← Back
Two family brick
8318 10 AVENUE
BROOKLYN · BIN 3152624
💬 Discuss this project
1924Year Built
2Stories
B1Building Class
R4-1Zoning
2,096 sfGross Floor Area
2Units
13 Open Violations ▸FDNY Report ↗
Two family brick · Owner of record: 8318 MING JIE LLC · 2,500 sf lot · 0.84 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Roof1p · 1 filing · 9 docs
Floor 22p · 1 filing · 6 docs
Floor 12p · 2 filings · 18 docs
Cellar3p · 2 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KALE CONSTRUCTION103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/03/2025$1.2M—— → —$596/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TOM PETERSEN ARCHITECT, LLC105/05/2026
FARHAD BASSIRI-TEHRANI611/14/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KALE CONSTRUCTION INCGeneral Contractor104/09/2026
SOLAR CONTRACTING LLCGeneral Contractor107/08/2026
CATMAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS PETERSEN ARCHITECT7854105/05/2026
BASSIRI8394311/12/2025
Building Lifecycle
All (50)Filed (7)Permit Issued (3)Signed Off (3)Violation (17)Inspection (6)Special Inspection (14)
08/11/2026
Signed off — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS
B01397466-I1
05/19/2026
Permit issued — Solar
B01397466-I1-SL
05/05/2026
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS
B01397466-I1
05/05/2026
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
05/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
05/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
TOM PETERSEN
05/05/2026
Special inspection requirement — Air barrier - visual inspection
TOM PETERSEN
05/05/2026
Special inspection requirement — Final
TOM PETERSEN
12/29/2025
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW WASHER, DRYER, BOILERS AND HOT WATER HEATERS IN CELLAR; NEW YARD DRAIN AT REAR YARD. NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLI
B01224491-I1
12/12/2025
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR AT REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01224463-I1
12/11/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/03/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/14/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW WASHER, DRYER, BOILERS AND HOT WATER HEATERS IN CELLAR; NEW YARD DRAIN AT REAR YARD. NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLI
B01224491-P2
11/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
11/14/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
11/14/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
11/12/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR AT REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01224463-P2
11/12/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
11/12/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
11/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
11/10/2025
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
10/24/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/08/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW WASHER, DRYER, BOILERS AND HOT WATER HEATERS IN CELLAR; NEW YARD DRAIN AT REAR YARD. NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLI
B01224491-P1
08/08/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR AT REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01224463-P1
08/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
08/08/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
08/08/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
07/31/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/18/2025
Violation issued (ECB, closed)
Unknown
05/28/2025
Permit issued — Plumbing
B01224491-I1-PL
05/28/2025
Permit issued — General Construction
B01224463-I1-GC
05/23/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW WASHER, DRYER, BOILERS AND HOT WATER HEATERS IN CELLAR; NEW YARD DRAIN AT REAR YARD. NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLI
B01224491-I1
05/23/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR AT REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01224463-I1
08/15/2024
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
06/24/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/20/2006
Violation issued (ECB, closed)
Construction
11/18/2003
Violation issued (HPD, open)
B
07/01/2003
Violation issued (HPD, open)
B
07/01/2003
Violation issued (HPD, open)
B
07/01/2003
Violation issued (HPD, open)
B
07/01/2003
Violation issued (HPD, open)
B
07/01/2003
Violation issued (HPD, open)
B
07/01/2003
Violation issued (HPD, open)
B
07/01/2003
Violation issued (HPD, open)
B
07/01/2003
Violation issued (HPD, open)
B
07/01/2003
Violation issued (HPD, open)
B
07/01/2003
Violation issued (HPD, open)
B
06/20/2003
Violation issued (ECB, closed)
Construction
05/10/1994
Violation issued (ECB, closed)
Construction
12/15/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSOLAR CONTRACTING LLC05/19/2026
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC05/28/2025
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC05/28/2025
2 projects · most recent 05/04/2026
General Wiring
FiledStatusContractorScope
05/04/2026CompleteSOLAR ELEC CONTRACTNG LLC—
06/04/2025CompleteKJK ELECTRIC INCGeneral Wiring
1 project · most recent 05/05/2026
FiledStatusContractorScope
05/05/2026Signed-offSOLAR CONTRACTING LLC8 panels, 3.5 kw, 657.39 roof_area_sqft
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/11/2025Pass-Final General Construction Non-Directive 14PassView ↗
12/03/2025Fail-Final General Construction Non-Directive 14FailView ↗
11/10/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
10/24/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/31/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/15/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
05/05/2026Energy Code Compliance InspectionsTOM PETERSENprogress
05/05/2026Fire-Resistant Penetrations and JointsTOM PETERSENspecial
05/05/2026Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
05/05/2026Air barrier - visual inspectionTOM PETERSENenergy_progress
05/05/2026FinalTOM PETERSENprogress
11/14/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
11/14/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
11/14/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
11/12/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
11/12/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
11/12/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
08/08/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
08/08/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
08/08/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/21/2026B01224463-I1Request digital key ↗
08/21/2026B01224463-P1Request digital key ↗
08/21/2026B01224463-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/21/2026B01224463-I1Open ↗
08/21/2026B01224463-P1Open ↗
08/21/2026B01224463-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026B01224463-P2Open ↗
08/26/2026B01224463-I1Open ↗
08/23/2026B01397466-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026B01224463-P2Open ↗
08/26/2026B01224463-I1Open ↗
08/23/2026B01397466-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026B01397466-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/17/2026B01397466-I1Open ↗