← Back
Five to six families
83 WARREN STREET
MANHATTAN · BIN 1001427
💬 Discuss this project
1920Year Built
5Stories
C2Building Class
C6-2AZoning
8,560 sfGross Floor Area
5Units
Rent Stabilized5 Open Violations ▸FDNY Report ↗
Five to six families · Owner of record: 83 WARREN REALTY LLC · 1,875 sf lot · 4.57 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire ProtectionGeneral
Roof10p · 1 filing · 20 docs
Floor 59p · 1 filing · 20 docs
Floor 49p · 1 filing · 20 docs
Floor 311p · 1 filing · 20 docs
Floor 29p · 1 filing · 20 docs
Floor 17p · 1 filing · 20 docs
Cellar3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
83 WARREN REALTY2207/08/2026
CONSOLIDATED SCAFFOLDING INC.504/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/28/2023$6.0M—— → —$701/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PAUL G. JONES, P.E.106/14/2024
SCHNACKEL ENGINEERS409/06/2023
PACS ARCHITECTURE105/11/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PROCESS WERKSHOP1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SOLAS ELECTRICAL CORPElectrical203/22/2026
CROSSFIELD PLBG.&HTG.CORPFire Protection207/08/2026
ALLEN CONCEPT DESIGN CORPGeneral Contractor207/08/2026
CONSOLIDATED SCAFFOLDINGGeneral Contractor204/09/2026
VEEBEE COOLING CORPGeneral Contractor207/08/2026
CROSSFIELD PLBG.&HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HAMANN ENGINEERING, PLLC4949409/05/2023
SCHNACKEL ENGINEERS1821209/05/2023
EDRA ENGINEERING & INSPEC2820105/11/2023
Building Lifecycle
All (68)Filed (6)Permit Issued (9)Signed Off (3)Violation (5)Inspection (10)Objection (6)Special Inspection (29)
07/22/2026
Violation issued (HPD, open)
C
07/22/2026
Violation issued (HPD, open)
A
01/07/2026
Signed off — Alteration
M01065263-I1
04/03/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/03/2025
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
03/25/2025
Signed off — Alteration
Renovation of existing dwelling units on 2nd thru 5th floor. Remove/install new non-bearing partitions/finishes. Replace/install new exterior windows, Create new opening for roof stair. ST, MS, PL & SP filed separately. No change in occ use or egress.
M00872772-S2
03/20/2025
Permit issued — Sprinklers
M00872772-S3-EW-SP
02/26/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/12/2024
Signed off — Alteration
Renovation of existing dwelling units on 2nd thru 5th floor. Remove/install new non-bearing partitions/finishes. Replace/install new exterior windows, Create new opening for roof stair. ST, MS, PL & SP filed separately. No change in occ use or egress.
M00872772-S1
06/14/2024
Filed — Alteration
M01065263-I1
06/14/2024
Permit issued — Sidewalk Shed
M01065263-I1-SF
06/14/2024
Permit issued — Sidewalk Shed
M01065263-I1-SH
06/12/2024
Permit issued — General Construction
M00872772-I1-GC
05/30/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/30/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/30/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/21/2024
Permit issued — Mechanical Systems
M00872772-S1-MS
01/10/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/28/2023
Permit issued — Sprinklers
M00872772-S3-EW-SP
11/17/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/25/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/23/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/08/2023
Permit issued — Plumbing
M00872772-S2-PL
09/06/2023
Filed — Alteration
Renovation of existing dwelling units on 2nd thru 5th floor. Remove/install new non-bearing partitions/finishes. Replace/install new exterior windows, Create new opening for roof stair. ST, MS, PL & SP filed separately. No change in occ use or egress.
M00872772-P1
09/06/2023
Permit issued — Mechanical Systems
M00872772-S1-MS
09/06/2023
Special inspection requirement — Tenant Protection Plan Compliance
CARL HAMANN
09/05/2023
Filed — Alteration
Renovation of existing dwelling units on 2nd thru 5th floor. Remove/install new non-bearing partitions/finishes. Replace/install new exterior windows, Create new opening for roof stair. ST, MS, PL & SP filed separately. No change in occ use or egress.
M00872772-S3
08/31/2023
Special inspection requirement — Tenant Protection Plan Compliance
07/28/2023
Filed — Alteration
Renovation of existing dwelling units on 2nd thru 5th floor. Remove/install new non-bearing partitions/finishes. Replace/install new exterior windows, Create new opening for roof stair. ST, MS, PL & SP filed separately. No change in occ use or egress.
M00872772-S2
07/19/2023
Filed — Alteration
Renovation of existing dwelling units on 2nd thru 5th floor. Remove/install new non-bearing partitions/finishes. Replace/install new exterior windows, Create new opening for roof stair. ST, MS, PL & SP filed separately. No change in occ use or egress.
M00872772-S1
07/17/2023
Special inspection requirement — Tenant Protection Plan Compliance
CARL HAMANN
07/13/2023
Special inspection requirement — Sprinkler Systems
Gregory Schnackel
07/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CARL HAMANN
07/11/2023
Special inspection requirement — Energy Code Compliance Inspections
Gregory Schnackel
07/06/2023
Permit issued — General Construction
M00872772-I1-GC
06/28/2023
Special inspection requirement — Ventilation and air distribution system
Gregory Schnackel
06/28/2023
Special inspection requirement — HVAC-R and service water heating system controls
Gregory Schnackel
06/28/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Gregory Schnackel
06/28/2023
Special inspection requirement — Duct leakage testing, insulation and design
Gregory Schnackel
06/28/2023
Special inspection requirement — Tenant Protection Plan Compliance
CARL HAMANN
06/28/2023
Special inspection requirement — Mechanical Systems
Gregory Schnackel
06/28/2023
Special inspection requirement — Heating Systems
Gregory Schnackel
06/28/2023
Special inspection requirement — Final
Gregory Schnackel
06/28/2023
Special inspection requirement — HVAC-R and service water heating equipment
Gregory Schnackel
05/21/2023
Objection raised — Structural
05/21/2023
Objection resolved — Addressed
05/21/2023
Objection raised — Other
05/21/2023
Objection resolved — Addressed
05/21/2023
Objection raised — Admin
05/21/2023
Objection resolved — Addressed
05/11/2023
Filed — Alteration
Renovation of existing dwelling units on 2nd thru 5th floor. Remove/install new non-bearing partitions/finishes. Replace/install new exterior windows, Create new opening for roof stair. ST, MS, PL & SP filed separately. No change in occ use or egress.
M00872772-I1
05/10/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
EDWARD RACZKOWSKI
05/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CARL HAMANN
05/10/2023
Special inspection requirement — Tenant Protection Plan Compliance
CARL HAMANN
05/10/2023
Special inspection requirement — Final
Aleksander Shkreli
05/10/2023
Special inspection requirement — Energy Code Compliance Inspections
Aleksander Shkreli
05/10/2023
Special inspection requirement — Fire-Resistance Rated Construction
Aleksander Shkreli
05/10/2023
Special inspection requirement — Air barrier - visual inspection
Aleksander Shkreli
05/10/2023
Special inspection requirement — Lighting controls
Aleksander Shkreli
05/10/2023
Special inspection requirement — Insulation placement and R values
Aleksander Shkreli
Latest 60 of 68 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedCROSSFIELD PLBG.&HTG.CORP03/20/2025
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING06/14/2024
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING06/14/2024
DOB NOWGeneral ConstructionPermit IssuedALLEN CONCEPT DESIGN CORP06/12/2024
DOB NOWMechanical SystemsSigned-offVEEBEE COOLING CORP03/21/2024
DOB NOWSprinklersPermit IssuedCROSSFIELD PLBG.&HTG.CORP11/28/2023
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG09/08/2023
DOB NOWMechanical SystemsSigned-offVEEBEE COOLING CORP09/06/2023
DOB NOWGeneral ConstructionPermit IssuedALLEN CONCEPT DESIGN CORP07/06/2023
BISOTISSUEDCOOPER SQUARE BUILDERS10/03/1995
1 project · most recent 09/06/2023
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/06/2023Permit IssuedALLEN CONCEPT DESIGN CORPHeating and Air Conditioning Systems
Heat / Cool
Fujitsu AOU60RLAVM4 5 tons · Heat Pump Outdoor ×4
1 project · most recent 09/06/2023
FiledStatusContractorScope
09/06/2023Permit IssuedCROSSFIELD PLBG.&HTG.CORP39 heads
1 project · most recent 09/06/2023
Gas Water/Sanitary
FiledStatusContractorScope
09/06/2023Signed-offCROSSFIELD PLBG.&HTGGas, Water/Sanitary
4 projects · most recent 10/18/2024
General Wiring
FiledStatusContractorScope
10/18/2024CompleteGOODALL ELECTRIC CORPGeneral Wiring
08/25/2024CompleteR & T ELECTRICAL CORP4 meters, 4 new_meters
06/26/2024CompleteSOLAS ELECTRICAL CORP—
06/12/2024CompleteSOLAS ELECTRICAL CORP—
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
04/03/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/03/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
02/26/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/30/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/30/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/30/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/10/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/17/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/25/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/23/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
09/06/2023Tenant Protection Plan ComplianceCARL HAMANNspecial
08/31/2023Tenant Protection Plan Compliance—special
07/17/2023Tenant Protection Plan ComplianceCARL HAMANNspecial
07/13/2023Sprinkler SystemsGregory Schnackelspecial
07/13/2023Fire-Resistant Penetrations and JointsCARL HAMANNspecial
07/11/2023Energy Code Compliance InspectionsGregory Schnackelprogress
06/28/2023Ventilation and air distribution systemGregory Schnackelenergy_progress
06/28/2023HVAC-R and service water heating system controlsGregory Schnackelenergy_progress
06/28/2023HVAC-R and service water piping design and insulationGregory Schnackelenergy_progress
06/28/2023Duct leakage testing, insulation and designGregory Schnackelenergy_progress
06/28/2023Tenant Protection Plan ComplianceCARL HAMANNspecial
06/28/2023Mechanical SystemsGregory Schnackelspecial
06/28/2023Heating SystemsGregory Schnackelspecial
06/28/2023FinalGregory Schnackelprogress
06/28/2023HVAC-R and service water heating equipmentGregory Schnackelenergy_progress
05/10/2023Structural Stability – Alterations of existing buildingsEDWARD RACZKOWSKIspecial
05/10/2023Fire-Resistant Penetrations and JointsCARL HAMANNspecial
05/10/2023Tenant Protection Plan ComplianceCARL HAMANNspecial
05/10/2023FinalAleksander Shkreliprogress
05/10/2023Energy Code Compliance InspectionsAleksander Shkreliprogress
05/10/2023Fire-Resistance Rated ConstructionAleksander Shkreliprogress
05/10/2023Air barrier - visual inspectionAleksander Shkrelienergy_progress
05/10/2023Lighting controlsAleksander Shkrelienergy_progress
05/10/2023Insulation placement and R valuesAleksander Shkrelienergy_progress
05/10/2023Fenestration air leakageAleksander Shkrelienergy_progress
Latest 25 of 29.
▾Documents — 38 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/29/2026M00872772-S2Request digital key ↗
08/29/2026M00872772-S1Request digital key ↗
08/29/2026M00872772-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications27
▸DOB NOWProgress Inspector Seal & Signature11
08/28/2026M00872772-S1Open ↗
08/28/2026M00872772-S1Open ↗
08/28/2026M00872772-S1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026M00872772-S2Open ↗
08/28/2026M00872772-S1Open ↗
08/28/2026M00872772-S1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/13/2026M00872772-P1Open ↗
08/13/2026M00872772-S1Open ↗
08/13/2026M00872772-I1Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWFDNY: Letter of No Objection1
08/13/2026M00872772-S3Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/13/2026M00872772-S1Open ↗
08/13/2026M00872772-S3Open ↗
08/13/2026M00872772-S2Open ↗
Showing 3 of 4 on file for this type