Public elementary, junior or senior high
Fort Hamilton High School
8301 SHORE ROAD · BIN 3152318
💬 Discuss this project
1940Year Built
3Stories
W1Building Class
PARKZoning
286,000 sfGross Floor Area
1Units
LL97 Covered14 Open Violations 9 unresolved · 5 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 550,000 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneralOther
Permit Issued — active, not yet Signed-off
Roof5p · 2 filings · 20 docs
Floor 3Under Construction28p · 2 filings · 20 docs
Floor 2Under Construction22p · 1 filing · 20 docs
Floor 1Under Construction28p · 2 filings · 20 docs
CellarUnder Construction40p · 3 filings · 20 docs
Sub-CellarUnder Construction41p · 1 filing · 20 docs
BasementUnder Construction14p · 3 filings · 20 docs
Sub-BasementUnder Construction70p · 2 filings · 20 docs
5 jobs · most recent 08/11/2026
Air Conditioning Systems Heating and Air Conditioning Systems Heating Systems Generators Refrigeration Systems Associated Ducts and Piping Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/11/2026——Generators, Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PKA-AK12NL 12,000 BTU · Split System ×1
PKA-AL18NL 18,000 BTU · Split System ×1
PUY-AK12NL 12,000 BTU · Split System ×1
PUY-AK18NL 18,000 BTU · Split System ×1
Generators
Caterpillar C9 300 kW · Generator ×1
04/21/2026Permit IssuedINDEPENDENT TEMPERATUREHeating Systems
Heating
Burnham Model 2L‑800 30,800 BTU ×1
03/12/2026——Air Conditioning Systems, Refrigeration Systems
Cooling
Samsung AC018DNADCG/AA 18,000 BTU · Vrf Indoor ×1
AC018DXSCCG/AA 18,000 BTU · Vrf Indoor ×1
Refrigeration
Bally BLP108MA-S1E 7,220 BTU · Refrigeration Unit ×2
BLP209LE-S2E 7,392 BTU · Refrigeration Unit ×2
BEZA007H9-HT3E - ACCU-3 7,220 BTU · Condensing Unit ×1
BEZA007H9-HT3E - ACCU-4 7,220 BTU · Condensing Unit ×1
BEZA020L9-HT3E 7,392 BTU · Condensing Unit ×1
BEZA020L9-HT3E - ACCU-2 7,392 BTU · Condensing Unit ×1
09/13/2023Permit IssuedINDEPENDENT TEMPERATUREAir Conditioning Systems, Associated Ducts and Piping, Heating and Air Conditioning Systems, Heating Systems
Cooling
Mitsubishi Electric PKA-A36KA7 810 CFM · Split System ×1
Heat / Cool
Mitsubishi Electric PUY-A36NKA7 3,880 CFM · Condensing Unit ×1
Heating
Qmark MUH-05-81 17,000 BTU · Electric Heater ×6
Vulcan LB-5350 5,973 BTU · Baseboard ×3
Modine HDS 30 24,600 BTU ×1
Ventilation
Magic-Aire MAUVF-2 750 CFM · Vav Box ×2
Ducts & Piping
Taco PF 22-51-2-NH 318,000 BTU · Heat Exchanger ×3
Beckett CB201TUL 120 kW · Pump ×2
06/11/2021Permit IssuedGRIDSPAN CORPORATIONAir Conditioning Systems
Cooling
Mitsubishi Electric PUMY-HP36NKMU1 36,000 BTU · Vrf Outdoor ×1
4 jobs · most recent 08/11/2026
Water/Sanitary Gas Storm
FiledStatusContractorScope
08/11/2026——Gas, Storm, Water/Sanitary
02/05/2025Permit IssuedFORSYTHE P&H CORPWater/Sanitary
04/16/2024Permit IssuedV. C. VITANZA SONS INCWater/Sanitary
09/13/2023Permit IssuedV. C. VITANZA SONS INCGas, Storm, Water/Sanitary
25 jobs · most recent 02/25/2026
General Wiring
FiledStatusContractorScope
02/25/2026Permit IssuedSELECTRIC ELECL CONT CO IGeneral Wiring
01/30/2026Permit IssuedA & S ELECTRIC INC.General Wiring
06/26/2025CompleteEVEREST ELECTRIC CORP—
06/25/2025CompleteEVEREST ELECTRIC CORP—
04/01/2025CompleteSTANCO SYSTEM ELEC'L CONTGeneral Wiring
06/18/2024Permit IssuedA & S ELECTRIC INC.General Wiring
06/05/2024Permit IssuedA & S ELECTRIC INC.General Wiring
11/29/2023Permit IssuedA & S ELECTRIC INC.General Wiring
10/30/2023Permit IssuedA & S ELECTRIC INC.General Wiring
09/26/2023Permit IssuedACE ELEC'L CONSTRUCTIONGeneral Wiring
09/11/2023Permit IssuedRODEL ELEC'L CONTR'S, INGeneral Wiring
05/19/2023Permit IssuedHEXAGON CONST & ELECL GRPGeneral Wiring
05/15/2023Permit IssuedA & S ELECTRIC INC.General Wiring
03/03/2023CompleteGEMINI ELECTRIC CO., INC.—
10/04/2022Permit IssuedNUNEZ ELECTRIC INC.—
3 jobs · most recent 08/11/2026
Concrete
FiledStatusContractorScope
08/11/2026——3 scope_items
04/29/2026Permit IssuedISLAND FOUNDATIONS CORP3 scope_items
02/05/2025Permit IssuedFORSYTHE P&H CORPConcrete
5 jobs · most recent 04/27/2026
Fence
FiledStatusContractorScope
04/27/2026Permit IssuedT.A. AHERN CONTRACTO CORPFence
04/21/2026Permit IssuedCHAMPION COMBUSTION CORPFence
03/06/2025Permit IssuedHIMA GROUP INCFence
03/30/2023Permit IssuedCM&E CON, INCFence
10/03/2022Permit IssuedMARIC PLUMBING & HEATINGFence
Building Lifecycle
All (254)Filed (47)Permit Issued (46)Signed Off (2)Violation (60)Inspection (7)Objection (62)Special Inspection (30)
09/04/2026
Objection resolved — Open
09/04/2026
Objection resolved — Open
09/04/2026
Objection resolved — Open
09/04/2026
Objection resolved — Resolved
09/04/2026
Special inspection requirement — Structural Steel - Details
09/04/2026
Special inspection requirement — Structural Steel - Welding
09/04/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
08/19/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
08/17/2026
Objection raised — Other
08/17/2026
Objection raised — Other
08/17/2026
Objection raised — Other
08/17/2026
Objection raised — Other
08/11/2026
Filed — Alteration
Selective Removals of Existing HVAC Equipment, Supports and Piping, Install New Pipe Insulation, Waterproofing, ,1-Emergency Generator, 2-Split System Ductless Units (AC-1, AC-2, ACCU-1 and ACCU-2) Exhaust Fan (EF-1)
B01438293-S2
08/11/2026
Filed — Alteration
Selective Removals of Existing HVAC Equipment, Supports and Piping, Install New Pipe Insulation, Waterproofing, ,1-Emergency Generator, 2-Split System Ductless Units (AC-1, AC-2, ACCU-1 and ACCU-2) Exhaust Fan (EF-1)
B01438293-S3
08/11/2026
Filed — Alteration
Selective Removals of Existing HVAC Equipment, Supports and Piping, Install New Pipe Insulation, Waterproofing, ,1-Emergency Generator, 2-Split System Ductless Units (AC-1, AC-2, ACCU-1 and ACCU-2) Exhaust Fan (EF-1)
B01438293-I1
08/11/2026
Filed — Alteration
Selective Removals of Existing HVAC Equipment, Supports and Piping, Install New Pipe Insulation, Waterproofing, ,1-Emergency Generator, 2-Split System Ductless Units (AC-1, AC-2, ACCU-1 and ACCU-2) Exhaust Fan (EF-1)
B01438293-S1
08/11/2026
Special inspection requirement — Deep Foundation Elements
08/11/2026
Special inspection requirement — Concrete - Cast-In-Place
08/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/10/2026
Special inspection requirement — Emergency and Standby Power Systems (Generator)
08/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
08/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/29/2026
Special inspection requirement — Final
07/29/2026
Special inspection requirement — Footing and Foundation
07/29/2026
Special inspection requirement — Final
07/29/2026
Special inspection requirement — Mechanical Systems
07/28/2026
Permit issued — Boiler Equipment
B00928624-S2-BE
06/02/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/02/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/02/2026
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
05/13/2026
Permit issued — Boiler Equipment
B01380406-S1-BE
05/13/2026
Violation issued (ECB, open)
Construction
05/07/2026
Permit issued — Mechanical Systems
B01380406-I1-MS
05/07/2026
Permit issued — Support of Excavation
B01365266-I1-SE
05/05/2026
Permit issued — Construction Fence
B01380406-S2-FN
05/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MAXIM KORNGOLD
05/04/2026
Special inspection requirement — Energy Code Compliance Inspections
MAXIM KORNGOLD
04/29/2026
Filed — Alteration
EXCAVATION WITH TEMPORARY TRENCH PROTECTION USING DOUBLE-WALL TRENCH SHIELDS. FIILING IS IN CONJUNCTION WITH DOB# B00928624-I1. NO PERMANENT SOE SYSTEM.
B01365266-P1
04/29/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MAXIM KORNGOLD
04/27/2026
Filed — Alteration
INSTALLATION OF 8 FEET HIGH CONSTRUCTION FENCE TO SECURE THE STAGING AREA AND INSTSALL NEW EQUIPMENT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01338448-P1
04/27/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MAXIM KORNGOLD
04/23/2026
Objection raised — Other
04/23/2026
Objection resolved — Addressed
04/23/2026
Objection raised — Other
04/23/2026
Objection resolved — Addressed
04/21/2026
Filed — Alteration
INSTALLATION OF FUEL TANK CONNECTED TO MOBILE TRAILER UNIT TO PROVIDE TEMPORARY HEAT TO THE BUILDING.
B01380406-S2
04/15/2026
Filed — Alteration
INSTALLATION OF FUEL TANK CONNECTED TO MOBILE TRAILER UNIT TO PROVIDE TEMPORARY HEAT TO THE BUILDING.
B01380406-S1
04/15/2026
Filed — Alteration
INSTALLATION OF FUEL TANK CONNECTED TO MOBILE TRAILER UNIT TO PROVIDE TEMPORARY HEAT TO THE BUILDING.
B01380406-I1
04/15/2026
Objection resolved — Addressed
04/15/2026
Special inspection requirement — Post-installed Anchors
MAXIM KORNGOLD
04/15/2026
Special inspection requirement — Chimneys and vents
MAXIM KORNGOLD
04/10/2026
Objection resolved — Addressed
04/10/2026
Objection resolved — Addressed
04/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/10/2026
Special inspection requirement — Post-installed Anchors
04/01/2026
Permit issued — Mechanical Systems
B00928624-S1-MS
04/01/2026
Permit issued — Plumbing
B00928624-S5-PL
03/31/2026
Permit issued — Plumbing
B00928624-S3-PL
03/30/2026
Permit issued — General Construction
B00928624-I1-GC
03/30/2026
Objection raised — Other
Latest 60 of 254 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY11309/15/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
DOE 0401003/22/2026
DEPARTMENT OF EDUCATION1203/22/2026
DOE FORT HAMILTON HS 040403/22/2026
BOE 040103/22/2026
VENUS103/21/2026
NYC DEPARTMENT OF PARKS REC703/21/2026
DEPARTMENT OF DESIGN & CONST.203/21/2026
NY SCHOOL CONSTRUCTION AUTHORITY3303/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RA3603/21/2026
DIRECT ACCESS EXPEDITING, INC.203/21/2026
AK CONSULTING SERVICES603/21/2026
DDT ENGINEERING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CM&E CON, INCGeneral Contractor1707/08/2026
MARIC PLUMBING & HEATINGGeneral Contractor1507/08/2026
FORSYTHE P&H CORPPlumbing807/08/2026
GRIDSPAN CORPORATIONGeneral Contractor603/21/2026
V. C. VITANZA SONS INCPlumbing407/29/2026
T.A. AHERN CONTRACTO CORPGeneral Contractor304/09/2026
FRANCIS RICHARDSElectrical303/21/2026
INDEPENDENT TEMPERATUREGeneral Contractor307/08/2026
HIMA GROUP INCGeneral Contractor207/08/2026
SANKAR, DAVIDElectrical103/21/2026
HENRY KHODOSHElectrical103/21/2026
HAS, MEHMETElectrical103/21/2026
ISLAND FOUNDATIONS CORPGeneral Contractor107/08/2026
KING HOIST & SCAFFOLDINGGeneral Contractor107/08/2026
GIOVANNI DITURIElectrical103/21/2026
HEXAGON CONST & ELECL GRPElectrical103/22/2026
A & S ELECTRIC INC.Electrical103/22/2026
KATZEN, BARRYElectrical103/21/2026
NUNEZ ELECTRIC INC.Electrical103/22/2026
RUSSO, PElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TWIN PEAKS INC.3171104/29/2026
FUTURE TECH CONSULTANTS O5891202/05/2025
MUNICIPAL TESTING LABORAT230210/03/2022
JPC LOGISTICS DBA JPCL EN351106/10/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedV. C. VITANZA SONS INC07/28/2026
DOB NOWBoiler EquipmentPermit IssuedCHAMPION COMBUSTION CORP05/13/2026
DOB NOWMechanical SystemsPermit IssuedINDEPENDENT TEMPERATURE05/07/2026
DOB NOWSupport of ExcavationPermit IssuedISLAND FOUNDATIONS CORP05/07/2026
DOB NOWConstruction FencePermit IssuedINDEPENDENT TEMPERATURE05/05/2026
DOB NOWMechanical SystemsPermit IssuedINDEPENDENT TEMPERATURE04/01/2026
DOB NOWPlumbingPermit IssuedV. C. VITANZA SONS INC04/01/2026
DOB NOWPlumbingPermit IssuedV. C. VITANZA SONS INC03/31/2026
DOB NOWGeneral ConstructionPermit IssuedT.A. AHERN CONTRACTO CORP03/30/2026
DOB NOWPlumbingPermit IssuedV. C. VITANZA SONS INC03/02/2026
DOB NOWPlumbingPermit IssuedFORSYTHE P&H CORP02/25/2026
DOB NOWPlumbingPermit IssuedFORSYTHE P&H CORP02/25/2026
DOB NOWConstruction FencePermit IssuedT.A. AHERN CONTRACTO CORP02/20/2026
DOB NOWGeneral ConstructionPermit IssuedT.A. AHERN CONTRACTO CORP02/18/2026
DOB NOWConstruction FencePermit IssuedHIMA GROUP INC01/21/2026
DOB NOWConstruction FencePermit IssuedMARIC PLUMBING & HEATING06/16/2025
DOB NOWGeneral ConstructionPermit IssuedCM&E CON, INC05/30/2025
DOB NOWConstruction FencePermit IssuedMARIC PLUMBING & HEATING05/28/2025
DOB NOWConstruction FencePermit IssuedHIMA GROUP INC04/29/2025
DOB NOWPlumbingPermit IssuedFORSYTHE P&H CORP03/27/2025
DOB NOWPlumbingPermit IssuedFORSYTHE P&H CORP03/27/2025
DOB NOWGeneral ConstructionPermit IssuedCM&E CON, INC03/07/2025
DOB NOWConstruction FencePermit IssuedMARIC PLUMBING & HEATING03/07/2025
DOB NOWGeneral ConstructionPermit IssuedCM&E CON, INC10/30/2024
DOB NOWMechanical SystemsSigned-offMARIC PLUMBING & HEATING08/13/2024
DOB NOWConstruction FencePermit IssuedMARIC PLUMBING & HEATING08/13/2024
DOB NOWSupport of ExcavationSigned-offCM&E CON, INC05/24/2024
DOB NOWPlumbingPermit IssuedFORSYTHE P&H CORP04/26/2024
DOB NOWPlumbingPermit IssuedFORSYTHE P&H CORP04/26/2024
DOB NOWSupport of ExcavationSigned-offCM&E CON, INC03/05/2024
DOB NOWGeneral ConstructionPermit IssuedCM&E CON, INC10/24/2023
DOB NOWConstruction FencePermit IssuedCM&E CON, INC10/24/2023
DOB NOWSupport of ExcavationSigned-offCM&E CON, INC10/20/2023
DOB NOWConstruction FencePermit IssuedMARIC PLUMBING & HEATING10/05/2023
DOB NOWMechanical SystemsSigned-offMARIC PLUMBING & HEATING10/05/2023
DOB NOWGeneral ConstructionPermit IssuedCM&E CON, INC05/30/2023
DOB NOWPlumbingPermit IssuedFORSYTHE P&H CORP05/25/2023
DOB NOWPlumbingPermit IssuedFORSYTHE P&H CORP05/25/2023
DOB NOWSupport of ExcavationSigned-offCM&E CON, INC05/18/2023
DOB NOWConstruction FencePermit IssuedCM&E CON, INC04/14/2023
+ 56 more permits on file
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
06/02/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/02/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/02/2026Certified Sprinkler - SP - RoughingCertifiedView ↗
09/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/19/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/18/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 81
DateRequirementInspectorRole
09/04/2026Structural Steel - Welding—special
09/04/2026Structural Stability – Alterations of existing buildings—special
09/04/2026Structural Steel - Details—special
08/19/2026Subsurface Conditions – Fill Placement & In-Place Density—special
08/11/2026Concrete - Cast-In-Place—special
08/11/2026Deep Foundation Elements—special
08/11/2026Fire-Resistant Penetrations and Joints—special
08/10/2026Fire-Resistance Rated Construction—progress
08/10/2026Emergency and Standby Power Systems (Generator)—special
08/03/2026Fire-Resistant Penetrations and Joints—special
07/29/2026Final—progress
07/29/2026Footing and Foundation—progress
07/29/2026Mechanical Systems—special
07/29/2026Final—progress
05/04/2026Energy Code Compliance InspectionsMAXIM KORNGOLDprogress
05/04/2026HVAC-R and service water piping design and insulationMAXIM KORNGOLDenergy_progress
04/29/2026Excavations - Sheeting, Shoring, and BracingMAXIM KORNGOLDspecial
04/27/2026Excavations - Sheeting, Shoring, and BracingMAXIM KORNGOLDspecial
04/15/2026Chimneys and ventsMAXIM KORNGOLDspecial
04/15/2026Post-installed AnchorsMAXIM KORNGOLDspecial
04/10/2026Fire-Resistant Penetrations and Joints—special
04/10/2026Post-installed Anchors—special
03/30/2026FinalMAXIM KORNGOLDprogress
03/30/2026Mechanical SystemsMAXIM KORNGOLDspecial
03/17/2026Post-installed Anchors—special
Latest 25 of 81.
▾Documents — 347 on file (BIS + DOB NOW)
▸Plans & Drawings44
▸DOB NOWPlans/Sketch44
09/03/2026B00058347-I1Request digital key ↗
09/01/2026B00530342-I1Request digital key ↗
09/01/2026B00530342-S1Request digital key ↗
Showing 3 of 44 on file for this type
▸Applications & Permits9
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION4
07/12/2019321472571Open ↗
04/03/2018321472571Open ↗
11/17/2017321472571Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION3
10/18/2018321472571Open ↗
04/13/2018321472571Open ↗
04/13/2018321472571Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
10/31/2016321472571Open ↗
10/31/2016321472571Open ↗
▸Seals & Professional Certifications86
▸DOB NOWDPL-1: Design Professional Seal & Signature44
09/03/2026B00058347-I1Open ↗
09/01/2026B00530342-S1Open ↗
09/01/2026B00530342-I1Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature26
09/23/2026B08011267-S1Open ↗
08/31/2026B00705093-P1Open ↗
08/31/2026B01380406-I1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
08/31/2026B01380406-I1Open ↗
08/31/2026B01380406-I1Open ↗
08/31/2026B01380406-I1Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
09/30/2019321472571Open ↗
09/30/2019321472571Open ↗
10/31/2016321472571Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
10/31/2016321472571Open ↗
▸Safety & Tenant Protection8
▸DOB NOWNYCSCA - Approved Site Safety Plans7
08/17/2026B01338448-P1Open ↗
08/13/2026B01380406-S2Open ↗
08/13/2026B08011267-I1Open ↗
Showing 3 of 7 on file for this type
▸BISSTREET TREE CHECKLIST1
12/22/2016321472571Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/01/2026B00530342-S1Open ↗
09/01/2026B00530342-I1Open ↗
08/28/2026B08011267-S2Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
10/31/2016321472571Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/30/2019321472571Open ↗
▸Approvals, Objections & Sign-offs122
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)46
08/17/2026B01380406-S1Open ↗
08/17/2026B01338448-P1Open ↗
08/17/2026B01365266-P1Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter42
09/01/2026B00530342-S1Open ↗
09/01/2026B00530342-I1Open ↗
08/17/2026B01338448-P1Open ↗
Showing 3 of 42 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)20
08/16/2026B01438293-S2Open ↗
08/16/2026B01438293-S3Open ↗
08/16/2026B01438293-S1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDEP Variance (V5) letter12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
01/16/2020321472571Open ↗
10/15/2019321472571Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
09/30/2019321472571Open ↗
12/22/2016321472571Open ↗
▸Filing & Intake Forms9
▸BISADDITIONAL INFORMATION5
09/30/2019321472571Open ↗
07/17/2019321472571Open ↗
09/17/2018321472571Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM2
01/16/2020321472571Open ↗
10/15/2019321472571Open ↗
▸BISEFILING COVER SHEET2
10/31/2016321472571Open ↗
10/31/2016321472571Open ↗
▸Other Documents59
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal46
08/17/2026B01380406-I1Open ↗
08/17/2026B01338448-P1Open ↗
08/17/2026B01365266-P1Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWProof of Historic Building6
08/13/2026B00705093-P6Open ↗
08/13/2026B00705093-I1Open ↗
08/13/2026B00705093-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
10/31/2016321472571Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026B00705093-S3Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B08003709-I1Open ↗