← Back
BuildNYC
Gas or electric utility
8330 DITMAS AVENUE
BROOKLYN · Canarsie · BIN 3337432
💬 Discuss this project
0Year Built
—Stories
U2Building Class
M1-1Zoning
0 sfGross Floor Area
0Units
6 Active Violations 0 unresolved · 6 paperwork only ▸FDNY Report ↗
Gas or electric utility · 374,407 sf lot · 0 FAR built · Flood zone X
Locations of Work
Plumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1National Grid5p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
National Grid507/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
All City Engineering105/05/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Cross Check MechanicalPlumbing307/08/2026
Building Lifecycle
All (12)Filed (1)Permit Issued (3)Signed Off (1)Inspection (3)Objection (4)
03/23/2026
Signed off — Alteration
REPLACE ONE EXISTING HOT WATER HEATER WITH NEW IN THE 1ST FLOOR BOILER ROOM, NO CHANGE IN USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION.
B00868500-I1
07/23/2025
Permit issued — Plumbing
B00868500-I1-PL
07/02/2025
Permit issued — Plumbing
B00868500-I1-PL
04/08/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/13/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/06/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/23/2023
Permit issued — Plumbing
B00868500-I1-PL
05/09/2023
Objection raised — Admin
05/09/2023
Objection resolved — Addressed
05/09/2023
Objection raised — Fire_Protection
05/09/2023
Objection resolved — Addressed
05/05/2023
Filed — Alteration
REPLACE ONE EXISTING HOT WATER HEATER WITH NEW IN THE 1ST FLOOR BOILER ROOM, NO CHANGE IN USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION.
B00868500-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCross Check Mechanical07/23/2025
DOB NOWPlumbingSigned-offCross Check Mechanical07/02/2025
DOB NOWPlumbingSigned-offCross Check Mechanical08/23/2023
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/13/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Tenants in the building
TenantSpaceFloorsRenovation projects
National GridOfficeFloor 1
Project B00868500 Alteration · LOC Issued · 05/05/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 3 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/15/2026B00868500-I1Request digital key ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/27/2026B00868500-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/15/2026B00868500-I1Open ↗