← Back
Office with commercial, 7-19 stories
83 UNIVERSITY PLACE
MANHATTAN · BIN 1009127
💬 Discuss this project
1906Year Built
11Stories
O6Building Class
C1-7Zoning
191,223 sfGross Floor Area
13Units
LL97 Covered30 Open Violations 23 unresolved · 7 paperwork only ▸FISP: SAFEFDNY Report ↗
Office with commercial, 7-19 stories · Owner of record: 41 EAST 11TH STREET · 18,375 sf lot · 10.41 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Roof4p · 3 filings · 20 docs
Floor 5Under Construction44p · 1 filing · 16 docs
Floor 4
Floor 310p · 3 filings · 13 docs
Floor 2
Floor 122p · 5 filings · 20 docs
Cellar22p · 4 filings · 20 docs
1 job · most recent 08/18/2026
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/18/2026Permit IssuedGANNON CONTRACTING LLCHeating Systems, Ventilation Systems
Heating
Ventilation
Greenheck SQ-120-VG 1,000 CFM · Exhaust Fan ×4
CSPA-A1090-VG 800 CFM · Exhaust Fan ×1
2 jobs · most recent 08/18/2026
Sprinkler System
FiledStatusContractorScope
08/18/2026Permit IssuedFULL CAPACITY FIRE CORPSprinkler System
08/11/2025——Sprinkler System
2 jobs · most recent 08/18/2026
Water/Sanitary Gas
FiledStatusContractorScope
08/18/2026Permit IssuedA&A PLUMBING CORPWater/Sanitary
08/11/2025——Gas, Water/Sanitary
5 jobs · most recent 04/29/2026
General Wiring
FiledStatusContractorScope
04/29/2026CompleteGREEN APPLE ELECL SVCS LL—
04/24/2026CompleteGREEN APPLE ELECL SVCS LL—
02/23/2021Permit IssuedDELTA ELEC'L CONTR'G CORPGeneral Wiring
02/19/2020Permit IssuedWCK ELECTRIC CORP.—
10/09/2018CompleteR.J.ELECTRICAL CONTRACTORGeneral Wiring
Building Lifecycle
All (190)Filed (22)Permit Issued (21)Signed Off (8)Facade (FISP) (11)Violation (60)Inspection (8)Objection (30)Special Inspection (30)
08/26/2026
Permit issued — Plumbing
M01412804-S2-PL
08/25/2026
Permit issued — Sprinklers
M01412804-S3-EW-SP
08/20/2026
Permit issued — General Construction
M01412804-I1-GC
08/20/2026
Permit issued — Mechanical Systems
M01412804-S1-MS
08/18/2026
Filed — Alteration
Plumbing work in conjunction with interior renovation of the 5th floor
M01412804-S1
08/13/2026
Filed — Alteration
Plumbing work in conjunction with interior renovation of the 5th floor
M01412804-S3
08/13/2026
Filed — Alteration
Plumbing work in conjunction with interior renovation of the 5th floor
M01412804-S2
08/04/2026
Filed — Alteration
Plumbing work in conjunction with interior renovation of the 5th floor
M01412804-I1
07/27/2026
Special inspection requirement — Lighting controls
Julian Saavedra
07/27/2026
Special inspection requirement — Metering
Julian Saavedra
07/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Julian Saavedra
07/27/2026
Special inspection requirement — Energy Code Compliance Inspections
Julian Saavedra
07/27/2026
Special inspection requirement — Post-installed Anchors
Julian Saavedra
07/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
Julian Saavedra
07/27/2026
Special inspection requirement — Duct leakage testing, insulation and design
Julian Saavedra
07/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Julian Saavedra
07/27/2026
Special inspection requirement — Energy Code Compliance Inspections
Julian Saavedra
07/27/2026
Special inspection requirement — HVAC-R and service water heating equipment
Julian Saavedra
07/27/2026
Special inspection requirement — Post-installed Anchors
Julian Saavedra
07/27/2026
Special inspection requirement — Interior lighting power
Julian Saavedra
06/05/2026
Special inspection requirement — Final
Julian Saavedra
06/05/2026
Special inspection requirement — Mechanical Systems
Julian Saavedra
04/10/2026
Signed off — Alteration
Installation of rooftop condensing units and air handlers
M01346728-I1
04/09/2026
Special inspection requirement — Heating Systems
PAUL DENIS
04/09/2026
Special inspection requirement — Energy Code Compliance Inspections
PAUL DENIS
04/09/2026
Special inspection requirement — Duct leakage testing, insulation and design
PAUL DENIS
04/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL DENIS
04/09/2026
Special inspection requirement — Shutoff dampers
PAUL DENIS
04/09/2026
Special inspection requirement — Mechanical Systems
PAUL DENIS
04/09/2026
Special inspection requirement — Final
PAUL DENIS
04/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
PAUL DENIS
04/08/2026
Filed — Alteration
Installation of rooftop condensing units and air handlers
M01346728-P1
03/31/2026
Special inspection requirement — Energy Code Compliance Inspections
PAUL DENIS
03/31/2026
Special inspection requirement — Final
PAUL DENIS
03/31/2026
Special inspection requirement — Mechanical Systems
PAUL DENIS
03/31/2026
Special inspection requirement — Duct leakage testing, insulation and design
PAUL DENIS
03/31/2026
Special inspection requirement — HVAC-R and service water heating system controls
PAUL DENIS
03/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL DENIS
03/31/2026
Special inspection requirement — Shutoff dampers
PAUL DENIS
03/31/2026
Special inspection requirement — Heating Systems
PAUL DENIS
03/23/2026
Permit issued — General Construction
M01346728-I1-GC-CX
03/17/2026
Filed — Alteration
Installation of rooftop condensing units and air handlers
M01346728-I1
03/04/2026
Signed off — Alteration
ERECT AN ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01249720-I1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/25/2025
Violation issued (FDNY_NOV, closed)
08/11/2025
Filed — Alteration CO
FILING PLUMBING AND SPRINKLER WORK TYPE IN CONJUNCTION WITH ALT-CO M01172461-I1.
M01172461-S1
07/08/2025
Permit issued — Sign
M01249720-I1-SG
07/02/2025
Filed — Alteration
ERECT AN ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01249720-I1
05/27/2025
Permit issued — General Construction
M01172461-I1-GC
04/14/2025
Violation issued (FDNY_ORDER, closed)
04/14/2025
Violation issued (FDNY_ORDER, closed)
04/14/2025
Violation issued (FDNY_ORDER, closed)
04/14/2025
Violation issued (FDNY_ORDER, closed)
04/14/2025
Violation issued (FDNY_ORDER, closed)
04/09/2025
Objection resolved — Addressed
04/07/2025
Objection raised — Energy
04/01/2025
Violation issued (FDNY_NOV, closed)
Latest 60 of 190 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
41 EAST 11TH STREET15009/13/2026
NEW AMERICAN CONSTRUCTION INC707/08/2026
134 WEST 37TH STREET2607/08/2026
134W37TH ST 41E11TH ST LLC C O TFCC304/09/2026
134W37TH ST/41E11TH ST LLC C/O TFCC303/22/2026
41 E 11TH STREET1103/22/2026
41 EAST 11 STREET803/22/2026
ST. VINCENT HOSPITAL103/21/2026
G N CONSTRUCTION203/21/2026
LLC C/O THOMAS F. CAMPENNI303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROBERT DERECTOR ASSOCIATES308/18/2026
FOGARTY FINGER ARCHITECTURE PLLC108/04/2026
PAUL DENIS ASSOCIATES404/08/2026
HT ASSOCIATES208/11/2025
YOU GAO107/02/2025
ZHENG & ASSOCIATES LLC209/06/2024
TAN ENGINEERING PC407/18/2022
ZELTA DESIGN112/28/2021
CHARLES B BREEN210/12/2021
JAFPC ARCHITECT110/07/2021
ADITI SARKAR, ARCHITECT, PLLC102/18/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
INDESIGN STUDIO203/21/2026
D D EXPEDITORS403/21/2026
CHERICO KING ARCHITECT P C1003/21/2026
EA DESIGN GROUP603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STRUCTURE-CON INCGeneral Contractor603/21/2026
CENTRAL AIR CONDITIONINGGeneral Contractor504/09/2026
NEW AMERICAN CONSTRUCTION INCGeneral Contractor507/08/2026
COOPER WORKS INCGeneral Contractor307/08/2026
GANNON CONTRACTING LLCGeneral Contractor208/21/2026
ZAQ CONSTRUCTION INCGeneral Contractor203/21/2026
RICHARD GRIMAElectrical203/21/2026
ACCURATE MECHANICAL INCPlumbing207/08/2026
ACCURATE MECHANICAL INCFire Protection207/08/2026
MAGALLANES, ROBERTOElectrical103/21/2026
MEIMAROGLOU CLEANTHISElectrical103/21/2026
NEWBECK MACHINERY MOVINGElectrical103/21/2026
RAMSARRAN, RAMESHElectrical103/21/2026
ROGALSKI, MARIUSZElectrical103/21/2026
FULL CAPACITY FIRE CORPFire Protection108/26/2026
HT BUILDS LLCGeneral Contractor104/09/2026
A&A PLUMBING CORPPlumbing108/27/2026
BISHUNDAT, CHRISTOPHERElectrical103/21/2026
NEPTUNE SIGNS AWNINGSScaffold107/08/2026
CLEANTHIS MEIMAROGLOUElectrical103/21/2026
CROCITTO, JR., WILLIAMElectrical103/21/2026
FEINBERG, DElectrical103/21/2026
HESCOTT, CARDINALElectrical103/21/2026
HINKE, WILLIAMElectrical103/21/2026
HOWARD ZAMKOFFElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JS BUILDING CONSULTING4959408/18/2026
PAUL DENIS ASSOCIATES2472404/08/2026
YOU GAO9407107/02/2025
FLUSHING ENGINEERING SERV4373102/06/2025
ZHENG & ASSOCIATES LLC7330209/06/2024
TAN ENGINEERING, P.C.1291407/18/2022
ALAN MARGOLIN & ASSOC423112/28/2021
CHARLES B BREEN ASSOCIATE3812310/12/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedA&A PLUMBING CORP08/26/2026
DOB NOWSprinklersPermit IssuedFULL CAPACITY FIRE CORP08/25/2026
DOB NOWGeneral ConstructionPermit IssuedGANNON CONTRACTING LLC08/20/2026
DOB NOWMechanical SystemsPermit IssuedGANNON CONTRACTING LLC08/20/2026
DOB NOWGeneral ConstructionSigned-offCENTRAL AIR CONDITIONING03/23/2026
DOB NOWSignSigned-offDESTHERS, JOSEPH07/08/2025
DOB NOWGeneral ConstructionPermit IssuedHT BUILDS LLC05/27/2025
DOB NOWGeneral ConstructionPermit IssuedZAQ CONSTRUCTION INC05/28/2024
DOB NOWMechanical SystemsSigned-offCENTRAL AIR CONDITIONING04/19/2022
DOB NOWMechanical SystemsSigned-offCOOPER WORKS02/22/2022
DOB NOWSprinklersSigned-offACCURATE MECHANICAL INC01/04/2022
DOB NOWPlumbingSigned-offANTHONY DISABATO01/04/2022
DOB NOWGeneral ConstructionSigned-offCOOPER WORKS01/03/2022
DOB NOWSprinklersSigned-offANTHONY DISABATO12/15/2021
DOB NOWPlumbingPermit IssuedACCURATE MECHANICAL INC12/15/2021
DOB NOWMechanical SystemsSigned-offCENTRAL AIR CONDITIONING11/15/2021
DOB NOWMechanical SystemsPermit IssuedSTRUCTURE-CON INC10/29/2021
DOB NOWGeneral ConstructionPermit IssuedSTRUCTURE-CON INC10/29/2021
DOB NOWSidewalk ShedSigned-offNEW AMERICAN CONSTRUCTION03/04/2021
DOB NOWSidewalk ShedSigned-offNEW AMERICAN CONSTRUCTION03/02/2020
DOB NOWSidewalk ShedSigned-offNEW AMERICAN CONSTRUCTION02/18/2020
BISOTISSUEDA & A RESTORATION INC12/20/2021
BISOTISSUEDVIKRANT KONSTRUCTION CORP12/22/2020
BISPLISSUEDADVANCED PLUMBING MECH12/16/2020
BISPLISSUED21 PLUMBING & HEATING INC11/20/2019
BISOTISSUEDLSL CONSTRUCT SERV INC06/11/2019
BISMHISSUEDLSL CONSTRUCT SERV INC06/11/2019
BISSPISSUEDCAPITOL FIRE SPRINKLER CO12/14/2018
BISFPISSUEDRELIABLE FIRE PROT. INC12/05/2018
BISPLISSUEDZARA PLUMBING CORP11/07/2018
BISPLISSUEDRELIABLE PLBG & HTG CORP10/30/2018
BISSPISSUEDFIVE BOROUGH NYC LLC10/30/2018
BISOTISSUEDLSL CONSTRUCT SERV INC10/29/2018
BISMHISSUEDLSL CONSTRUCT SERV INC10/29/2018
BISOTISSUEDSTREAMLINE USA LLC09/19/2018
BISMHISSUEDSTREAMLINE USA LLC09/19/2018
BIS—ISSUEDCAD SIGNS NYC CORP06/13/2017
BIS—ISSUEDCAD SIGNS NYC CORP06/13/2017
BISOTISSUEDLSL CONSTRUCT SERV INC06/05/2017
BISMHISSUEDLSL CONSTRUCT SERV INC06/05/2017
+ 31 more permits on file
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
08/18/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/25/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/21/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/17/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/01/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/01/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/03/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/28/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 81
DateRequirementInspectorRole
07/27/2026HVAC-R and service water heating system controlsJulian Saavedraenergy_progress
07/27/2026MeteringJulian Saavedraenergy_progress
07/27/2026HVAC-R and service water piping design and insulationJulian Saavedraenergy_progress
07/27/2026Lighting controlsJulian Saavedraenergy_progress
07/27/2026Interior lighting powerJulian Saavedraenergy_progress
07/27/2026Fire-Resistant Penetrations and JointsJulian Saavedraspecial
07/27/2026Post-installed AnchorsJulian Saavedraspecial
07/27/2026Energy Code Compliance InspectionsJulian Saavedraprogress
07/27/2026Post-installed AnchorsJulian Saavedraspecial
07/27/2026Energy Code Compliance InspectionsJulian Saavedraprogress
07/27/2026HVAC-R and service water heating equipmentJulian Saavedraenergy_progress
07/27/2026Duct leakage testing, insulation and designJulian Saavedraenergy_progress
06/05/2026FinalJulian Saavedraprogress
06/05/2026Mechanical SystemsJulian Saavedraspecial
04/09/2026HVAC-R and service water heating system controlsPAUL DENISenergy_progress
04/09/2026Duct leakage testing, insulation and designPAUL DENISenergy_progress
04/09/2026Shutoff dampersPAUL DENISenergy_progress
04/09/2026Mechanical SystemsPAUL DENISspecial
04/09/2026Heating SystemsPAUL DENISspecial
04/09/2026Energy Code Compliance InspectionsPAUL DENISprogress
04/09/2026Fire-Resistant Penetrations and JointsPAUL DENISspecial
04/09/2026FinalPAUL DENISprogress
03/31/2026HVAC-R and service water heating system controlsPAUL DENISenergy_progress
03/31/2026Duct leakage testing, insulation and designPAUL DENISenergy_progress
03/31/2026FinalPAUL DENISprogress
Latest 25 of 81.
▾Documents — 1,349 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch22
09/03/2026M00555534-I1Contact architect ↗
09/03/2026M00563226-I1Contact architect ↗
09/03/2026M00563198-I1Contact architect ↗
Showing 3 of 22 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00311900-I1Contact architect ↗
▸Applications & Permits249
▸BISPLAN / WORK APPROVAL APPLICATION149
01/20/2022101906760Open ↗
05/06/2021140989526Open ↗
04/27/2021123357376Open ↗
Showing 3 of 149 on file for this type
▸BISWORK PERMIT APPLICATION92
05/07/2021140989526Open ↗
12/22/2020140989526Open ↗
12/16/2020123357376Open ↗
Showing 3 of 92 on file for this type
▸BISPLACE OF ASSEMBLY6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026M01172461-P1Open ↗
08/13/2026M01172461-I1Open ↗
▸Seals & Professional Certifications323
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION138
07/30/2019123370495Open ↗
07/30/2019123370495Open ↗
06/26/2019123370486Open ↗
Showing 3 of 138 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST50
05/06/2021140989526Open ↗
04/07/2021140989526Open ↗
07/20/2020123357376Open ↗
Showing 3 of 50 on file for this type
▸DOB NOWProgress Inspector Seal & Signature36
09/02/2026M01172461-I1Open ↗
09/02/2026M01172461-I1Open ↗
09/02/2026M01172461-I1Open ↗
Showing 3 of 36 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature24
09/28/2026M01412804-S1Open ↗
09/03/2026M00555534-I1Open ↗
09/03/2026M00563226-I1Open ↗
Showing 3 of 24 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT22
12/13/2020140989526Open ↗
10/29/2018123370486Open ↗
10/29/2018123370486Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/02/2026M01172461-I1Open ↗
09/02/2026M01172461-I1Open ↗
09/01/2026M00646034-I1Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/13/2020140989526Open ↗
Showing 1 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
12/13/2020140989526Open ↗
Showing 1 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
04/05/2019140841089Open ↗
11/27/2018140819684Open ↗
▸Trade Schedules & Equipment193
▸BISSCHEDULE B - PLUMBING38
04/15/2021123357376Open ↗
04/02/2021123357376Open ↗
03/31/2021123357376Open ↗
Showing 3 of 38 on file for this type
▸BISSELF-CERT PLUMBING NOTICE37
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 37 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT34
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 34 on file for this type
▸BISEQUIPMENT USE PERMITS32
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 32 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE23
06/14/2019123357376Open ↗
06/10/2019123357376Open ↗
06/03/2019123126740Open ↗
Showing 3 of 23 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISSPRINKLER INSP REPORT : FP-856
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSPRINKLER SYSTEMS1
09/03/2020123126740Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWStreet Tree Checklist2
08/13/2026M01172461-P1Open ↗
08/13/2026M01172461-I1Open ↗
▸Environmental & Asbestos87
▸BISASBESTOS: CERTIFICATION (DEP ACP5)39
04/07/2021140989526Open ↗
04/05/2019140841089Open ↗
11/27/2018140819684Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report22
09/28/2026M01412804-S1Open ↗
09/03/2026M00555534-I1Open ↗
09/03/2026M00563226-I1Open ↗
Showing 3 of 22 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance86
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS44
06/26/2019123370486Open ↗
10/29/2018123370486Open ↗
09/19/2018123357376Open ↗
Showing 3 of 44 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS20
04/18/2022140989526Open ↗
06/11/2021123357376Open ↗
06/26/2019123370486Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
04/18/2022140989526Open ↗
04/18/2022140989526Open ↗
06/11/2021123357376Open ↗
Showing 3 of 8 on file for this type
▸BISTR8: Energy Code Progress Inspections4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis4
09/03/2026M00646034-I1Open ↗
08/13/2026M00646071-I1Open ↗
08/13/2026M00706477-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
07/22/2022140989526Open ↗
06/11/2021123357376Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/13/2020140989526Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00706477-I1Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY13
07/29/2022140989526Open ↗
04/18/2022140989526Open ↗
03/11/2022101906760Open ↗
Showing 3 of 13 on file for this type
▸Approvals, Objections & Sign-offs108
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST62
08/01/2022140989526Open ↗
03/18/2022101906760Open ↗
06/11/2021123357376Open ↗
Showing 3 of 62 on file for this type
▸BISADMINISTRATIVE OBJECTIONS32
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 32 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSUPERSEDING LETTER3
05/07/2021140989526Open ↗
12/16/2020123357376Open ↗
11/21/2019123357376Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFINAL1
09/03/2020123126740Open ↗
▸Cost, Insurance & Ownership124
▸BISCOST AFFIDAVIT121
07/27/2022140989526Open ↗
04/18/2022140989526Open ↗
03/17/2022101906760Open ↗
Showing 3 of 121 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
07/22/2022140989526Open ↗
▸Filing & Intake Forms113
▸BISEFILING COVER SHEET59
10/29/2018123370486Open ↗
10/29/2018123370486Open ↗
10/29/2018123370495Open ↗
Showing 3 of 59 on file for this type
▸BISADDITIONAL INFORMATION38
03/14/2022101906760Open ↗
05/06/2021140989526Open ↗
12/08/2020123357376Open ↗
Showing 3 of 38 on file for this type
▸BISBOROUGH INTAKE FORM10
05/07/2021140989526Open ↗
12/16/2020123357376Open ↗
07/30/2019123370495Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
12/13/2020140989526Open ↗
04/05/2019140841089Open ↗
11/27/2018140819684Open ↗
Showing 3 of 6 on file for this type
▸Other Documents23
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION9
11/27/2018140819684Open ↗
Showing 1 of 9 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISFIRE SUPP ANSUL APPROVL: FD-FSS3
03/25/2019140819684Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWProperty Ownership Certification2
08/13/2026M01172461-P1Open ↗
08/13/2026M01172461-I1Open ↗
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type