1 Active Violation ▸FDNY Report ↗
Three families · Owner of record: Eslio Properties · 41,101 sf lot · 0.14 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction15p · 1 filing · 20 docs
Floor 2Under Construction25p · 1 filing · 20 docs
Floor 1Under Construction24p · 1 filing · 20 docs
CellarUnder Construction16p · 1 filing · 20 docs
BasementUnder Construction9p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Neil Wexler212/17/2024
Levin Engineering210/14/2024
Simino Architect107/17/2024
William Montague Engineering106/11/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Simino Architect103/21/2026
Levin Engineering403/21/2026
MT Avril203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
United Land Costruction IGeneral Contractor610/26/2026
Rom Piping & HeatingPlumbing209/09/2026
Perciballi IndustriesGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SRA Planning & Expediting5677312/17/2024
C&P Design Consultant8472310/14/2024
Building Lifecycle
10/22/2026
Permit renewed — General Construction
Renewed without changes
S01072853-I1-GC
09/08/2026
Permit renewed — Plumbing
Renewed without changes
S01072853-S1-PL
07/14/2026
Permit renewed — Earth Work
Renewed without changes
S01072853-S3-FO-EA
07/14/2026
Permit renewed — Structural
Renewed without changes
S01072853-S5-ST
12/12/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
66 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedUnited Land Costruction I10/22/2026
DOB NOWPlumbingPermit IssuedRom Piping & Heating09/08/2026
DOB NOWEarth WorkPermit IssuedUnited Land Costruction I07/14/2026
DOB NOWStructuralPermit IssuedUnited Land Costruction I07/14/2026
DOB NOWGeneral ConstructionPermit IssuedUnited Land Costruction I11/18/2025
DOB NOWPlumbingPermit IssuedRom Piping & Heating10/07/2025
DOB NOWFoundationPermit IssuedUnited Land Costruction I08/15/2025
DOB NOWStructuralPermit IssuedUnited Land Costruction I08/14/2025
DOB NOWFull DemolitionSigned-offPerciballi Industries09/05/2024
1 project · most recent 12/17/2024
Air Conditioning Systems
FiledStatusContractorScope
12/17/2024Permit IssuedUnited Land Costruction IAir Conditioning Systems
1 project · most recent 12/17/2024
Water/Sanitary
FiledStatusContractorScope
12/17/2024Permit IssuedRom Piping & HeatingWater/Sanitary
1 project · most recent 12/17/2024
FiledStatusContractorScope
12/17/2024Permit IssuedUnited Land Costruction I—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
12/12/2025Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
12/13/2024Concrete - Cast-In-PlaceWILLIAM MONTAGUEspecial
12/13/2024Structural Wood FrameWILLIAM MONTAGUEprogress
12/13/2024Post-installed AnchorsWILLIAM MONTAGUEspecial
12/13/2024MasonryWILLIAM MONTAGUEspecial
12/13/2024Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
12/13/2024Subsurface Conditions – Fill Placement & In-Place DensityWILLIAM MONTAGUEspecial
12/13/2024Subgrade InspectionsWILLIAM MONTAGUEspecial
12/13/2024Post-installed AnchorsWILLIAM MONTAGUEspecial
12/13/2024MasonryWILLIAM MONTAGUEspecial
09/17/2024FinalWILLIAM MONTAGUEprogress
09/17/2024Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
09/17/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationStanislav Pilipenkospecial
09/17/2024Maintenance informationStanislav Pilipenkoenergy_progress
09/17/2024HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
09/17/2024HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
09/17/2024HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
09/17/2024FinalWILLIAM MONTAGUEprogress
09/17/2024Footing and FoundationWILLIAM MONTAGUEprogress
07/12/2024Fire-Resistance Rated ConstructionStanislav Pilipenkoprogress
07/12/2024Energy Code Compliance InspectionsStanislav Pilipenkoprogress
07/12/2024Combustible Exterior Wall CoveringsStanislav Pilipenkospecial
07/12/2024Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
07/12/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationStanislav Pilipenkospecial
07/12/2024Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
07/12/2024Air barrier - visual inspectionStanislav Pilipenkoenergy_progress