← Back
Three families
8317 GLENWOOD ROAD
BROOKLYN · BIN 3223817
💬 Discuss this project
1960Year Built
3Stories
C0Building Class
R5BZoning
2,800 sfGross Floor Area
3Units
Three families · 2,047 sf lot · 1.37 FAR built · Flood zone X500
Locations of Work
Electrical
Roof1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR112/14/2023
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN8524112/14/2023
Building Lifecycle
All (13)Filed (1)Permit Issued (1)Objection (6)Special Inspection (5)
01/03/2024
Permit issued — Solar
B00975080-I1-SL
12/27/2023
Objection resolved — Addressed
12/27/2023
Objection resolved — Addressed
12/27/2023
Objection resolved — Addressed
12/26/2023
Objection raised — Other
12/20/2023
Objection raised — Other
12/20/2023
Objection raised — Other
12/14/2023
Filed — Alteration
Installation of solar panels, rooftop, grid tied, RAILED (5.2 KW)(13MODULES)
B00975080-I1
12/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
12/11/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
12/11/2023
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
12/11/2023
Special inspection requirement — Final
Mina Makar
12/11/2023
Special inspection requirement — Air barrier - visual inspection
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedMOMENTUM SOLAR01/03/2024
1 project · most recent 12/11/2023
FiledStatusContractorScope
12/11/2023CompleteISLAND ELECTRIC CORP—
1 project · most recent 12/14/2023
FiledStatusContractorScope
12/14/2023Permit IssuedMOMENTUM SOLAR13 panels, 5.2 kw, 229 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/11/2023Fire-Resistant Penetrations and JointsShahrish Shuvospecial
12/11/2023Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
12/11/2023Energy Code Compliance InspectionsMina Makarprogress
12/11/2023FinalMina Makarprogress
12/11/2023Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/26/2026B00975080-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026B00975080-I1Open ↗
08/24/2026B00975080-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026B00975080-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026B00975080-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B00975080-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B00975080-I1Open ↗