← Back
BuildNYC
Over six families without stores
83 WOODRUFF AVENUE
BROOKLYN · BIN 3115922
💬 Discuss this project
1920Year Built
5Stories
C1Building Class
R7AZoning
14,760 sfGross Floor Area
17Units
Rent Stabilized23 Active Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: Woodruff 79 · 5,353 sf lot · 2.76 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 43p · 1 filing · 20 docs
Floor 33p · 1 filing · 20 docs
Floor 2Unit 2A, Unit 2B, Unit 2C +215p · 2 filings · 20 docs
Floor 1Sidewalk shed installation9p · 2 filings · 20 docs
Basement3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
B&G Real Estate807/08/2026
Woodruff 79203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rise Architecture301/26/2023
Rise Architecture NJ106/08/2021
Haider Engineering, P.E.107/19/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Jack Jaffa & Associates803/21/2026
Haider Engineering, P.E.103/21/2026
Haider Engineering P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Bluerock Development & CoGeneral Contractor603/21/2026
AP Plumbing & HVACPlumbing507/08/2026
J & G Construction ServicesScaffold303/21/2026
Jeff AkermanElectrical103/21/2026
Milazzo Design and ExpElectrical103/21/2026
Smalls Mechanical & Electrical ServiceElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Sia Inspections7306401/26/2023
Building Lifecycle
04/18/2025
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 1C,…
HPD violation · closed
04/18/2025
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM…
HPD violation · open
04/18/2025
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM NORTH…
HPD violation · open
04/18/2025
§ 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTE PIPE AT SINK IN THE KITCHEN LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM…
HPD violation · closed
04/18/2025
§ 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 1C, 1st STORY, 1st…
HPD violation · closed
87 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBluerock Development & Co08/18/2022
DOB NOWPlumbingSigned-offCrossfield Plumbing & Heating07/02/2021
DOB NOWGeneral ConstructionPermit IssuedBluerock Development & Co06/15/2021
DOB NOWSidewalk ShedSigned-offJ & G Construction Services07/19/2018
2 projects · most recent 10/20/2021
General Wiring
FiledStatusContractorScope
10/20/2021CompleteSmalls Mechanical & Electrical ServiceGeneral Wiring
07/18/2018CompleteWCK Electric—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
09/08/2022Pass-Final CND-Occupancy InspectionPassView ↗
01/25/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/25/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/07/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/07/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/04/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
02/08/2023Fire-Resistant Penetrations and JointsJEFF AKERMANspecial
02/08/2023Post-installed AnchorsSOFIA KAPELYANspecial
02/08/2023Structural Stability – Alterations of existing buildingsSOFIA KAPELYANspecial
02/08/2023Fire-Resistance Rated ConstructionJEFF AKERMANprogress
02/08/2023Energy Code Compliance InspectionsJEFF AKERMANprogress
02/08/2023Interior lighting powerJEFF AKERMANenergy_progress
02/08/2023Lighting in dwelling unitsJEFF AKERMANenergy_progress
09/29/2022Fire-Resistant Penetrations and JointsJEFF AKERMANspecial
09/29/2022Post-installed AnchorsSOFIA KAPELYANspecial
09/29/2022Structural Stability – Alterations of existing buildingsSOFIA KAPELYANspecial
09/29/2022Energy Code Compliance InspectionsJEFF AKERMANprogress
09/29/2022Fire-Resistance Rated ConstructionJEFF AKERMANprogress
09/29/2022Lighting in dwelling unitsJEFF AKERMANenergy_progress
09/29/2022Interior lighting powerJEFF AKERMANenergy_progress
40 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account