← Back
Three families
833 PUTNAM AVENUE
BROOKLYN · Bedford-Stuyvesant (East) · BIN 3045295
💬 Discuss this project
1901Year Built
3Stories
C0Building Class
R6BZoning
3,360 sfGross Floor Area
3Units
Rent Stabilized14 Open Violations ▸FDNY Report ↗
Three families · 2,000 sf lot · 1.68 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Filed — no permit issued3p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HC ARCHITECT, PC210/04/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CH CORNERSTONE DESIGN203/21/2026
Building Lifecycle
All (21)Filed (2)Violation (17)Special Inspection (2)
05/05/2026
Violation issued (HPD, open)
A
11/20/2025
Violation issued (HPD, open)
I
06/10/2025
Violation issued (HPD, open)
A
11/27/2024
Violation issued (HPD, open)
I
04/11/2024
Violation issued (HPD, open)
A
11/21/2023
Violation issued (HPD, open)
I
10/04/2023
Filed — Alteration
INTERIOR RENOVATION OF EXISTING RESIDENTIAL UNITS ON SECOND AND THIRD FLOOR. WORK INCLUDES RENOVATION OF KITCHEN AND BATHROOMS. PLUMBING INSTALLATION TO BE FILED SUBSQUENT TO THIS FILING. NO CHANGE IN USE
B00927989-S1
09/29/2023
Filed — Alteration
INTERIOR RENOVATION OF EXISTING RESIDENTIAL UNITS ON SECOND AND THIRD FLOOR. WORK INCLUDES RENOVATION OF KITCHEN AND BATHROOMS. PLUMBING INSTALLATION TO BE FILED SUBSQUENT TO THIS FILING. NO CHANGE IN USE
B00927989-I1
09/23/2023
Special inspection requirement — Fire-Resistance Rated Construction
08/31/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/24/2023
Violation issued (HPD, open)
A
11/10/2022
Violation issued (HPD, open)
I
03/01/2022
Violation issued (HPD, open)
A
03/01/2022
Violation issued (HPD, open)
I
04/12/2021
Violation issued (HPD, open)
A
04/12/2021
Violation issued (HPD, open)
I
10/31/2019
Violation issued (HPD, open)
I
10/19/2018
Violation issued (HPD, closed)
I
11/28/2017
Violation issued (HPD, closed)
I
10/13/2015
Violation issued (HPD, closed)
I
09/17/2014
Violation issued (HPD, open)
B
Nothing on file for this building.
1 project · most recent 10/04/2023
Gas Water/Sanitary
FiledStatusContractorScope
10/04/2023——Gas, Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
09/23/2023Fire-Resistance Rated Construction—progress
08/31/2023Fire-Resistant Penetrations and Joints—special
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/26/2026B00927989-S1Request digital key ↗
08/26/2026B00927989-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/26/2026B00927989-S1Open ↗
08/26/2026B00927989-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/26/2026B00927989-S1Open ↗
08/26/2026B00927989-I1Open ↗