDNA CONSTRUCTION CORP11/13/1997
BISEQISSUEDCYR CONSTRUCTION CO INC08/14/1996
BISOTISSUEDARROW RESTORATION,INC03/19/1993
BISEQISSUEDATLANTIC SCAFFOLDING02/16/1993
1 project · most recent 03/19/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/19/2024Permit IssuedLOWVOLT TECH ENTERPRISESHeating and Air Conditioning Systems
Heat / Cool
Daikin REYQ96AATJA 93,400 BTU · Vrf Outdoor ×1
3 projects · most recent 05/10/2024
General Wiring
FiledStatusContractorScope
05/10/2024Permit IssuedC.FALCO ELETL CONT CORPGeneral Wiring
10/31/2023Permit IssuedALLSTATE ELECTRIC CORPGeneral Wiring
02/10/2022CompleteBOROWIDE ELECT'L CONTR'S—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
02/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/18/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
07/29/2025MasonryAnthony Stasiospecial
07/29/2025Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
07/29/2025FinalAnthony Stasioprogress
07/29/2025Post-installed AnchorsAnthony Stasiospecial
07/29/2025Insulation placement and R valuesAnthony Stasioenergy_progress
09/30/2024Structural Stability – Alterations of existing buildingsWILLIAM DEGRAAFFspecial
09/30/2024Structural Steel - WeldingWILLIAM DEGRAAFFspecial
09/30/2024Alternative Materials - OTCR Buildings Bulletin NumberWILLIAM DEGRAAFFspecial
09/30/2024Concrete - Cast-In-PlaceWILLIAM DEGRAAFFspecial
09/30/2024Structural Steel - DetailsWILLIAM DEGRAAFFspecial
09/30/2024Tenant Protection Plan ComplianceWILLIAM DEGRAAFFspecial
09/23/2024FinalWILLIAM DEGRAAFFprogress
03/15/2024Post-installed AnchorsShahrish Shuvospecial
03/15/2024Tenant Protection Plan ComplianceShahrish Shuvospecial
03/11/2024Fire-Resistant Penetrations and Jointsdavid bucovyspecial
02/28/2024FinalShahrish Shuvoprogress
02/28/2024Mechanical SystemsShahrish Shuvospecial
04/10/2023MasonryAnthony Stasiospecial
04/10/2023Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
04/10/2023FinalAnthony Stasioprogress
04/10/2023Insulation placement and R valuesAnthony Stasioenergy_progress
▾Documents — 170 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/31/2026M00672159-I1Request digital key ↗
08/31/2026M00672159-P1Request digital key ↗
08/28/2026M00987304-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits33
▸BISPLAN / WORK APPROVAL APPLICATION16
02/18/2020122965666Open ↗
02/13/2020122965666Open ↗
12/05/2019122965666Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWLPC Approval/Permit9
08/19/2026M00747386-I1Open ↗
08/13/2026M01012357-S1Open ↗
08/13/2026M01012357-I1Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION8
05/26/2017122965666Open ↗
05/23/2017122965666Open ↗
02/15/2017122965666Open ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications49
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
02/08/2017122965666Open ↗
02/26/2016122201214Open ↗
05/20/2015122403238Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/31/2026M00672159-I1Open ↗
08/31/2026M00672159-P1Open ↗
08/27/2026M01012370-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/02/2026M01012357-S1Open ↗
09/02/2026M01012357-S1Open ↗
08/25/2026M00747386-P2Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
07/21/2020122965666Open ↗
02/13/2017122965666Open ↗
02/08/2017122965666Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026M01012357-S1Open ↗
08/25/2026M00747386-P2Open ↗
08/25/2026M00747386-P2Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
02/08/2017122965666Open ↗
05/20/2015122403238Open ↗
12/11/2014122201214Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
05/24/2011120681397Open ↗
05/11/2011120683849Open ↗
▸Trade Schedules & Equipment12
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
02/18/2020122965666Open ↗
02/13/2020122965666Open ↗
12/05/2019122965666Open ↗
Showing 3 of 9 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
10/13/2015122201214Open ↗
03/11/2015122201214Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
05/20/2015122403238Open ↗
▸Safety & Tenant Protection10
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE8
05/25/2011120681397Open ↗
05/25/2011120681397Open ↗
05/25/2011120681397Open ↗
Showing 3 of 8 on file for this type
▸BISTenant Protection Plan and Notes1
02/08/2017122965666Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
05/24/2011120681397Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026M01012370-I1Open ↗
08/25/2026M01012357-S2Open ↗
08/25/2026M01012357-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
02/08/2017122965666Open ↗
05/20/2015122403238Open ↗
12/11/2014122201214Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
05/11/2011120683849Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
05/24/2011120681397Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M00747386-I1Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
02/15/2017122965666Open ↗
02/26/2016122201214Open ↗
05/20/2015122403238Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
07/21/2020122965666Open ↗
02/26/2016122201214Open ↗
10/09/2014120681397Open ↗
▸BISTR8: Energy Code Progress Inspections1
12/18/2014122201214Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/21/2020122965666Open ↗
▸BISTECHNICAL REPORT: ENERGY1
05/24/2011120681397Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/21/2020122965666Open ↗
▸Approvals, Objections & Sign-offs10
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
07/21/2020122965666Open ↗
02/26/2016122201214Open ↗
10/09/2014120681397Open ↗
▸BISLANDMARKS APPROVAL2
02/08/2017122965666Open ↗
02/26/2016122201214Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
05/24/2011120681397Open ↗
05/11/2011120683849Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
05/20/2015122403238Open ↗
10/09/2014120681397Open ↗
▸BISLANDMARKS SIGNOFF1
07/21/2020122965666Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT6
07/21/2020122965666Open ↗
02/08/2017122965666Open ↗
02/26/2016122201214Open ↗
Showing 3 of 6 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
02/15/2017122965666Open ↗
▸Filing & Intake Forms10
▸BISEFILING COVER SHEET5
02/08/2017122965666Open ↗
05/20/2015122403238Open ↗
12/11/2014122201214Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM3
02/13/2020122965666Open ↗
12/03/2019122965666Open ↗
07/23/2019122965666Open ↗
▸BISADDITIONAL INFORMATION2
12/05/2019122965666Open ↗
08/10/2015122201214Open ↗
▸Other Documents5
▸DOB NOWProof of Historic Building3
08/13/2026M01012357-I1Open ↗
08/13/2026M01012371-I1Open ↗
08/13/2026M01012370-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M00987304-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M00987304-I1Open ↗