← Back
BuildNYC
Public elementary, junior or senior high
Boys' High School
832 MARCY AVENUE · BIN 3051641
💬 Discuss this project
1892Year Built
4Stories
W1Building Class
R6BZoning
120,000 sfGross Floor Area
1Units
LL97 Covered12 Active Violations 0 unresolved · 12 paperwork only 6 likely answered 7 old, status unconfirmed ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 75,000 sf lot · 1.6 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofH.S. 4586p · 1 filing · 17 docs
CellarH.S. 4586p · 1 filing · 17 docs
BasementH.S. 4582p · 1 filing · 17 docs
Sub-BasementH.S. 458, Brooklyn Academy High School6p · 2 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority8209/13/2026
NYC Department of Education2003/22/2026
Division of School Facilities103/21/2026
New York City Public School103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GG Engineering103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A & S ElectricElectrical803/21/2026
Atarch GroupGeneral Contractor307/08/2026
R.M.F. ElectricElectrical103/21/2026
G & F.a.st ElectricElectrical103/21/2026
Vial Electric & CompanyElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Twin Peaks317307/17/2026
JPC Logistics Dba JPCL EN351111/07/2025
Building Lifecycle
All (93)Filed (4)Permit Issued (3)Violation (60)Objection (12)Special Inspection (14)
08/03/2026
Objection resolved — Addressed
08/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAXIM KORNGOLD
08/03/2026
Special inspection requirement — Mechanical Systems
MAXIM KORNGOLD
08/03/2026
Special inspection requirement — Post-installed Anchors
MAXIM KORNGOLD
08/03/2026
Special inspection requirement — Final
MAXIM KORNGOLD
07/23/2026
Objection raised — Other
07/17/2026
Filed — Alteration
Remove and replace existing Walk-in refrigerator and freezer and associated equipment.
B01009661-P1
07/16/2026
Special inspection requirement — Final
MAXIM KORNGOLD
07/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAXIM KORNGOLD
07/16/2026
Special inspection requirement — Mechanical Systems
MAXIM KORNGOLD
07/16/2026
Special inspection requirement — Post-installed Anchors
MAXIM KORNGOLD
05/19/2026
Objection resolved — Addressed
05/19/2026
Objection resolved — Addressed
05/18/2026
Violation issued (ECB, open)
Construction
05/18/2026
Violation issued (ECB, open)
Construction
05/18/2026
Violation issued (ECB, open)
Construction
05/06/2026
Objection resolved — Addressed
05/06/2026
Objection resolved — Addressed
04/06/2026
Violation issued (ECB, open)
Elevators
01/21/2026
Violation issued (FDNY_NOV, closed)
01/21/2026
Violation issued (FDNY_NOV, closed)
01/12/2026
Permit issued — Mechanical Systems
B01009661-I1-MS
12/24/2025
Violation issued (ECB, open)
Elevators
12/24/2025
Violation issued (ECB, open)
Elevators
12/17/2025
Violation issued (FDNY_NOV, closed)
12/17/2025
Violation issued (FDNY_NOV, closed)
11/20/2025
Objection raised — Scope
11/20/2025
Objection raised — Scope
11/20/2025
Objection raised — Cost
11/20/2025
Objection raised — Zoning
11/07/2025
Filed — Alteration
INSTALLATION OF NEW SUPPLEMENTAL COOLING SUPPLEMENTAL AC SYSTEM IN BASEMENT KITCHEN.
B01297119-I1
10/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
10/30/2025
Special inspection requirement — Post-installed Anchors
Asma Hashmi
10/25/2025
Violation issued (FDNY_NOV, closed)
10/25/2025
Violation issued (FDNY_NOV, closed)
10/14/2025
Permit issued — Mechanical Systems
B01009661-I1-MS
10/02/2025
Special inspection requirement — Mechanical Systems
Asma Hashmi
10/02/2025
Special inspection requirement — Final
Asma Hashmi
09/15/2025
Violation issued (FDNY_ORDER, closed)
06/30/2025
Violation issued (ECB, open)
Elevators
05/30/2025
Permit issued — Mechanical Systems
B01009661-I1-MS
03/18/2025
Violation issued (ECB, open)
Elevators
03/18/2025
Violation issued (ECB, open)
Elevators
01/21/2025
Violation issued (FDNY_ORDER, closed)
12/20/2024
Violation issued (FDNY_ORDER, closed)
12/20/2024
Violation issued (FDNY_ORDER, closed)
12/20/2024
Violation issued (FDNY_ORDER, closed)
12/20/2024
Violation issued (FDNY_ORDER, closed)
12/20/2024
Violation issued (FDNY_ORDER, closed)
12/20/2024
Violation issued (FDNY_ORDER, closed)
10/23/2024
Violation issued (FDNY_ORDER, closed)
10/23/2024
Violation issued (FDNY_ORDER, closed)
07/29/2024
Violation issued (ECB, open)
Elevators
07/29/2024
Violation issued (ECB, open)
Elevators
07/26/2024
Violation issued (ECB, open)
Elevators
07/24/2024
Violation issued (FDNY_ORDER, closed)
05/14/2024
Violation issued (FDNY_ORDER, closed)
05/14/2024
Violation issued (FDNY_ORDER, closed)
05/14/2024
Violation issued (FDNY_ORDER, closed)
04/18/2024
Objection resolved — Addressed
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offAtarch Group01/12/2026
DOB NOWMechanical SystemsSigned-offAtarch Group10/14/2025
DOB NOWMechanical SystemsSigned-offAtarch Group05/30/2025
BISOTISSUEDNehal Contracting02/07/2025
BISMHISSUEDKW Tech01/23/2025
BISMHISSUEDKW Tech01/24/2024
BISOTISSUEDNehal Contracting08/02/2023
BISMHISSUEDKG Construction Services02/23/2023
BISOTISSUEDKG Construction Services02/23/2023
BISOTISSUEDKG Construction Services02/23/2023
BISMHISSUEDKW Tech02/01/2023
BISPLISSUEDMar-Sal Plumbing & Heating07/06/2022
BISOTISSUEDWDF06/09/2022
BISPLISSUEDWDF06/09/2022
BISOTISSUEDNehal Contracting05/26/2022
BISMHISSUEDKG Construction Services02/23/2022
BISOTISSUEDKG Construction Services02/23/2022
BISOTISSUEDKG Construction Services02/23/2022
BISMHISSUEDKW Tech02/03/2022
BISPLISSUEDForsythe P&H11/17/2021
BISEQISSUEDPJP Installers10/05/2021
BISEQISSUEDKG Construction Services09/20/2021
BISEQISSUEDPJP Installers09/17/2021
BISMHISSUEDKW Tech08/13/2021
BISPLISSUEDMar-Sal Plumbing & Heating07/01/2021
BISMHISSUEDKG Construction Services02/23/2021
BISOTISSUEDKG Construction Services02/23/2021
BISOTISSUEDKG Construction Services02/23/2021
BISMHISSUEDKW Tech01/26/2021
BISPLISSUEDForsythe P&H11/20/2020
BISEQISSUEDPJP Installers10/06/2020
BISEQISSUEDPJP Installers09/21/2020
BISEQISSUEDKG Construction Services09/18/2020
BISOTISSUEDNehal Contracting06/02/2020
BISOTISSUEDNehal Contracting06/02/2020
BISOTISSUEDWDF06/01/2020
BISPLISSUEDMar-Sal Plumbing & Heating05/20/2020
BISEQISSUEDPJP Installers04/28/2020
BISEQISSUEDPJP Installers04/24/2020
BISEQISSUEDNehal Contracting04/22/2020
+ 13 more permits on file
2 projects · most recent 07/17/2026
Refrigeration Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/17/2026Signed-offAtarch GroupRefrigeration Systems
Refrigeration
Bally BEZA008H8-HT3D 8,452 BTU · Condensing Unit ×2
BEZA020L8-HT3D 6,907 BTU · Condensing Unit ×2
BLP207LE-S2D 7,189 BTU · Fan Coil Indoor ×2
BLP209MA-S1D 8,834 BTU · Fan Coil Indoor ×2
11/07/2025——Air Conditioning Systems
Cooling
Lg ZRNU363SRAA 35,000 BTU · Vrf Indoor ×2
ZRNU123SJSA 12,300 BTU · Vrf Indoor ×1
ZRNU243SKSA 24,200 BTU · Vrf Outdoor ×1
ZRUM048GSS0 48,000 BTU · Vrf Outdoor ×1
ZRUM060GSS0 60,000 BTU · Vrf Outdoor ×1
23 projects · most recent 10/05/2026
General Wiring Lighting
FiledStatusContractorScope
10/05/2026CompleteCharan Electrical Enterp's—
12/14/2025Permit IssuedAce Electrical ConstructionGeneral Wiring
08/04/2025CompleteVial Electric & CompanyLighting
01/27/2025CompleteApex ElectricGeneral Wiring
10/30/2023CompleteGemini Electric Co—
11/22/2022CompleteCharan Electrical Enterp'sGeneral Wiring
11/17/2022CompleteStanco System Electrical Cont—
11/17/2022Permit IssuedStanco System Electrical ContGeneral Wiring
03/07/2022Permit IssuedAnco Electl ContctngGeneral Wiring
12/06/2021CompleteCharan Electrical Enterp's—
08/05/2021CompleteCharan Electrical Enterp's—
09/14/2020CompleteCharan Electrical Enterp's—
12/26/2019Permit IssuedR.M.F. ElectricGeneral Wiring
11/27/2019CompleteCharan Electrical Enterp's—
10/17/2019CompleteKatco ElectricGeneral Wiring
1 project · most recent 07/17/2026
Concrete
FiledStatusContractorScope
07/17/2026Signed-offAtarch GroupConcrete
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
08/03/2026Fire-Resistant Penetrations and JointsMAXIM KORNGOLDspecial
08/03/2026Mechanical SystemsMAXIM KORNGOLDspecial
08/03/2026Post-installed AnchorsMAXIM KORNGOLDspecial
08/03/2026FinalMAXIM KORNGOLDprogress
07/16/2026FinalMAXIM KORNGOLDprogress
07/16/2026Fire-Resistant Penetrations and JointsMAXIM KORNGOLDspecial
07/16/2026Mechanical SystemsMAXIM KORNGOLDspecial
07/16/2026Post-installed AnchorsMAXIM KORNGOLDspecial
10/30/2025Fire-Resistant Penetrations and JointsAsma Hashmispecial
10/30/2025Post-installed AnchorsAsma Hashmispecial
10/02/2025Mechanical SystemsAsma Hashmispecial
10/02/2025FinalAsma Hashmiprogress
02/29/2024Fire-Resistant Penetrations and JointsMAXIM KORNGOLDspecial
02/28/2024FinalMAXIM KORNGOLDprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Brooklyn Academy High SchoolEducationSub-basement
Project B01297119 Alteration · Approved · 11/07/2025
H.S. 458EducationCellar, Sub-basement, Roof
Project B01009661 Alteration · Permit Entire · 02/28/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 92 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/25/2026B01009661-I1Request digital key ↗
08/15/2026B01009661-P1Request digital key ↗
08/14/2026B01009661-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits14
▸BISWORK PERMIT APPLICATION6
04/26/2019302582596Open ↗
07/19/2018340613795Open ↗
07/17/2018340613795Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
06/21/2018340613795Open ↗
09/17/2015340303246Open ↗
03/20/2015321096586Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLPC Approval/Permit4
08/15/2026B01009661-P1Open ↗
08/14/2026B01297119-I1Open ↗
08/13/2026B01009661-I1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications24
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
12/26/2018340613795Open ↗
07/07/2016321096586Open ↗
06/14/2016321096586Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/25/2026B01009661-S1Open ↗
08/25/2026B01009661-I1Open ↗
08/25/2026B01009661-P1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
06/21/2018340613795Open ↗
09/17/2015340303246Open ↗
03/20/2015321096586Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/27/2026B01009661-P1Open ↗
08/25/2026B01009661-I1Open ↗
08/23/2026B01009661-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/27/2026B01009661-P1Open ↗
08/25/2026B01009661-I1Open ↗
08/23/2026B01009661-S1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
06/21/2018340613795Open ↗
09/17/2015340303246Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
06/21/2018340613795Open ↗
09/17/2015340303246Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/20/2015321096586Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
06/21/2018340613795Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
06/21/2018340613795Open ↗
09/17/2015340303246Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
06/04/2009320027038Open ↗
▸Energy Compliance4
▸BISNYCECC ANALYSIS1
06/21/2018340613795Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/21/2018340613795Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
12/26/2018340613795Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
06/21/2018340613795Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
06/21/2018340613795Open ↗
09/17/2015340303246Open ↗
▸BIS2008 CODE TR1 REQUIRED1
06/21/2018340613795Open ↗
▸Approvals, Objections & Sign-offs17
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
12/26/2018340613795Open ↗
07/07/2016321096586Open ↗
06/14/2016321096586Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/25/2026B01009661-I1Open ↗
08/15/2026B01009661-P1Open ↗
08/14/2026B01009661-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)4
08/15/2026B01009661-P1Open ↗
08/13/2026B01009661-S1Open ↗
08/13/2026B01297119-I1Open ↗
Showing 3 of 4 on file for this type
▸BISLANDMARKS APPROVAL3
12/26/2018340613795Open ↗
06/21/2018340613795Open ↗
09/17/2015340303246Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
06/04/2009320027038Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/25/2026B01009661-I1Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
12/26/2018340613795Open ↗
06/21/2018340613795Open ↗
06/14/2016321096586Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms7
▸BISEFILING JOB APPLICATION COVER SHEET2
06/21/2018340613795Open ↗
09/17/2015340303246Open ↗
▸BISBOROUGH INTAKE FORM2
12/26/2018340613795Open ↗
12/26/2018340613795Open ↗
▸BISEFILING COVER SHEET2
03/20/2015321096586Open ↗
06/04/2009320027038Open ↗
▸BISADDITIONAL INFORMATION1
11/06/2015340303246Open ↗
▸Other Documents8
▸DOB NOWProof of Historic Building4
08/15/2026B01009661-P1Open ↗
08/14/2026B01297119-I1Open ↗
08/13/2026B01297119-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal3
08/15/2026B01009661-P1Open ↗
08/13/2026B01009661-S1Open ↗
08/13/2026B01009661-I1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
11/06/2015340303246Open ↗