← Back
Condo, residential unit in elevator building
Highview Condominium
830 HOWARD AVENUE · BIN 5015638
💬 Discuss this project
1981Year Built
6Stories
R4Building Class
R3-2Zoning
56,375 sfGross Floor Area
66Units
Rent Stabilized14 Open Violations 12 unresolved · 2 paperwork only ▸FISP: SWARMPFDNY Report ↗
Condo, residential unit in elevator building · Owner of record: HIGHVIEW CONDO I · 24,700 sf lot · 2.28 FAR built · Flood zone X
Locations of Work
StructuralGeneral
Roof2p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RENNON CONSTRUCTION1007/08/2026
GATEWAY ARMS REALTY603/22/2026
K.E.S. CONSTRUCTION CO IN103/22/2026
HIGHVIEW CONDOMINIUM I503/22/2026
C.M.A INC103/22/2026
JUNK BOYZ PRESERVATION CORP.103/22/2026
SAMBAR ELECTRIC CORP103/21/2026
HIGHVIEW CONDO GATEWAY ARMS REAL203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ETRECTE LLC104/14/2025
KMB DESIGN GROUP, LLC103/15/2023
GREEN DESIGN312/10/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSTRUCTION PERMIT SERVICES103/21/2026
ARC DESIGN AND CONSULTING LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EISENSTEIN, SAMUELElectrical303/21/2026
BEST ENERGY POWER 2015 LLGeneral Contractor303/21/2026
RENNON CONSTRUCTION CORPGeneral Contractor307/08/2026
MICHAEL KRAMERElectrical103/21/2026
MORRIS, DAVIDElectrical103/21/2026
BERGER QUALITY ELEC'L CONElectrical103/22/2026
RIGGING NYC CONTRACTORSElectrical103/21/2026
SCHULMAN, MElectrical103/21/2026
IRONBO, INCGeneral Contractor107/08/2026
ODYSSIA GLOBAL COMM. CORPGeneral Contractor107/08/2026
POWERHOUSE ELEC'L CONT IElectrical103/22/2026
KRAMER MICHAELElectrical103/21/2026
MICHAEL GAMBARDELLAElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAMES A CLANCY9176104/14/2025
KMB DESIGN GROUP, LLC513103/15/2023
Building Lifecycle
All (93)Filed (5)Permit Issued (5)Signed Off (3)Facade (FISP) (12)Violation (59)Objection (4)Special Inspection (5)
03/11/2026
Violation issued (HPD, closed)
A
03/04/2026
Signed off — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
S01101664-I1
01/26/2026
Violation issued (HPD, open)
B
01/26/2026
Violation issued (HPD, open)
B
01/26/2026
Violation issued (HPD, open)
B
01/26/2026
Violation issued (HPD, closed)
C
01/26/2026
Violation issued (HPD, closed)
C
01/26/2026
Violation issued (HPD, closed)
C
01/26/2026
Violation issued (HPD, closed)
C
01/26/2026
Violation issued (HPD, closed)
C
01/26/2026
Violation issued (HPD, closed)
C
01/26/2026
Violation issued (HPD, closed)
C
12/12/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/12/2025
Violation issued (HPD, closed)
A
05/07/2025
Permit issued — Solar
S01101664-I1-SL
05/05/2025
Signed off — Alteration
Modification to existing Verizon site. Replace 6 antennas and 6 RRH units, install 3 new antennas, remove 1 existing equipment cabinet, and install new platform with related equipment cabinets on roof.
S00801278-I1
04/14/2025
Filed — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
S01101664-I1
01/28/2025
Permit issued — Antenna
S00801278-I1-AN
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Clancy
08/26/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
James Clancy
08/26/2024
Special inspection requirement — Energy Code Compliance Inspections
James Clancy
08/26/2024
Special inspection requirement — Final
James Clancy
08/26/2024
Special inspection requirement — Air barrier - visual inspection
James Clancy
07/19/2023
Cycle 9 facade report signed — SWARMP
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/31/2023
Violation issued (ECB, closed)
Construction
05/19/2023
Permit issued — Antenna
S00801278-I1-AN
03/29/2023
Violation issued (HPD, closed)
A
03/15/2023
Filed — Alteration
Modification to existing Verizon site. Replace 6 antennas and 6 RRH units, install 3 new antennas, remove 1 existing equipment cabinet, and install new platform with related equipment cabinets on roof.
S00801278-I1
03/15/2023
Objection raised — Zoning
03/15/2023
Objection resolved — Addressed
03/15/2023
Objection raised — Fire_Protection
03/15/2023
Objection resolved — Addressed
03/13/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.
S00308147-I1
03/09/2023
Violation issued (HPD, closed)
C
03/09/2023
Violation issued (HPD, closed)
C
03/09/2023
Violation issued (HPD, closed)
C
03/09/2023
Violation issued (HPD, closed)
C
03/09/2023
Violation issued (HPD, open)
C
02/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/19/2023
Cycle 9 facade report submitted
01/17/2023
Cycle 9 facade inspection completed
03/08/2022
Violation issued (HPD, closed)
A
12/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/08/2021
Permit issued — Sidewalk Shed
S00308147-I1-SH
03/03/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/10/2020
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.
S00308147-P2
12/04/2020
Violation issued (ECB, closed)
Construction
12/04/2020
Violation issued (ECB, open)
Construction
12/04/2020
Violation issued (ECB, open)
Construction
09/01/2020
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.
S00308147-P1
02/03/2020
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.
S00308147-I1
02/03/2020
Permit issued — Sidewalk Shed
S00308147-I1-SH
04/17/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/11/2018
Cycle 8 facade report submitted
01/09/2018
Cycle 8 facade report signed — SWARMP
12/21/2017
Cycle 8 facade inspection completed
04/07/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/07/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offBEST ENERGY POWER 2015 LL05/07/2025
DOB NOWAntennaSigned-offIRONBO01/28/2025
DOB NOWAntennaSigned-offODYSSIA GLOBAL COMM. CORP05/19/2023
DOB NOWSidewalk ShedSigned-offRENNON CONSTRUCTION CORP03/08/2021
DOB NOWSidewalk ShedSigned-offRENNON CONSTRUCTION CORP02/03/2020
BISOTISSUEDK.E.S CONSTRUCTION CO INC08/20/2020
BISOTISSUEDRITEWAY TANK MAINTENANCE10/23/2017
BISOTISSUEDEC ELECTRICAL CONTRACTOR03/30/2017
BISOTISSUEDTELCOM ENGINEERING GP INC07/01/2013
BISOTISSUEDTELCOM ENGINEERING GP INC05/31/2013
BISOTISSUEDBARAN TELECOM INC.,ET AL02/15/2008
BISOTISSUEDKNS BUILDING REST. INC09/26/2003
BISOTISSUEDANTENNA CABLING CO. LLC07/19/2000
6 projects · most recent 12/09/2025
General Wiring
FiledStatusContractorScope
12/09/2025CompleteBERGER QUALITY ELEC'L CON—
09/11/2024CompleteTRUE ELECTRIC CORP.—
12/06/2023Permit IssuedPLAZA ELEC'L CONTR'S. INCGeneral Wiring
11/05/2020CompleteJ.P.E. ELEC'L CONTR'S INCGeneral Wiring
04/01/2020CompletePOWERHOUSE ELEC'L CONT IGeneral Wiring
02/04/2020Permit IssuedRICHARD NEU—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/26/2024Fire-Resistant Penetrations and JointsJames Clancyspecial
08/26/2024Structural Stability – Alterations of existing buildingsJames Clancyspecial
08/26/2024Energy Code Compliance InspectionsJames Clancyprogress
08/26/2024FinalJames Clancyprogress
08/26/2024Air barrier - visual inspectionJames Clancyenergy_progress
▾Documents — 101 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch - Sidewalk Shed3
08/26/2026S00308147-I1Request digital key ↗
08/15/2026S00308147-P2Request digital key ↗
08/15/2026S00308147-P1Request digital key ↗
▸DOB NOWPlans/Sketch2
08/23/2026S00801278-I1Request digital key ↗
08/19/2026S01101664-I1Request digital key ↗
▸Applications & Permits15
▸BISWORK PERMIT APPLICATION7
08/20/2020540180472Open ↗
10/20/2017540136770Open ↗
10/20/2017540136770Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
08/12/2020540180472Open ↗
10/20/2017540136770Open ↗
11/29/2016520283639Open ↗
Showing 3 of 6 on file for this type
▸BISSIDEWALK SHED APPLICATION & PERMIT1
08/20/2020540180472Open ↗
▸BISRAISE/MOVE DOCS & DS1 (FOR AL/EW-OT PERMITS)1
01/29/2019540136770Open ↗
▸Seals & Professional Certifications21
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
04/11/2019540136770Open ↗
08/01/2017520283639Open ↗
11/29/2016520283639Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/19/2026S01101664-I1Open ↗
08/13/2026S00801278-I1Open ↗
08/13/2026S00308147-P2Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
08/12/2020540180472Open ↗
10/20/2017540136770Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/12/2020540180472Open ↗
10/20/2017540136770Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
08/12/2020540180472Open ↗
10/20/2017540136770Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/25/2026S01101664-I1Open ↗
09/25/2026S01101664-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/25/2026S01101664-I1Open ↗
▸Trade Schedules & Equipment4
▸BISFA - FDNY APPROVAL : FD-FAA3
04/11/2019540136770Open ↗
01/23/2017520283639Open ↗
06/03/2013520140838Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
10/20/2017540136770Open ↗
▸Safety & Tenant Protection6
▸BISTENANT PROTECTION PLAN AND NOTES3
08/12/2020540180472Open ↗
10/20/2017540136770Open ↗
11/29/2016520283639Open ↗
▸DOB NOWTenant Protection Plan3
08/13/2026S00308147-I1Open ↗
08/13/2026S00308147-P1Open ↗
08/13/2026S00308147-P2Open ↗
▸Environmental & Asbestos7
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
08/12/2020540180472Open ↗
10/20/2017540136770Open ↗
11/29/2016520283639Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/19/2026S01101664-I1Open ↗
08/13/2026S00801278-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
01/31/2008510027855Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
04/11/2019540136770Open ↗
08/01/2017520283639Open ↗
11/29/2016520283639Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
04/11/2019540136770Open ↗
08/01/2017520283639Open ↗
06/24/2014520140838Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/12/2020540180472Open ↗
▸BISNYCECC ANALYSIS1
08/12/2020540180472Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/27/2022540180472Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY5
05/27/2022540180472Open ↗
05/27/2022540180472Open ↗
08/20/2020540180472Open ↗
Showing 3 of 5 on file for this type
▸BISHYDRO FLOW TEST LETTER1
04/11/2019540136770Open ↗
▸Approvals, Objections & Sign-offs8
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
06/10/2022540180472Open ↗
04/11/2019540136770Open ↗
10/27/2017520283639Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
05/13/2013520140838Open ↗
01/31/2008510027855Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01101664-I1Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
05/31/2022540180472Open ↗
08/12/2020540180472Open ↗
04/11/2019540136770Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms9
▸BISADDITIONAL INFORMATION3
08/12/2020540180472Open ↗
08/12/2020540180472Open ↗
01/14/2014520140838Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
08/12/2020540180472Open ↗
10/20/2017540136770Open ↗
▸BISBOROUGH INTAKE FORM2
04/11/2019540136770Open ↗
10/27/2017520283639Open ↗
▸BISEFILING COVER SHEET2
11/29/2016520283639Open ↗
05/13/2013520140838Open ↗
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
04/11/2019540136770Open ↗