← Back
BuildNYC
Condo, residential unit, 1-3 unit building (orig. class 1)
838 PRESIDENT STREET
BROOKLYN · Park Slope · BIN 3024742
💬 Discuss this project
1887Year Built
—Stories
R6Building Class
R7BZoning
5,012 sfGross Floor Area
3Units
0 Active ViolationsFDNY Report ↗
Condo, residential unit, 1-3 unit building (orig. class 1) · 2,000 sf lot · 2.51 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofPlumbing fixture installationUnder Construction17p · 3 filings · 20 docs
PenthousePlumbing fixture installationUnder Construction3p · 3 filings · 20 docs
Floor 4Plumbing fixture installationUnder Construction12p · 2 filings · 20 docs
Floor 3Plumbing fixture installationUnder Construction13p · 2 filings · 20 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
President Ventures203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Raad308/20/2026
Celin Munoz Consulting Engineering111/18/2025
Not Applicable211/04/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB Building Consulting603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Filler Construction ManGeneral Contractor306/28/2026
Aspect Plumbing & Heating CoPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Raad7727308/20/2026
Celin Munoz Consulting EN1064211/18/2025
Building Lifecycle
10/07/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
09/09/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/21/2026
Special inspection requirement — Energy Code Compliance Inspections
NICHOLAS AZADIAN
08/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
NICHOLAS AZADIAN
08/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
NICHOLAS AZADIAN
51 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAspect Plumbing & Heating Co06/08/2026
DOB NOWMechanical SystemsPermit IssuedFiller Construction Man06/08/2026
DOB NOWStructuralPermit IssuedFiller Construction Man06/02/2026
DOB NOWGeneral ConstructionPermit IssuedFiller Construction Man05/28/2026
BIS—ISSUEDA B Design Build08/24/2009
BIS—ISSUEDAB Design Build02/06/2008
BISPLISSUEDAmm General Contracting08/31/2007
BISOTISSUEDA B Design Build06/05/2007
BIS—ISSUEDAB Design Build06/05/2007
BIS—ISSUEDPresident Ventures, LLPY03/01/2001
BISPLISSUEDL.richards Plumbing & Heating06/22/2000
BIS—ISSUEDPresident Ventures, LLPY06/20/2000
BISEQISSUEDPresident Ventures11/19/1999
1 project · most recent 10/10/2025
Heating and Air Conditioning Systems Heating Systems
FiledStatusContractorScope
10/10/2025Permit IssuedFiller Construction ManHeating and Air Conditioning Systems, Heating Systems
1 project · most recent 08/20/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/20/2026Permit IssuedAspect Plumbing & Heating CoGas, Storm, Water/Sanitary
1 project · most recent 11/18/2025
Steel Wood
FiledStatusContractorScope
11/18/2025Permit IssuedFiller Construction ManSteel, Wood
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
10/07/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/09/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
08/21/2026Energy Code Compliance InspectionsNICHOLAS AZADIANprogress
08/21/2026HVAC-R and service water piping design and insulationNICHOLAS AZADIANenergy_progress
08/21/2026HVAC-R and service water heating equipmentNICHOLAS AZADIANenergy_progress
08/21/2026HVAC-R and service water heating system controlsNICHOLAS AZADIANenergy_progress
08/21/2026Fire-Resistant Penetrations and JointsNICHOLAS AZADIANspecial
08/11/2026Fire-Resistant Penetrations and JointsNICHOLAS AZADIANspecial
08/11/2026HVAC-R and service water heating system controlsNICHOLAS AZADIANenergy_progress
08/11/2026HVAC-R and service water piping design and insulationNICHOLAS AZADIANenergy_progress
08/11/2026HVAC-R and service water heating equipmentNICHOLAS AZADIANenergy_progress
08/11/2026Energy Code Compliance InspectionsNICHOLAS AZADIANprogress
11/13/2025Structural Wood FrameCelin Munozprogress
11/13/2025Structural Cold-Formed SteelCelin Munozspecial
11/13/2025Structural Steel - High Strength BoltingCelin Munozspecial
11/13/2025Post-installed AnchorsCelin Munozspecial
10/30/2025FinalCelin Munozprogress
10/30/2025Structural Stability – Alterations of existing buildingsCelin Munozspecial
10/30/2025Structural Steel - DetailsCelin Munozspecial
10/30/2025Wood – Seismic ResistanceCelin Munozspecial
10/29/2025FinalBenjamin Hochbergprogress
10/29/2025Post-installed AnchorsCelin Munozspecial
09/15/2025Structural Steel - Details—special
09/15/2025Wood – Seismic Resistance—special
09/09/2025Post-installed Anchors—special
09/09/2025Structural Cold-Formed Steel—special
09/09/2025Structural Wood Frame—progress
Latest 25 of 36.
50 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account