← Back
BuildNYC
Four families
832 PRESIDENT STREET
BROOKLYN · Park Slope · BIN 3024739
💬 Discuss this project
1887Year Built
3Stories
C3Building Class
R7BZoning
4,156 sfGross Floor Area
4Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Four families · Owner of record: 832 President Street · 2,033 sf lot · 2.04 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofCellar, basement, and roof renovationUnder Construction39p · 5 filings · 20 docs
Bulkhead1p · 1 filing · 13 docs
Floor 3Cellar, basement, and roof renovationUnder Construction45p · 5 filings · 20 docs
Floor 2Cellar, basement, and roof renovationUnder Construction46p · 5 filings · 20 docs
Floor 1Cellar, basement, and roof renovationUnder Construction51p · 6 filings · 20 docs
CellarCellar, basement, and roof renovationUnder Construction51p · 5 filings · 20 docs
BasementCellar, basement, and roof renovationUnder Construction15p · 2 filings · 20 docs
Sub-BasementModification of existing sprinkler system30p · 4 filings · 20 docs
Site & exteriorInstallation of temporary pipe scaffold5p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Omeara Rozwat Architects2710/22/2026
832 President Street103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/04/2021$4.2M—Private party → 832 PRESIDENT STREET LLC$1,023/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Omeara Rozwat Architects510/21/2026
ABS Engineering605/14/2026
Mje Professional Services205/02/2024
Silman110/17/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J Callahan Consulting1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Creative RenovationsGeneral Contractor707/08/2026
Godfrey's Refrigerationspecialty_contractor304/09/2026
Henry Myers P & HPlumbing307/08/2026
Steel ConstructionScaffold204/09/2026
KG SprinklerFire Protection207/08/2026
Abdul ConstructionGeneral Contractor107/16/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Macia Inspection & Testin402910/21/2026
Tristate Planning Engineering8344110/31/2022
Building Lifecycle
10/21/2026
Filed — Alteration CO
FILING HEREWIITH RENOVATION IN CELLAR, BASEMENT, 1 THRU 3 AND ROOF, INCLUDING RESTORATION OF EXTERIOR FACADE WINDOW AND DOOR REPLACEMENT FRONT AND BACK WINDOW OPENING ENLARGEMENT ON REAR FACADE. BULKHEAD AND DECK ON ROOF . CONVERT FROM 4 TO 2 FAMILY.
B00785761-P4
08/21/2026
Signed off — Alteration
MODIFICATION OF EXISTNIG SPRINKLER SYSTEM ON THE CELLAR, BASEMENT, 1ST THROUGH 3RD FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY
B00786958-I1
08/14/2026
Signed off — Alteration
FILING HEREWITH MECHANICAL WORK FOR THE BUILDING AT THE ADDRESS LISTED. INCLUDES NEW VRF SYSTEM(S), BOILER, AND KITCHEN, TOILET &LAUNDRY EXHAUST SYSTEMS. NATURAL VENTILATION PROVIDED, REFER TO OT APPLICATION DRAWINGS(ARCHITECTURAL) NO CHANGE IN USE EGRESS
B00789124-I1
08/07/2026
Signed off — Alteration
B00788999-I1
08/07/2026
Special inspection requirement — Fire-Resistance Rated Construction
CHUNG CHING JEN
101 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedAbdul Construction07/15/2026
DOB NOWSprinklersSigned-offH M Sprinkler11/24/2025
DOB NOWPlumbingSigned-offHenry Myers P & H11/21/2025
DOB NOWGeneral ConstructionPermit IssuedCreative Renovations09/11/2025
DOB NOWMechanical SystemsSigned-offGodfreys Refrigeration05/27/2025
DOB NOWPlumbingSigned-offHenry Myers P & H12/16/2024
DOB NOWGeneral ConstructionPermit IssuedCreative Renovations12/12/2024
DOB NOWStructuralSigned-offCreative Renovations12/12/2024
DOB NOWGeneral ConstructionPermit IssuedCreative Renovations07/18/2024
DOB NOWStructuralSigned-offCreative Renovations07/18/2024
DOB NOWSprinklersSigned-offH M Sprinkler05/31/2024
DOB NOWMechanical SystemsSigned-offGodfreys Refrigeration05/07/2024
DOB NOWSidewalk ShedSigned-offSteel Construction05/03/2024
DOB NOWSupported ScaffoldSigned-offSteel Construction05/03/2024
DOB NOWPlumbingSigned-offHenry Myers P & H11/21/2023
DOB NOWGeneral ConstructionPermit IssuedCreative Renovations11/08/2023
DOB NOWStructuralSigned-offCreative Renovations11/02/2023
1 project · most recent 04/23/2026
Air Conditioning Systems Heating Systems
FiledStatusContractorScope
04/23/2026Signed-offGodfrey's RefrigerationAir Conditioning Systems, Heating Systems
1 project · most recent 05/14/2026
FiledStatusContractorScope
05/14/2026Signed-offKG Sprinkler—
2 projects · most recent 09/06/2026
General Wiring
FiledStatusContractorScope
09/06/2026Permit IssuedC & A ElectricalGeneral Wiring
05/02/2024CompleteRichard Neu—
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
08/01/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/01/2026Certified Sprinkler-SP-Piping Dry/Wet-UndergroundCertifiedView ↗
06/18/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/16/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/16/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/14/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/29/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/29/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/29/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/29/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
08/07/2026Fire-Resistance Rated ConstructionCHUNG CHING JENprogress
08/07/2026Fire-Resistant Penetrations and JointsCHUNG CHING JENspecial
05/28/2026Post-installed AnchorsCHUNG CHING JENspecial
05/28/2026Fire-Resistant Penetrations and JointsCHUNG CHING JENspecial
05/28/2026Sprinkler SystemsCHUNG CHING JENspecial
05/14/2026Fire-Resistant Penetrations and JointsNicholas Palumbospecial
05/14/2026FinalNicholas Palumboprogress
05/14/2026Heating SystemsNicholas Palumbospecial
05/14/2026Post-installed AnchorsNicholas Palumbospecial
05/14/2026Mechanical SystemsNicholas Palumbospecial
05/13/2026Post-installed AnchorsCHUNG CHING JENspecial
05/13/2026Sprinkler SystemsCHUNG CHING JENspecial
05/13/2026Fire-Resistant Penetrations and JointsCHUNG CHING JENspecial
04/17/2026FinalCHUNG CHING JENprogress
04/17/2026Fire-Resistant Penetrations and JointsCHUNG CHING JENspecial
04/17/2026Heating SystemsCHUNG CHING JENspecial
04/17/2026Mechanical SystemsCHUNG CHING JENspecial
04/17/2026Post-installed AnchorsCHUNG CHING JENspecial
03/13/2026Fire-Resistance Rated ConstructionCHUNG CHING JENprogress
03/13/2026Fire-Resistant Penetrations and JointsCHUNG CHING JENspecial
02/26/2025Fire-Resistance Rated ConstructionCHUNG CHING JENprogress
02/26/2025Fire-Resistant Penetrations and JointsCHUNG CHING JENspecial
77 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account