← Back
Parsonage, rectory
Saint Anthony Catholic Church
832 EAST 166 STREET · Name © OpenStreetMap contributors · Longwood · BIN 2005029
💬 Discuss this project
1927Year Built
4Stories
M3Building Class
R6Zoning
4,340 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Parsonage, rectory · 1,697 sf lot · 2.56 FAR built · Flood zone X
Locations of Work
MechanicalPlumbingEquipmentGeneral
Cellar1p · 2 filings · 20 docs
Site & exterior4p · 2 filings · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROBERT GERMAIN JR. PE303/23/2021
BAILEYS ENGINEERING PC202/27/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPRING SCAFFOLDING LLCGeneral Contractor1107/08/2026
PIPE RITE CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ROBERT F. GERMAIN JR. PE5100303/23/2021
Building Lifecycle
All (29)Filed (5)Permit Issued (7)Signed Off (4)Violation (5)Special Inspection (8)
05/25/2022
Signed off — Alteration
REPLACEMENT (3) NEW LOW PRESSURE BOILERS. REPLACEMENT (3) NEW GAS FIRED BURNERS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
X00313762-I1
09/13/2021
Signed off — Alteration
REPLACEMENT (2) NEW GAS FIRED HOT WATER HEATERS WITH INTEGRAL BURNERS. NEW 2" GAS LINE TO HWH FROM EXISTING MAIN. RECONNECT EXISTING LOW PRESSURE GAS LINES. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
X00277873-I1
03/26/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
03/23/2021
Filed — Alteration
REPLACEMENT (2) NEW GAS FIRED HOT WATER HEATERS WITH INTEGRAL BURNERS. NEW 2" GAS LINE TO HWH FROM EXISTING MAIN. RECONNECT EXISTING LOW PRESSURE GAS LINES. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
X00277873-P1
03/18/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
06/17/2020
Permit issued — Boiler Equipment
X00313762-I1-BE
02/25/2020
Filed — Alteration
REPLACEMENT (3) NEW LOW PRESSURE BOILERS. REPLACEMENT (3) NEW GAS FIRED BURNERS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
X00313762-I1
02/14/2020
Permit issued — Plumbing
X00277873-I1-PL
02/12/2020
Special inspection requirement — HVAC and service water heating equipment
Robert Germain Jr.
02/12/2020
Special inspection requirement — Maintenance information
Robert Germain Jr.
02/12/2020
Special inspection requirement — HVAC and service water heating system controls
Robert Germain Jr.
02/11/2020
Filed — Alteration
REPLACEMENT (2) NEW GAS FIRED HOT WATER HEATERS WITH INTEGRAL BURNERS. NEW 2" GAS LINE TO HWH FROM EXISTING MAIN. RECONNECT EXISTING LOW PRESSURE GAS LINES. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
X00277873-I1
02/11/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
01/22/2019
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00019910-I1
12/27/2018
Permit issued — Sidewalk Shed
X00019910-I1-SH
07/30/2018
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00019915-I1
03/05/2018
Permit issued — Sidewalk Shed
X00019910-I1-SH
03/05/2018
Permit issued — Supported Scaffold
X00019915-I1-SF
02/28/2018
Permit issued — Supported Scaffold
X00019915-I1-SF
02/27/2018
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00019915-I1
02/21/2018
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00019910-I1
02/21/2018
Permit issued — Sidewalk Shed
X00019910-I1-SH
02/15/2018
Special inspection requirement — Final
PAUL BAILEY
02/15/2018
Special inspection requirement — Final
PAUL BAILEY
09/21/2011
Violation issued (ECB, closed)
Unknown
06/09/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/23/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/23/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/23/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedPIPE RITE CORP06/17/2020
DOB NOWPlumbingSigned-offPIPE RITE CORP02/14/2020
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC12/27/2018
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC03/05/2018
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC03/05/2018
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC02/28/2018
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC02/21/2018
BISOTISSUEDBIG CITY BOILER LLC11/08/2019
1 project · most recent 02/14/2018
FiledStatusContractorScope
02/14/2018CompleteTOP SHELF ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
03/26/2021Fire-Resistant Penetrations and JointsRobert Germain Jr.special
03/18/2021Fire-Resistant Penetrations and JointsRobert Germain Jr.special
02/12/2020HVAC and service water heating equipment Robert Germain Jr.energy_progress
02/12/2020Maintenance informationRobert Germain Jr.energy_progress
02/12/2020HVAC and service water heating system controls Robert Germain Jr.energy_progress
02/11/2020Fire-Resistant Penetrations and JointsRobert Germain Jr.special
02/15/2018FinalPAUL BAILEYprogress
02/15/2018FinalPAUL BAILEYprogress
▾Documents — 44 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch - Plumbing2
08/25/2026X00277873-I1Request digital key ↗
08/15/2026X00277873-P1Request digital key ↗
▸DOB NOWPlans/Sketch2
08/26/2026X00019910-I1Request digital key ↗
08/26/2026X00019915-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
08/26/2026X00313762-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
10/28/2019220718481Open ↗
▸BISWORK PERMIT APPLICATION1
11/08/2019220718481Open ↗
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature5
09/26/2026X00019910-I1Open ↗
09/23/2026X00313762-I1Open ↗
09/23/2026X00313762-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/26/2026X00019910-I1Open ↗
08/26/2026X00019915-I1Open ↗
08/13/2026X00313762-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026X00313762-I1Open ↗
08/30/2026X00277873-I1Open ↗
08/26/2026X00277873-P1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/28/2019220718481Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/28/2019220718481Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
10/28/2019220718481Open ↗
▸Safety & Tenant Protection3
▸DOB NOWTenant Protection Plan3
08/13/2026X00277873-P1Open ↗
08/13/2026X00313762-I1Open ↗
08/13/2026X00277873-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026X00019915-I1Open ↗
08/13/2026X00313762-I1Open ↗
08/13/2026X00277873-P1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/28/2019220718481Open ↗
▸Energy Compliance4
▸BISAS-BUILT ENERGY ANALYSIS1
09/14/2021220718481Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/14/2021220718481Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
10/28/2019220718481Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00313762-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/14/2021220718481Open ↗
▸Approvals, Objections & Sign-offs5
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/13/2026X00313762-I1Open ↗
08/13/2026X00277873-P1Open ↗
08/13/2026X00277873-I1Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/14/2021220718481Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/14/2021220718481Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
09/14/2021220718481Open ↗
10/28/2019220718481Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
10/28/2019220718481Open ↗