← Back
BuildNYC
Five to six families
838 BAY RIDGE AVENUE
BROOKLYN · Dyker Heights · BIN 3145893
💬 Discuss this project
1926Year Built
3Stories
C2Building Class
R5BZoning
4,860 sfGross Floor Area
6Units
Rent Stabilized12 Active Violations 3 likely answered ▸FDNY Report ↗
Five to six families · Owner of record: Fai Fong · 2,500 sf lot · 1.94 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Unit 2F2p · 1 filing · 8 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Fai Fong103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Factory Engineering Works210/16/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Kon Ho Lee Consulting Engineer PLL403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY Building AssociatesGeneral Contractor107/08/2026
Catman PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Factory Engineering Works8855210/16/2023
Building Lifecycle
05/01/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
03/03/2026
Boiler inspection report filed
Initial · no defects · Accepted
06/06/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
02/07/2025
Boiler inspection report filed
Subsequent · no defects · Accepted
01/22/2025
Boiler inspection report filed
Initial · defects found · Accepted
57 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCatman Plumbing11/09/2023
DOB NOWGeneral ConstructionSigned-offNY Building Associates11/08/2023
BISOTISSUEDMohammed Halim08/07/2017
1 project · most recent 08/21/2024
General Wiring
FiledStatusContractorScope
08/21/2024CompleteIntelogic ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/11/2024Pass-Final General Construction Non-Directive 14PassView ↗
06/04/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/03/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/02/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/02/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
10/11/2023Fire-Resistant Penetrations and JointsKui Hespecial
10/11/2023Energy Code Compliance InspectionsKui Heprogress
28 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account