← Back
Primarily 3 family with 1 store or office
838 2 AVENUE
MANHATTAN · East Midtown-Turtle Bay · BIN 1038764
💬 Discuss this project
1910Year Built
4Stories
S3Building Class
C1-9Zoning
3,960 sfGross Floor Area
4Units
Rent Stabilized4 Open Violations ▸FDNY Report ↗
Primarily 3 family with 1 store or office · Owner of record: KANAMORI AMERICA INC. · 1,260 sf lot · 3.14 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Floor 34p · 2 filings · 20 docs
Floor 21p · 1 filing · 19 docs
Floor 1
Cellar2p · 1 filing · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRIHILL MANAGEMENT1707/08/2026
KANAMORI AMERICA INC.103/22/2026
PALM MANAGMENT CORP2103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/18/2023$4.2M—838 2ND AVE LLC → KANAMORI AMERICA INC.$1,061/sf building
07/14/2021$2.8M—— → —$704/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AZARKIAN ARCHITECTURE P.C.304/25/2023
CROWN ARCH AND CONSULTING308/17/2022
BRIAN ILL DEVELOPMENT LLC403/23/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CROWN DESIGN CONSULTING603/21/2026
BUILDING VIOLATION SOLUTIONS603/21/2026
MILETO ARCH ASSOCAITE DPC803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
YONGXIN INT CONTRACTOR I*General Contractor603/21/2026
AMC PLBG, HTG & CLNG, INCPlumbing207/08/2026
ELITE PROFESSIONAL CONSTRGeneral Contractor107/08/2026
QMB PLUMBING & HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOMANI INSPECTION SERVICE843604/25/2023
BRIAN ILL DEVELOPMENT LLC1402111/29/2021
Building Lifecycle
All (84)Filed (10)Permit Issued (6)Signed Off (5)Violation (34)Inspection (9)Objection (2)Special Inspection (18)
04/01/2024
Violation issued (HPD, closed)
A
06/07/2023
Signed off — Alteration
SCOPE OF WORK: PLUMBING WORK ASSOCIATED WITH INTERIOR RENOVATION OF TWO (2) UNITS 1 AND 2.
M00624177-I1
04/29/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
04/29/2023
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
04/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
04/25/2023
Filed — Alteration
SCOPE OF WORK: PLUMBING WORK ASSOCIATED WITH INTERIOR RENOVATION OF TWO (2) UNITS 1 AND 2.
M00624177-P3
03/15/2023
Violation issued (HPD, closed)
A
02/24/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/27/2023
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
12/20/2022
Objection resolved — Addressed
12/17/2022
Objection raised — Scope
12/13/2022
Filed — Alteration
SCOPE OF WORK: PLUMBING WORK ASSOCIATED WITH INTERIOR RENOVATION OF TWO (2) UNITS 1 AND 2.
M00624177-P2
12/06/2022
Permit issued — Plumbing
M00624177-I1-PL
11/18/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
11/18/2022
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
11/18/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
11/02/2022
Violation issued (HPD, closed)
I
09/08/2022
Signed off — Alteration
SCOPE OF WORK: INTERIOR RENOVATION OF TWO (2) UNITS 1 AND 2, WHICH INCLUDES THE REMOVAL AND INSTALLATION OF PARTITIONS, FINISH UPDATES, AND NEW LIGHTING. NO CHANGE IN USE, EGRESS OROCCUPANCY.
M00617023-I1
09/06/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/18/2022
Special inspection requirement — Lighting in dwelling units
JOHN MCMONAGLE
08/18/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
08/18/2022
Special inspection requirement — Fire-Resistance Rated Construction
JOHN MCMONAGLE
08/18/2022
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
08/18/2022
Special inspection requirement — Final
JOHN MCMONAGLE
08/17/2022
Filed — Alteration
SCOPE OF WORK: INTERIOR RENOVATION OF TWO (2) UNITS 1 AND 2, WHICH INCLUDES THE REMOVAL AND INSTALLATION OF PARTITIONS, FINISH UPDATES, AND NEW LIGHTING. NO CHANGE IN USE, EGRESS OROCCUPANCY.
M00617023-P1
08/08/2022
Signed off — Alteration
INSTALL NEW COOKING EQUIPMENT AND FIRE SUPPRESION VALVE ON 1ST FLOOR KITCHEN. INSTALL NEW PLUMBING FIXTURES ON 1ST FLOOR AND CELLAR
M00631043-I1
07/27/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/06/2022
Filed — Alteration
SCOPE OF WORK: PLUMBING WORK ASSOCIATED WITH INTERIOR RENOVATION OF TWO (2) UNITS 1 AND 2.
M00624177-P1
07/01/2022
Special inspection requirement — Fire-Resistance Rated Construction
JOHN MCMONAGLE
07/01/2022
Special inspection requirement — Lighting in dwelling units
JOHN MCMONAGLE
07/01/2022
Special inspection requirement — Final
JOHN MCMONAGLE
07/01/2022
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
07/01/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
06/02/2022
Signed off — Alteration
RENOVATION OF EXISTING RESTAUNRAT ON 1ST FLOOR, INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES AND LIGHTING FIXTURES. NO CHANGE IN USE RGRESS AND OCCUPANCY
M00631007-I1
05/24/2022
Signed off — Alteration
TEMPORARY WOOD FENCE: 8'-0" HEIGHT (PAINT HUNTER GREEN)NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00653947-I1
04/06/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/23/2022
Filed — Alteration
INSTALL NEW COOKING EQUIPMENT AND FIRE SUPPRESION VALVE ON 1ST FLOOR KITCHEN. INSTALL NEW PLUMBING FIXTURES ON 1ST FLOOR AND CELLAR
M00631043-P1
03/23/2022
Special inspection requirement — Energy Code Compliance Inspections
BRIAN ILL
02/02/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/02/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/02/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/13/2022
Permit issued — Construction Fence
M00653947-I1-FN
01/07/2022
Permit issued — Plumbing
M00631043-I1-PL
01/06/2022
Filed — Alteration
TEMPORARY WOOD FENCE: 8'-0" HEIGHT (PAINT HUNTER GREEN)NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00653947-I1
01/06/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/06/2022
Special inspection requirement — Final
BRIAN ILL
12/17/2021
Permit issued — Plumbing
M00624177-I1-PL
12/08/2021
Permit issued — General Construction
M00631007-I1-GC-CX
12/07/2021
Permit issued — General Construction
M00617023-I1-GC
11/29/2021
Filed — Alteration
INSTALL NEW COOKING EQUIPMENT AND FIRE SUPPRESION VALVE ON 1ST FLOOR KITCHEN. INSTALL NEW PLUMBING FIXTURES ON 1ST FLOOR AND CELLAR
M00631043-I1
11/29/2021
Filed — Alteration
RENOVATION OF EXISTING RESTAUNRAT ON 1ST FLOOR, INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES AND LIGHTING FIXTURES. NO CHANGE IN USE RGRESS AND OCCUPANCY
M00631007-I1
11/18/2021
Filed — Alteration
SCOPE OF WORK: PLUMBING WORK ASSOCIATED WITH INTERIOR RENOVATION OF TWO (2) UNITS 1 AND 2.
M00624177-I1
11/04/2021
Filed — Alteration
SCOPE OF WORK: INTERIOR RENOVATION OF TWO (2) UNITS 1 AND 2, WHICH INCLUDES THE REMOVAL AND INSTALLATION OF PARTITIONS, FINISH UPDATES, AND NEW LIGHTING. NO CHANGE IN USE, EGRESS OROCCUPANCY.
M00617023-I1
06/24/2021
Violation issued (ECB, closed)
Construction
04/01/2021
Violation issued (HPD, closed)
A
04/01/2021
Violation issued (HPD, closed)
I
02/16/2021
Violation issued (ECB, closed)
Construction
02/16/2021
Violation issued (ECB, closed)
Plumbing
12/11/2020
Violation issued (ECB, closed)
Construction
12/11/2020
Violation issued (ECB, closed)
Construction
Latest 60 of 84 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC12/06/2022
DOB NOWConstruction FenceSigned-offYONGXIN INT CONTRACTOR I*01/13/2022
DOB NOWPlumbingSigned-offQMB PLUMBING & HEATING INC01/07/2022
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC12/17/2021
DOB NOWGeneral ConstructionSigned-offYONGXIN INT CONTRACTOR I*12/08/2021
DOB NOWGeneral ConstructionSigned-offELITE PROFESSIONAL CONSTR12/07/2021
BISOTISSUEDBAZZ CONSTRUCTION INC12/24/2020
BISEQISSUEDEVEREST SCAFFOLDING INC11/09/2015
BISEQISSUEDEVEREST SCAFFOLDING INC11/09/2015
2 projects · most recent 03/31/2023
General Wiring
FiledStatusContractorScope
03/31/2023CompleteRIGHTWAY ELECTRICAL INCGeneral Wiring
03/17/2022CompleteRNH ELECTRIC COMPANY INC—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
02/24/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/27/2023No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
09/06/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/27/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/06/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/02/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/02/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/02/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/06/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
04/29/2023HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
04/29/2023Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
04/29/2023Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
11/18/2022Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
11/18/2022Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
11/18/2022HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
08/18/2022Lighting in dwelling unitsJOHN MCMONAGLEenergy_progress
08/18/2022Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
08/18/2022Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
08/18/2022Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
08/18/2022FinalJOHN MCMONAGLEprogress
07/01/2022Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
07/01/2022Lighting in dwelling unitsJOHN MCMONAGLEenergy_progress
07/01/2022FinalJOHN MCMONAGLEprogress
07/01/2022Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
07/01/2022Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
03/23/2022Energy Code Compliance InspectionsBRIAN ILLprogress
01/06/2022FinalBRIAN ILLprogress
▾Documents — 85 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
09/03/2026M00617023-P1Request digital key ↗
09/03/2026M00617023-I1Request digital key ↗
09/03/2026M00624177-P3Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION3
12/24/2020140990710Open ↗
11/06/2015140425653Open ↗
11/06/2015140425635Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION3
12/15/2020140990710Open ↗
11/06/2015140425653Open ↗
11/06/2015140425635Open ↗
▸Seals & Professional Certifications34
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/03/2026M00617023-I1Open ↗
09/03/2026M00631007-I1Open ↗
09/03/2026M00653947-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026M00617023-I1Open ↗
09/01/2026M00617023-I1Open ↗
08/31/2026M00624177-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026M00617023-I1Open ↗
08/31/2026M00624177-I1Open ↗
08/25/2026M00624177-P2Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
12/15/2020140990710Open ↗
11/06/2015140425653Open ↗
11/06/2015140425635Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
12/15/2020140990710Open ↗
11/06/2015140425653Open ↗
11/06/2015140425635Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
12/15/2020140990710Open ↗
11/06/2015140425653Open ↗
11/06/2015140425635Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
08/27/2018140425653Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
09/03/2026M00617023-I1Open ↗
09/03/2026M00631007-I1Open ↗
09/02/2026M00631043-P1Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
12/15/2020140990710Open ↗
11/06/2015140425653Open ↗
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026M00617023-I1Open ↗
08/13/2026M00624177-I1Open ↗
09/03/2026M00631007-I1Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
11/06/2015140425635Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY7
08/16/2022140990710Open ↗
12/24/2020140990710Open ↗
12/24/2020140990710Open ↗
Showing 3 of 7 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
08/16/2022140990710Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
08/16/2022140990710Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
08/22/2022140990710Open ↗
08/27/2018140425653Open ↗
▸BISFINAL1
08/22/2022140990710Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
08/22/2022140990710Open ↗
12/15/2020140990710Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
08/22/2022140990710Open ↗
▸Filing & Intake Forms4
▸BISEFILING JOB APPLICATION COVER SHEET3
12/15/2020140990710Open ↗
11/06/2015140425653Open ↗
11/06/2015140425635Open ↗
▸BISBOROUGH INTAKE FORM1
08/27/2018140425653Open ↗
▸Other Documents1
▸BISTENANT/OCCUPANT PROTECTION PLAN 2008 CODE1
11/06/2015140425635Open ↗