← Back
Three families
831 BUSHWICK AVENUE
BROOKLYN · Bushwick (East) · BIN 3074034
💬 Discuss this project
1920Year Built
3Stories
C0Building Class
R6Zoning
3,600 sfGross Floor Area
3Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Three families · Owner of record: LUCKY SKY REALTY LLC · 1,360 sf lot · 2.65 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LUCKY SKY REALTY1407/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/27/2021$1.2M—Private party → LUCKY SKY REALTY LLC$331/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AMERILAND BROOK LLC501/20/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WATSON'S PLBG, HTG, & BDGPlumbing607/08/2026
SPLEN CONSTRUCTION INCGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMERILAND BROOK LLC1506501/20/2022
Building Lifecycle
All (48)Filed (5)Permit Issued (2)Signed Off (2)Violation (21)Inspection (7)Special Inspection (11)
05/04/2026
Violation issued (HPD, closed)
A
11/19/2025
Violation issued (HPD, closed)
I
06/09/2025
Violation issued (HPD, closed)
A
11/27/2024
Violation issued (HPD, closed)
I
04/09/2024
Violation issued (HPD, closed)
A
11/21/2023
Violation issued (HPD, closed)
I
03/21/2023
Violation issued (HPD, closed)
A
11/10/2022
Violation issued (HPD, closed)
I
02/23/2022
Violation issued (HPD, closed)
I
02/23/2022
Violation issued (HPD, closed)
A
02/18/2022
Signed off — Alteration
B00555419-I1
02/18/2022
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING 3 STORY BUILDING W/ BASEMENT AND CELLAR. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B00555412-I1
02/04/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/28/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/21/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
01/21/2022
Special inspection requirement — Interior lighting power
XIAOHONG ZHAO
01/21/2022
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
01/20/2022
Filed — Alteration
INTERIOR RENOVATION OF EXISTING 3 STORY BUILDING W/ BASEMENT AND CELLAR. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B00555412-P2
01/16/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/14/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/08/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/08/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/08/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/01/2021
Special inspection requirement — HVAC-R and service water heating system controls
XIAOHONG ZHAO
11/01/2021
Special inspection requirement — HVAC-R and service water heating equipment
XIAOHONG ZHAO
11/01/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOHONG ZHAO
11/01/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
11/01/2021
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
10/26/2021
Filed — Alteration
B00555419-P1
07/15/2021
Permit issued — General Construction
B00555412-I1-GC
07/14/2021
Permit issued — Plumbing
B00555419-I1-PL
07/13/2021
Filed — Alteration
INTERIOR RENOVATION OF EXISTING 3 STORY BUILDING W/ BASEMENT AND CELLAR. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B00555412-P1
07/13/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
07/13/2021
Special inspection requirement — Interior lighting power
XIAOHONG ZHAO
07/13/2021
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
07/10/2021
Filed — Alteration
B00555419-I1
07/10/2021
Filed — Alteration
INTERIOR RENOVATION OF EXISTING 3 STORY BUILDING W/ BASEMENT AND CELLAR. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B00555412-I1
04/07/2021
Violation issued (HPD, closed)
A
04/07/2021
Violation issued (HPD, closed)
I
05/06/2020
Violation issued (ECB, closed)
Unknown
05/06/2020
Violation issued (ECB, closed)
Construction
10/29/2019
Violation issued (HPD, closed)
I
10/16/2018
Violation issued (HPD, closed)
I
11/20/2017
Violation issued (HPD, closed)
I
11/04/2016
Violation issued (HPD, closed)
I
10/07/2015
Violation issued (HPD, closed)
I
10/26/1998
Violation issued (HPD, open)
B
01/20/1982
Violation issued (HPD, closed)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSPLEN CONSTRUCTION INC07/15/2021
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG07/14/2021
BISOTISSUEDTRINCHESE CONSTRUCTION IN03/23/2020
BISOTISSUEDTRINCHESE CONSTRUCTION IN02/26/2020
BISFBISSUEDBAERENKLAU CO INC.04/18/1996
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
02/04/2022Pass-Final General Construction Non-Directive 14PassView ↗
01/28/2022Fail-Final General Construction Non-Directive 14FailView ↗
01/16/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/14/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/08/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/08/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/08/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
01/21/2022Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
01/21/2022Interior lighting powerXIAOHONG ZHAOenergy_progress
01/21/2022Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
11/01/2021HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
11/01/2021HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
11/01/2021HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
11/01/2021Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
11/01/2021Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
07/13/2021Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
07/13/2021Interior lighting powerXIAOHONG ZHAOenergy_progress
07/13/2021Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/01/2026B00555419-I1Request digital key ↗
09/01/2026B00555419-P1Request digital key ↗
09/01/2026B00555412-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications14
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026B00555412-P1Open ↗
09/01/2026B00555412-P1Open ↗
08/26/2026B00555419-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/01/2026B00555419-I1Open ↗
09/01/2026B00555419-P1Open ↗
09/01/2026B00555412-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B00555412-P1Open ↗
08/26/2026B00555419-I1Open ↗
08/25/2026B00555412-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/01/2026B00555412-P1Open ↗
09/01/2026B00555412-I1Open ↗
09/01/2026B00555412-P2Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
09/01/2026B00555412-I1Open ↗
08/13/2026B00555419-I1Open ↗