← Back
BuildNYC
BROOKLYN
The Dyker Condominium
8303 13TH AVENUE · Dyker Heights · BIN 3430056
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Active ViolationsFDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofWns Development L.L.C.66p · 5 filings · 20 docs
Floor 9Center for Anxiety2p · 1 filing · 2 docs
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3Wns Development L.L.C.60p · 5 filings · 20 docs
Floor 2Wns Development L.L.C.63p · 5 filings · 20 docs
Floor 1Wns Development L.L.C.63p · 6 filings · 20 docs
CellarWns Development L.L.C.43p · 4 filings · 20 docs
BasementWns Development L.L.C.2p · 2 filings · 20 docs
Sub-BasementWns Development L.L.C.17p · 2 filings · 20 docs
Site & exteriorCenter for Anxiety33p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WNS Development5007/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/19/2022$2.5M—Private party → DYKER DEVELOPMENT LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Simino Architect310/01/2024
Levin Engineering709/16/2024
C&P Design Consultants108/01/2023
Wexler Associates307/14/2023
Aryeh Siegel Architect111/08/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Levin Engineering1403/21/2026
A2ZCM603/21/2026
D S Creative Inovations203/21/2026
Simino Architect203/21/2026
Avalon Designs203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sapol ConstructionGeneral Contractor1107/08/2026
Sapol ConstructionScaffold403/21/2026
Rom Piping & HeatingPlumbing207/08/2026
Rom Piping & HeatingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Shahrish Shuvo Engineering85241310/01/2024
Building Lifecycle
All (156)Filed (15)Permit Issued (12)Signed Off (8)Inspection (11)Objection (80)Special Inspection (30)
12/27/2024
Signed off — Alteration
INSTALLATION OF SPRINKLER SYSTEM FOR ENTIRE BUILDING IN CONJUNCTION WITH APPLICATION # B00807217. NO CHANGE IN USE, EGRESS OR OCCUPACNY.
B00886930-I1
11/15/2024
Signed off — Alteration
proposed curb cut
B00911483-I1
11/14/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
10/25/2024
Signed off — Alteration
HEREWITH FILING PLUMBING APPLICATION FOR ENTIRE BUILDING IN CONJUNCTION WITH NEW BUILDING APPLICATION # B00807217. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00883489-I1
10/21/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/09/2024
Signed off — Alteration
HEREWITH FILE MECHANICAL SYSTEM FOR ENTIRE BUILDING IN CONJUNCTION WITH NEW BUILDING APPLICATION # B00807217. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00883515-I1
10/07/2024
Special inspection requirement — Lighting controls
Shahrish Shuvo
10/07/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Shahrish Shuvo
10/07/2024
Special inspection requirement — Protection of exposed foundation insulation
Shahrish Shuvo
10/07/2024
Special inspection requirement — Fenestration air leakage
Shahrish Shuvo
10/07/2024
Special inspection requirement — Maintenance information
Shahrish Shuvo
10/07/2024
Special inspection requirement — Exterior lighting power
Shahrish Shuvo
10/07/2024
Special inspection requirement — Air barrier — testing
Shahrish Shuvo
10/07/2024
Special inspection requirement — Fenestration areas
Shahrish Shuvo
10/07/2024
Special inspection requirement — Air barrier - visual inspection
Shahrish Shuvo
10/07/2024
Special inspection requirement — Insulation placement and R values
Shahrish Shuvo
10/07/2024
Special inspection requirement — Metering
Shahrish Shuvo
10/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
10/07/2024
Special inspection requirement — Combustible Exterior Wall Coverings
Shahrish Shuvo
10/07/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Shahrish Shuvo
10/07/2024
Special inspection requirement — Interior lighting power
Shahrish Shuvo
10/07/2024
Special inspection requirement — Electric vehicle service equipment requirements
Shahrish Shuvo
10/07/2024
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
10/07/2024
Special inspection requirement — Permanent certificate
Shahrish Shuvo
10/07/2024
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
10/07/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Shahrish Shuvo
10/01/2024
Filed — New Building
PROPOSED 3-STORY AND CELLAR NEW MIXED USE BUILDING.
B00807217-P2
09/30/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Shahrish Shuvo
09/30/2024
Special inspection requirement — Interior lighting power
Shahrish Shuvo
09/30/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Shahrish Shuvo
09/30/2024
Special inspection requirement — Protection of exposed foundation insulation
Shahrish Shuvo
09/30/2024
Special inspection requirement — Electric vehicle service equipment requirements
Shahrish Shuvo
09/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
09/30/2024
Special inspection requirement — Air barrier — testing
Shahrish Shuvo
09/30/2024
Special inspection requirement — Lighting controls
Shahrish Shuvo
09/30/2024
Special inspection requirement — Insulation placement and R values
Shahrish Shuvo
09/30/2024
Special inspection requirement — Metering
Shahrish Shuvo
09/24/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
09/24/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
09/23/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/20/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/16/2024
Filed — Alteration
INSTALLATION OF SPRINKLER SYSTEM FOR ENTIRE BUILDING IN CONJUNCTION WITH APPLICATION # B00807217. NO CHANGE IN USE, EGRESS OR OCCUPACNY.
B00886930-P2
09/13/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/05/2024
Signed off — Alteration
SUPPORT OF EXCAVATION INCLUDING OPEN CUT EXCAVATION FOR CONSTRUCTION OF NEW FOUNDATIONS SUPPOTING NEW RESIDENTIAL BUILDING
B00902175-S1
09/05/2024
Signed off — Alteration
SUPPORT OF EXCAVATION INCLUDING OPEN CUT EXCAVATION FOR CONSTRUCTION OF NEW FOUNDATIONS SUPPOTING NEW RESIDENTIAL BUILDING
B00902175-S2
08/08/2024
Signed off — Alteration
B08035806-I1
08/05/2024
Permit issued — General Construction
B00807217-I1-GC
07/31/2024
Permit issued — Sprinklers
B00886930-I1-PL
07/29/2024
Signed off — Alteration
SUPPORT OF EXCAVATION INCLUDING OPEN CUT EXCAVATION FOR CONSTRUCTION OF NEW FOUNDATIONS SUPPOTING NEW RESIDENTIAL BUILDING
B00902175-I1
04/29/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
04/26/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
04/19/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
04/16/2024
Objection resolved — Addressed
04/08/2024
Objection resolved — Addressed
04/01/2024
Objection resolved — Addressed
03/28/2024
Objection resolved — Addressed
03/28/2024
Objection resolved — Addressed
03/28/2024
Objection resolved — Addressed
03/26/2024
Objection resolved — Addressed
03/22/2024
Objection raised — Scope
Latest 60 of 156 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedLeon D. Dematteis Construction08/05/2024
DOB NOWPlumbingSigned-offRom Piping & Heating07/31/2024
DOB NOWMechanical SystemsSigned-offLeon D. Dematteis Construction02/14/2024
DOB NOWCurb CutSigned-offLeon D. Dematteis Construction02/14/2024
DOB NOWConstruction FenceSigned-offLeon D. Dematteis Construction12/07/2023
DOB NOWSprinklersSigned-offRom Piping & Heating09/18/2023
DOB NOWPlumbingSigned-offRom Piping & Heating09/18/2023
DOB NOWStructuralSigned-offLeon D. Dematteis Construction08/29/2023
DOB NOWFoundationSigned-offLeon D. Dematteis Construction08/29/2023
DOB NOWGeneral ConstructionPermit IssuedLeon D. Dematteis Construction08/29/2023
DOB NOWSupport of ExcavationSigned-offLeon D. Dematteis Construction08/28/2023
DOB NOWConstruction FenceSigned-offLeon D. Dematteis Construction12/13/2022
2 projects · most recent 12/07/2024
General Wiring
FiledStatusContractorScope
12/07/2024CompleteEmpire State ElectlGeneral Wiring
12/05/2022CompleteEmpire State Electl1 meters
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
11/14/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
10/21/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/24/2024Fail-Final CND-Occupancy InspectionFailView ↗
09/24/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
09/23/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/20/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/13/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/29/2024Pass-Final PL - UndergroundPassView ↗
04/26/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/19/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/14/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 91
DateRequirementInspectorRole
10/07/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationShahrish Shuvospecial
10/07/2024Energy Code Compliance InspectionsShahrish Shuvoprogress
10/07/2024Fire-Resistance Rated ConstructionShahrish Shuvoprogress
10/07/2024Interior lighting powerShahrish Shuvoenergy_progress
10/07/2024Fenestration air leakageShahrish Shuvoenergy_progress
10/07/2024Insulation placement and R valuesShahrish Shuvoenergy_progress
10/07/2024Exterior lighting powerShahrish Shuvoenergy_progress
10/07/2024Air barrier - visual inspectionShahrish Shuvoenergy_progress
10/07/2024Maintenance informationShahrish Shuvoenergy_progress
10/07/2024MeteringShahrish Shuvoenergy_progress
10/07/2024Lighting controlsShahrish Shuvoenergy_progress
10/07/2024Protection of exposed foundation insulationShahrish Shuvoenergy_progress
10/07/2024Fenestration areasShahrish Shuvoenergy_progress
10/07/2024Permanent certificateShahrish Shuvoenergy_progress
10/07/2024Air barrier — testing Shahrish Shuvoenergy_progress
10/07/2024Electric vehicle service equipment requirementsShahrish Shuvoenergy_progress
10/07/2024Fenestration and door U-factor and product ratingsShahrish Shuvoenergy_progress
10/07/2024Subsurface Investigations (Borings/Test Pits)Shahrish Shuvospecial
10/07/2024Fire-Resistant Penetrations and JointsShahrish Shuvospecial
10/07/2024Combustible Exterior Wall CoveringsShahrish Shuvospecial
09/30/2024Fenestration air leakageShahrish Shuvoenergy_progress
09/30/2024Fenestration and door U-factor and product ratingsShahrish Shuvoenergy_progress
09/30/2024Fenestration areasShahrish Shuvoenergy_progress
09/30/2024MeteringShahrish Shuvoenergy_progress
09/30/2024Air barrier — testing Shahrish Shuvoenergy_progress
Latest 25 of 91.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Center for AnxietyMedical / HealthcareFloor 9
Project B08035806 Alteration · LOC Issued · 11/08/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 98 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/28/2026B08035806-I1Request digital key ↗
08/27/2026B00883489-I1Request digital key ↗
08/27/2026B00883515-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
07/24/2024340887543Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
07/23/2024340887543Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B00807217-I1Open ↗
08/13/2026B00807217-P1Open ↗
08/13/2026B00807217-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026B00807217-P1Open ↗
08/13/2026B00807217-P2Open ↗
08/13/2026B00807217-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00807217-I1Open ↗
▸Seals & Professional Certifications45
▸DOB NOWSpecial Inspector Seal & Signature16
09/02/2026B00807217-P2Open ↗
09/02/2026B00807217-P2Open ↗
09/01/2026B00886930-P2Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/28/2026B08035806-I1Open ↗
08/27/2026B00883515-I1Open ↗
08/27/2026B00886930-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/02/2026B00807217-P2Open ↗
09/02/2026B00807217-P2Open ↗
09/02/2026B00807217-P2Open ↗
Showing 3 of 14 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026B00807217-P1Open ↗
08/13/2026B00807217-I1Open ↗
08/13/2026B00807217-P2Open ↗
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist3
08/24/2026B00807217-P2Open ↗
08/24/2026B00807217-I1Open ↗
08/14/2026B00807217-P1Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT1
07/24/2024340887543Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00807217-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00807217-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00807217-I1Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00883515-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT4
08/13/2026B00807217-I1Open ↗
08/13/2026B00807217-P1Open ↗
08/13/2026B00807217-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026B00902175-S1Open ↗
08/13/2026B00807217-I1Open ↗
▸Other Documents13
▸DOB NOWSite Survey: Initial3
08/13/2026B00807217-I1Open ↗
08/13/2026B00807217-P1Open ↗
08/13/2026B00807217-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026B00807217-I1Open ↗
08/13/2026B00807217-P1Open ↗
08/13/2026B00807217-P2Open ↗
▸DOB NOWProperty Ownership Certification3
08/24/2026B00807217-P2Open ↗
08/24/2026B00807217-I1Open ↗
08/14/2026B00807217-P1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION2
07/24/2024340887543Open ↗
07/24/2024340887543Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00807217-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00902175-I1Open ↗