HPD01/26/2026§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES THAT IS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 4H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD01/26/2026§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF KEY OPERATED LOCK AT ENTRANCE DOOR TO ROOM WITH FIRE ESCAPE IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 4H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD01/26/2026§ 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS THAT IS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 4H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
DOB12/12/2025STRUCTURE RENDERING NON-COMPLIANT. AT UNIT 7C, THERE ARE CEILING CRACKS AND NAILS PUNCTURES AT SEVERAL LOCATIONS WITHIN THE CONDOMINIUM. UNIT 7C IS THE LAST FLOOR OF THE BUILDING. UPON INSPECTION, BUILDING HAS A PERMIT TO DO SOLAR PANELS AT ROOF LEVEL (PERMIT # S01101664).
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
HPD03/09/2023§ 27-2005, 2007 HMC: REMOVE THE ILLEGAL DOUBLE CYLINDER KEY OPERATED LOCKING DEVICE AT DOOR .. IN THE ENTRANCE LOCATED AT APT 7F, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH
DOB02/22/2023FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
DOB08/30/2013FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012
DOB11/30/2007V-DOB VIOLATION - ACTIVE
DOB01/31/2005V-DOB VIOLATION - ACTIVE
DOB06/04/1993V-DOB VIOLATION - ACTIVE
ECB12/04/2020FAILURE TO INSTITUTE AND MAINTAIN ALL SAFETY MEASURES. AT THE TIME OF INSPECTION ACTIVE JOB SITE,FACADE REPAIR IN PROGRESS. I OBSERVED INADEQUATE OVERHEAD PROTECTION AT EXP#1,2 AND 4,AND NO OHP AT EXP#3(NO CONTNothing owed — awaiting certificate of correction
ECB12/04/2020BC 3314.3.3 DRAWINGS. AT THE TIME OF INSPECTION ACTIVE JOB SITE,FACADEREPAIR IN PROGRESS. I OBSERVED C-HOOK SUSPENDED SCAFFOLDS INSTALLED ATEXP#3 FOR FACADE REPAIR OPERATION. UPON REQUEST TO SEE DESIGN DRAWINGSNothing owed — awaiting certificate of correction
Condo, residential unit in elevator building · Owner of record: HIGHVIEW CONDO I · 24,700 sf lot · 2.28 FAR built · Flood zone X