The Dyker Condominium
8303 13 AVENUE · Dyker Heights · BIN 3430056
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Roof71p · 5 filings · 20 docs
Floor 92p · 1 filing · 2 docs
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 365p · 5 filings · 20 docs
Floor 268p · 5 filings · 20 docs
Floor 168p · 6 filings · 20 docs
Cellar43p · 3 filings · 20 docs
Sub-Basement21p · 2 filings · 20 docs
Site & exterior35p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WNS DEVELOPMENT5007/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/19/2022$2.5M—Private party → DYKER DEVELOPMENT LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SIMINO ARCHITECT310/01/2024
LEVIN ENGINEERING PLLC709/16/2024
C&P DESIGN CONSULTANTS108/01/2023
WEXLER ASSOCIATES307/14/2023
ARYEH SIEGEL ARCHITECT111/08/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LEVIN ENGINEERING PLLC1403/21/2026
A2ZCM603/21/2026
D S CREATIVE INOVATIONS203/21/2026
SIMINO ARCHITECT203/21/2026
AVALON DESIGNS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAPOL CONSTRUCTION LLCGeneral Contractor1507/08/2026
ROM PIPING & HTG INCPlumbing207/08/2026
ROM PIPING & HEATING INCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN85241310/01/2024
Building Lifecycle
All (159)Filed (15)Permit Issued (12)Signed Off (8)Inspection (14)Objection (80)Special Inspection (30)
02/25/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/29/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/27/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/27/2024
Signed off — Alteration
INSTALLATION OF SPRINKLER SYSTEM FOR ENTIRE BUILDING IN CONJUNCTION WITH APPLICATION # B00807217. NO CHANGE IN USE, EGRESS OR OCCUPACNY.
B00886930-I1
11/15/2024
Signed off — Alteration
proposed curb cut
B00911483-I1
11/14/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
10/25/2024
Signed off — Alteration
HEREWITH FILING PLUMBING APPLICATION FOR ENTIRE BUILDING IN CONJUNCTION WITH NEW BUILDING APPLICATION # B00807217. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00883489-I1
10/21/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/09/2024
Signed off — Alteration
HEREWITH FILE MECHANICAL SYSTEM FOR ENTIRE BUILDING IN CONJUNCTION WITH NEW BUILDING APPLICATION # B00807217. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00883515-I1
10/07/2024
Special inspection requirement — Maintenance information
Shahrish Shuvo
10/07/2024
Special inspection requirement — Insulation placement and R values
Shahrish Shuvo
10/07/2024
Special inspection requirement — Protection of exposed foundation insulation
Shahrish Shuvo
10/07/2024
Special inspection requirement — Metering
Shahrish Shuvo
10/07/2024
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
10/07/2024
Special inspection requirement — Fenestration air leakage
Shahrish Shuvo
10/07/2024
Special inspection requirement — Air barrier — testing
Shahrish Shuvo
10/07/2024
Special inspection requirement — Fenestration areas
Shahrish Shuvo
10/07/2024
Special inspection requirement — Exterior lighting power
Shahrish Shuvo
10/07/2024
Special inspection requirement — Lighting controls
Shahrish Shuvo
10/07/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Shahrish Shuvo
10/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
10/07/2024
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
10/07/2024
Special inspection requirement — Combustible Exterior Wall Coverings
Shahrish Shuvo
10/07/2024
Special inspection requirement — Interior lighting power
Shahrish Shuvo
10/07/2024
Special inspection requirement — Electric vehicle service equipment requirements
Shahrish Shuvo
10/07/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Shahrish Shuvo
10/07/2024
Special inspection requirement — Permanent certificate
Shahrish Shuvo
10/07/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Shahrish Shuvo
10/07/2024
Special inspection requirement — Air barrier - visual inspection
Shahrish Shuvo
10/01/2024
Filed — New Building
PROPOSED 3-STORY AND CELLAR NEW MIXED USE BUILDING.
B00807217-P2
09/30/2024
Special inspection requirement — Electric vehicle service equipment requirements
Shahrish Shuvo
09/30/2024
Special inspection requirement — Air barrier — testing
Shahrish Shuvo
09/30/2024
Special inspection requirement — Metering
Shahrish Shuvo
09/30/2024
Special inspection requirement — Fenestration areas
Shahrish Shuvo
09/30/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Shahrish Shuvo
09/30/2024
Special inspection requirement — Insulation placement and R values
Shahrish Shuvo
09/30/2024
Special inspection requirement — Fenestration air leakage
Shahrish Shuvo
09/30/2024
Special inspection requirement — Exterior lighting power
Shahrish Shuvo
09/30/2024
Special inspection requirement — Lighting controls
Shahrish Shuvo
09/30/2024
Special inspection requirement — Air barrier - visual inspection
Shahrish Shuvo
09/24/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
09/24/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
09/23/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/20/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/16/2024
Filed — Alteration
INSTALLATION OF SPRINKLER SYSTEM FOR ENTIRE BUILDING IN CONJUNCTION WITH APPLICATION # B00807217. NO CHANGE IN USE, EGRESS OR OCCUPACNY.
B00886930-P2
09/13/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/05/2024
Signed off — Alteration
SUPPORT OF EXCAVATION INCLUDING OPEN CUT EXCAVATION FOR CONSTRUCTION OF NEW FOUNDATIONS SUPPOTING NEW RESIDENTIAL BUILDING
B00902175-S1
09/05/2024
Signed off — Alteration
SUPPORT OF EXCAVATION INCLUDING OPEN CUT EXCAVATION FOR CONSTRUCTION OF NEW FOUNDATIONS SUPPOTING NEW RESIDENTIAL BUILDING
B00902175-S2
08/08/2024
Signed off — Alteration
B08035806-I1
08/05/2024
Permit issued — General Construction
B00807217-I1-GC
07/31/2024
Permit issued — Sprinklers
B00886930-I1-PL
07/29/2024
Signed off — Alteration
SUPPORT OF EXCAVATION INCLUDING OPEN CUT EXCAVATION FOR CONSTRUCTION OF NEW FOUNDATIONS SUPPOTING NEW RESIDENTIAL BUILDING
B00902175-I1
04/29/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
04/26/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
04/19/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
04/16/2024
Objection resolved — Addressed
04/08/2024
Objection resolved — Addressed
04/01/2024
Objection resolved — Addressed
03/28/2024
Objection resolved — Addressed
03/28/2024
Objection resolved — Addressed
Latest 60 of 159 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedLEON D. DEMATTEIS CONSTR08/05/2024
DOB NOWSprinklersSigned-offROM PIPING & HTG INC07/31/2024
DOB NOWCurb CutSigned-offLEON D. DEMATTEIS CONSTR02/14/2024
DOB NOWMechanical SystemsSigned-offLEON D. DEMATTEIS CONSTR02/14/2024
DOB NOWConstruction FenceSigned-offLEON D. DEMATTEIS CONSTR12/07/2023
DOB NOWPlumbingSigned-offROM PIPING & HEATING INC09/18/2023
DOB NOWPlumbingSigned-offROM PIPING & HTG INC09/18/2023
DOB NOWFoundationSigned-offLEON D. DEMATTEIS CONSTR08/29/2023
DOB NOWGeneral ConstructionPermit IssuedLEON D. DEMATTEIS CONSTR08/29/2023
DOB NOWStructuralSigned-offLEON D. DEMATTEIS CONSTR08/29/2023
DOB NOWSupport of ExcavationSigned-offLEON D. DEMATTEIS CONSTR08/28/2023
DOB NOWConstruction FenceSigned-offLEON D. DEMATTEIS CONSTR12/13/2022
2 projects · most recent 12/07/2024
General Wiring
FiledStatusContractorScope
12/07/2024CompleteEMPIRE STATE ELECTL CORPGeneral Wiring
12/05/2022CompleteEMPIRE STATE ELECTL CORP1 meters
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
02/25/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/29/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/27/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/14/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
10/21/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/24/2024Fail-Final CND-Occupancy InspectionFailView ↗
09/24/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
09/23/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/20/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/13/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/29/2024Pass-Final PL - UndergroundPassView ↗
04/26/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/19/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/14/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 91
DateRequirementInspectorRole
10/07/2024Exterior lighting powerShahrish Shuvoenergy_progress
10/07/2024Air barrier - visual inspectionShahrish Shuvoenergy_progress
10/07/2024Protection of exposed foundation insulationShahrish Shuvoenergy_progress
10/07/2024Fenestration areasShahrish Shuvoenergy_progress
10/07/2024Permanent certificateShahrish Shuvoenergy_progress
10/07/2024Air barrier — testing Shahrish Shuvoenergy_progress
10/07/2024Combustible Exterior Wall CoveringsShahrish Shuvospecial
10/07/2024Fire-Resistant Penetrations and JointsShahrish Shuvospecial
10/07/2024Subsurface Investigations (Borings/Test Pits)Shahrish Shuvospecial
10/07/2024Energy Code Compliance InspectionsShahrish Shuvoprogress
10/07/2024Fire-Resistance Rated ConstructionShahrish Shuvoprogress
10/07/2024Interior lighting powerShahrish Shuvoenergy_progress
10/07/2024Fenestration air leakageShahrish Shuvoenergy_progress
10/07/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationShahrish Shuvospecial
10/07/2024Insulation placement and R valuesShahrish Shuvoenergy_progress
10/07/2024Maintenance informationShahrish Shuvoenergy_progress
10/07/2024MeteringShahrish Shuvoenergy_progress
10/07/2024Lighting controlsShahrish Shuvoenergy_progress
10/07/2024Electric vehicle service equipment requirementsShahrish Shuvoenergy_progress
10/07/2024Fenestration and door U-factor and product ratingsShahrish Shuvoenergy_progress
09/30/2024Insulation placement and R valuesShahrish Shuvoenergy_progress
09/30/2024Combustible Exterior Wall CoveringsShahrish Shuvospecial
09/30/2024Fire-Resistant Penetrations and JointsShahrish Shuvospecial
09/30/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationShahrish Shuvospecial
09/30/2024Subsurface Investigations (Borings/Test Pits)Shahrish Shuvospecial
Latest 25 of 91.
▾Documents — 98 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/28/2026B08035806-I1Request digital key ↗
08/27/2026B00883489-I1Request digital key ↗
08/27/2026B00883515-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
07/24/2024340887543Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
07/23/2024340887543Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B00807217-I1Open ↗
08/13/2026B00807217-P1Open ↗
08/13/2026B00807217-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026B00807217-P1Open ↗
08/13/2026B00807217-P2Open ↗
08/13/2026B00807217-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00807217-I1Open ↗
▸Seals & Professional Certifications45
▸DOB NOWSpecial Inspector Seal & Signature16
09/02/2026B00807217-P2Open ↗
09/02/2026B00807217-P2Open ↗
09/01/2026B00886930-P2Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/28/2026B08035806-I1Open ↗
08/27/2026B00883515-I1Open ↗
08/27/2026B00886930-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/02/2026B00807217-P2Open ↗
09/02/2026B00807217-P2Open ↗
09/02/2026B00807217-P2Open ↗
Showing 3 of 14 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026B00807217-P1Open ↗
08/13/2026B00807217-I1Open ↗
08/13/2026B00807217-P2Open ↗
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist3
08/24/2026B00807217-P2Open ↗
08/24/2026B00807217-I1Open ↗
08/14/2026B00807217-P1Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT1
07/24/2024340887543Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00807217-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00807217-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00807217-I1Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00883515-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT4
08/13/2026B00807217-I1Open ↗
08/13/2026B00807217-P1Open ↗
08/13/2026B00902175-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026B00902175-S1Open ↗
08/13/2026B00807217-I1Open ↗
▸Other Documents13
▸DOB NOWSite Survey: Initial3
08/13/2026B00807217-I1Open ↗
08/13/2026B00807217-P1Open ↗
08/13/2026B00807217-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026B00807217-I1Open ↗
08/13/2026B00807217-P1Open ↗
08/13/2026B00807217-P2Open ↗
▸DOB NOWProperty Ownership Certification3
08/24/2026B00807217-P2Open ↗
08/24/2026B00807217-I1Open ↗
08/14/2026B00807217-P1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION2
07/24/2024340887543Open ↗
07/24/2024340887543Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00807217-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00902175-I1Open ↗